Upload Button Icon Add office photos

MARK EXHAUST SYSTEMS

Compare button icon Compare button icon Compare

Filter interviews by

MARK EXHAUST SYSTEMS HR Manager Interview Questions and Answers

Updated 20 Sep 2023

MARK EXHAUST SYSTEMS HR Manager Interview Experiences

1 interview found

HR Manager Interview Questions & Answers

user image Gaurav Malik

posted on 20 Sep 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. About hr procedures
  • Q2. About prople development

Interview questions from similar companies

Round 1 - HR 

(1 Question)

  • Q1. What are your salary expectations?

Interview Preparation Tips

Interview preparation tips for other job seekers - Its ok. No need
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025, where I was asked the following questions.

  • Q1. Why should I be considered for this job?
  • Q2. Whenever you join for this job?
  • Q3. Can you take hard work for this job?

Interview Preparation Tips

Interview preparation tips for other job seekers - Come and take golden opportunity..
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What about your self
Round 3 - Technical 

(3 Questions)

  • Q1. After company which your responsibility
  • Q2. Machine process and material grade and melting temperature
  • Q3. Types of injection molding machine
  • Ans. 

    Types of injection molding machines include hydraulic, electric, and hybrid machines.

    • Hydraulic injection molding machines use hydraulic systems to generate the necessary pressure for the injection process.

    • Electric injection molding machines are more energy efficient and precise compared to hydraulic machines.

    • Hybrid injection molding machines combine the benefits of both hydraulic and electric machines.

    • Examples: Arburg ...

  • Answered by AI
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Injection Molding process
Round 1 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why are you looking for a change?
  • Q5. Tell me about yourself.
  • Q6. What are your strengths and weaknesses?
Round 3 - Technical 

(2 Questions)

  • Q1. Where is the rejection cantrol of the moulding machine
  • Ans. 

    The rejection control of the moulding machine is typically located on the control panel.

    • The rejection control is usually a button or switch on the control panel.

    • It may be labeled as 'reject' or 'scrap'.

    • The control allows the operator to manually reject any defective parts produced by the machine.

    • Some machines may also have an automatic rejection system that is programmed to detect and remove defective parts.

    • The locatio...

  • Answered by AI
  • Q2. Where is the injection moulding machine and problem solving
  • Ans. 

    Injection moulding machine is located in the production area and problem solving involves identifying and resolving issues with the machine and the moulds.

    • Injection moulding machine is typically located in the production area

    • Problem solving involves identifying and resolving issues with the machine and the moulds

    • Common problems include issues with the temperature, pressure, and material flow

    • Solutions may involve adjust...

  • Answered by AI

I applied via Approached by Company and was interviewed in Feb 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Confidence level

Round 3 - Case Study 

Job profile

Round 4 - Technical 

(2 Questions)

  • Q1. Related to concerns department
  • Q2. Share your experiences

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep smile , positive attitude and confidence level high

I applied via Walk-in and was interviewed before Jan 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What my job profile.
  • Q2. Company environment
  • Q3. Facilities services

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was tachnical way. And you can asked to me about my technical skills and documents knowledge and my communication skills. I have been known about key areas like as PFMEA, MSA, project DMAIC form, process validation, 4M change, 3M, SPC, OEE monitor, productivity calculation, RMC monitoring, man Power handling, I have contacted internal and external audit.

Interview Questionnaire 

1 Question

  • Q1. Forging production

Interview Preparation Tips

Interview preparation tips for other job seekers - All producation problem solve

I applied via Walk-in and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

8 Questions

  • Q1. Tell me about yourself.
  • Ans. 

    I am a production engineer with experience in optimizing manufacturing processes and ensuring efficient production.

    • Experienced production engineer

    • Skilled in optimizing manufacturing processes

    • Ensuring efficient production

    • Strong knowledge of production equipment and technologies

    • Proficient in analyzing data and implementing improvements

    • Collaborative team player

  • Answered by AI
  • Q2. What is your position in previous company ?
  • Ans. 

    I was a Senior Production Engineer in my previous company.

    • I held the position of Senior Production Engineer.

    • I was responsible for overseeing production processes and ensuring efficiency.

    • I worked closely with the production team to identify and resolve any issues.

    • I implemented improvements to optimize production output and reduce costs.

    • I collaborated with other departments to coordinate production schedules and meet dea...

  • Answered by AI
  • Q3. What is your role in it ?
  • Ans. 

    As a Production Engineer, my role is to oversee the manufacturing process, optimize production efficiency, and ensure quality control.

    • Overseeing the manufacturing process

    • Optimizing production efficiency

    • Ensuring quality control

    • Identifying and resolving production issues

    • Implementing process improvements

    • Collaborating with cross-functional teams

    • Monitoring production metrics and analyzing data

    • Creating and maintaining produc

  • Answered by AI
  • Q4. As a Jr. Quality Engineer. I have checked raw materials inspection, Dimensional inspection of job with respect to revised drawings, Leak test of job, Blasting & painting , And quality related issues with t...
  • Q5. What is the full form of DFT in painting ?
  • Ans. 

    DFT in painting stands for Dry Film Thickness.

    • DFT is the thickness of the paint film after it has dried.

    • It is measured using a coating thickness gauge.

    • The DFT is important for ensuring proper protection and appearance of the painted surface.

    • For example, a coating may require a minimum DFT of 2 mils to provide adequate corrosion protection.

    • DFT can also affect the drying time and curing of the paint.

  • Answered by AI
  • Q6. Dry Film Thickness.
  • Ans. 

    Dry film thickness refers to the thickness of a coating after it has dried and cured.

    • It is measured using a coating thickness gauge.

    • It is important to ensure that the dry film thickness meets the specifications for the coating.

    • The dry film thickness can affect the performance and durability of the coating.

    • Examples of coatings that require specific dry film thickness include paint, powder coating, and plating.

    • Dry film t...

  • Answered by AI
  • Q7. What if the DFT is more than requirement ?
  • Ans. 

    Excess DFT can lead to increased cost and longer production time.

    • Excess DFT can lead to increased material usage and waste.

    • It can also lead to longer production time and increased cost.

    • The excess DFT may also affect the performance and durability of the product.

    • It is important to ensure that the DFT is within the specified range to avoid these issues.

  • Answered by AI
  • Q8. There is a peel off and rundown in the job as DFT is more than requirement.

Interview Preparation Tips

Interview preparation tips for other job seekers - As per my opinion. Prepare your previous job experiene and basic knowledge of your respective department.

MARK EXHAUST SYSTEMS Interview FAQs

How many rounds are there in MARK EXHAUST SYSTEMS HR Manager interview?
MARK EXHAUST SYSTEMS interview process usually has 2 rounds. The most common rounds in the MARK EXHAUST SYSTEMS interview process are Resume Shortlist and One-on-one Round.
What are the top questions asked in MARK EXHAUST SYSTEMS HR Manager interview?

Some of the top questions asked at the MARK EXHAUST SYSTEMS HR Manager interview -

  1. About prople developm...read more
  2. About hr procedu...read more

Tell us how to improve this page.

MARK EXHAUST SYSTEMS HR Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

JBM Group Interview Questions
4.0
 • 281 Interviews
Varroc Group Interview Questions
3.6
 • 181 Interviews
Subros Interview Questions
3.8
 • 169 Interviews
Spark Minda Interview Questions
3.9
 • 124 Interviews
Goodyear Interview Questions
3.6
 • 55 Interviews
Shivam Autotech Interview Questions
3.6
 • 30 Interviews
Hi Tech Gears Interview Questions
3.7
 • 26 Interviews
Greaves Cotton Interview Questions
4.1
 • 24 Interviews
Talbros Interview Questions
4.0
 • 24 Interviews
View all
Engineer
75 salaries
unlock blur

₹2.1 L/yr - ₹5.5 L/yr

Senior Engineer
73 salaries
unlock blur

₹3.6 L/yr - ₹7.2 L/yr

Assistant Manager
53 salaries
unlock blur

₹5.7 L/yr - ₹9.3 L/yr

Quality Engineer
49 salaries
unlock blur

₹1.6 L/yr - ₹5.1 L/yr

Assistant Engineer
40 salaries
unlock blur

₹1.7 L/yr - ₹5.7 L/yr

Explore more salaries
Compare MARK EXHAUST SYSTEMS with

JBM Group

4.0
Compare

Subros

3.8
Compare

Varroc Group

3.6
Compare

Endurance Technologies

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview