i
Filter interviews by
I applied via campus placement at Bangalore Institute Of Technology (BIT) and was interviewed before Mar 2022. There were 3 interview rounds.
Questions based on mathematics and physics are asked.
I applied via Recruitment Consultant and was interviewed before Jul 2020. There were 3 interview rounds.
P2P process refers to the end-to-end process of procuring goods and services, from requisition to payment.
P2P process involves several steps such as requisition, approval, purchase order creation, receipt of goods/services, invoice processing, and payment
Procurement process involves identifying the need, selecting suppliers, negotiating contracts, and managing supplier relationships
As a Purchase Engineer, my role would...
Top trending discussions
I applied via Walk-in and was interviewed in Nov 2024. There were 6 interview rounds.
Experienced engineer with a background in mechanical and electrical engineering, specializing in project management and problem-solving.
Bachelor's degree in Mechanical Engineering from XYZ University
5+ years of experience working in the automotive industry
Proficient in CAD software such as SolidWorks and AutoCAD
Led a team of engineers to successfully launch a new product line
The toolroom is typically organized in a hierarchical structure with a manager overseeing toolmakers and machinists.
Typically led by a Toolroom Manager who oversees the operations
Toolmakers and machinists report to the Toolroom Manager
May have specialized teams for different types of tools or machinery
Collaborates closely with engineering and production departments
Mold maintenance involves regular cleaning, inspection, and repair of molds used in manufacturing processes.
Regularly clean molds to prevent buildup of residue or contaminants
Inspect molds for wear and tear, cracks, or other damage
Repair any issues found during inspection to ensure molds function properly
Store molds properly when not in use to prevent damage or contamination
Encourage a positive culture that fosters the development of new ideas and activities for improvement.
Corrective action is taken to address an existing issue, while preventive action is taken to avoid potential issues in the future.
Corrective action is reactive, addressing problems that have already occurred.
Preventive action is proactive, aiming to prevent problems from happening in the first place.
Corrective action focuses on fixing the root cause of a problem.
Preventive action focuses on identifying and eliminating ...
Preventive maintenance is scheduled maintenance performed on a regular basis to prevent breakdowns, while predictive maintenance uses data and analytics to predict when equipment will fail.
Preventive maintenance is scheduled at regular intervals to prevent breakdowns.
Predictive maintenance uses data and analytics to predict when equipment will fail.
Preventive maintenance is time-based, while predictive maintenance is c...
Breakdown maintenance is a type of maintenance where equipment is only repaired after it has broken down.
Breakdown maintenance is reactive in nature, as repairs are only done after a breakdown occurs.
It can lead to increased downtime and production losses.
This type of maintenance is usually more costly compared to preventive maintenance.
Examples include fixing a machine only when it stops working or repairing a vehicle
The frequency of preventive maintenance varies depending on the equipment and industry standards.
Frequency of preventive maintenance is typically determined by equipment manufacturer recommendations.
Some industries may have specific regulations or standards that dictate the frequency of preventive maintenance.
Factors such as usage, environmental conditions, and criticality of the equipment can also influence the freque...
Lifter pad and lifter are different components used in mechanical systems.
Lifter pad is a component used to support and lift heavy objects, while lifter is a device used to lift and move objects vertically.
Lifter pads are often made of rubber or other materials to provide cushioning and grip, while lifters can be hydraulic, pneumatic, or mechanical.
Lifter pads are stationary and provide a stable base for lifting, while...
The frequency of tool life refers to how often a tool needs to be replaced or maintained.
Frequency of tool life is determined by factors such as material being worked on, cutting speed, and tool material.
Higher cutting speeds or harder materials may require more frequent tool changes.
Regular maintenance and monitoring can help extend tool life and reduce frequency of replacements.
I was interviewed in Jan 2025.
posted on 20 Jan 2025
I was interviewed in Dec 2024.
posted on 23 Dec 2024
I applied via Campus Placement and was interviewed in Nov 2024. There were 4 interview rounds.
It been from your studies and some from general knowledge and few are technical
GD is about the new technology in automotive industry
I have 5 years of experience working in the automotive industry as a mechanical engineer.
Designed and implemented new components for vehicles
Performed testing and analysis on vehicle systems
Collaborated with cross-functional teams to solve engineering challenges
I have worked on various projects including designing a new software system for a manufacturing company and implementing a renewable energy solution for a community.
Designed and implemented a new software system for a manufacturing company to streamline production processes
Developed a renewable energy solution for a community by installing solar panels and wind turbines
Collaborated with a team of engineers to optimize ...
Injection molding machine works by melting plastic pellets and injecting the molten material into a mold to create a solid object.
Plastic pellets are fed into a heated barrel where they are melted
The molten plastic is then injected into a mold cavity under high pressure
The plastic cools and solidifies in the mold, taking its shape
New technology developments include faster cycle times, improved energy efficiency, and en...
I was interviewed in Jan 2025.
I applied via Company Website and was interviewed before Sep 2022. There were 6 interview rounds.
All are industrial related questions
Our personal behavior related like communication skill and all.
Essay writing in drive shaft assembly
I applied via Approached by Company and was interviewed in Dec 2024. There were 3 interview rounds.
based on 4 interviews
Interview experience
based on 40 reviews
Rating in categories
Quality Engineer
18
salaries
| ₹3 L/yr - ₹4.7 L/yr |
QA Engineer
11
salaries
| ₹2.4 L/yr - ₹4.6 L/yr |
Production Engineer
11
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Quality Executive
9
salaries
| ₹3 L/yr - ₹3 L/yr |
Design Engineer
7
salaries
| ₹3.3 L/yr - ₹6.3 L/yr |
Bharat Forge
Samvardhana Motherson Group
TVS Sundram Fasteners
Rane Holdings