I applied via Referral and was interviewed in Apr 2023. There were 2 interview rounds.
Different types of protections used in 110 kV feeders
Overcurrent protection
Distance protection
Differential protection
Directional overcurrent protection
Earth fault protection
Under/overvoltage protection
posted on 17 May 2023
I applied via Referral and was interviewed in Apr 2023. There were 2 interview rounds.
Different types of protections used in 110 kV feeders
Overcurrent protection
Distance protection
Differential protection
Directional overcurrent protection
Earth fault protection
Under/overvoltage protection
posted on 24 Jul 2022
I applied via Walk-in
Power system , machine, testing, erection
Construction of 132/33 kv substation involves site selection, design, procurement, installation, and commissioning of equipment.
Site selection based on factors like proximity to load centers, availability of land, and accessibility
Design includes layout, electrical system design, and protection system design
Procurement of equipment like transformers, circuit breakers, and switchgear
Installation involves civil works, eq...
based on 8 reviews
Rating in categories
Electrician
62
salaries
| ₹0.8 L/yr - ₹3.8 L/yr |
Assistant Engineer
56
salaries
| ₹5.1 L/yr - ₹16 L/yr |
Technician
43
salaries
| ₹1.2 L/yr - ₹3.5 L/yr |
Junior Engineer
30
salaries
| ₹1 L/yr - ₹8 L/yr |
Operator
23
salaries
| ₹1.5 L/yr - ₹3.6 L/yr |
Tata Power
Adani Power
NTPC
Power Grid Corporation of India