Filter interviews by
posted on 8 Nov 2024
I applied via Recruitment Consulltant and was interviewed before Nov 2023. There were 2 interview rounds.
I appeared for an interview before Mar 2024, where I was asked the following questions.
Seamless pipes are cylindrical tubes made without seams, offering high strength and durability for various applications.
Manufactured through processes like extrusion or rotary piercing, ensuring uniform thickness.
Commonly used in high-pressure applications, such as oil and gas pipelines.
Available in various materials, including carbon steel, stainless steel, and alloy steel.
Examples include ASTM A106 for high-temperatu...
The process of transforming a billet into a seamless pipe is called rotary piercing followed by elongation.
Rotary piercing: A method where a heated billet is pierced to create a hollow tube.
Elongation: The hollow tube is then elongated to the desired length using a mandrel.
Finishing: The pipe undergoes further processes like heat treatment and surface finishing.
Example: This process is commonly used in the production o
posted on 3 Sep 2022
Maharashtra Seamless interview questions for popular designations
I applied via Referral and was interviewed before Dec 2021. There were 2 interview rounds.
Seamless tube manufacturing process involves heating a solid billet and piercing it with a mandrel to create a hollow tube.
The process starts with selecting the appropriate material for the tube.
The billet is heated to a high temperature and then pierced with a mandrel.
The tube is then rolled and stretched to achieve the desired dimensions and properties.
The final step involves cutting the tube to the required length a...
Get interview-ready with Top Maharashtra Seamless Interview Questions
I applied via Naukri.com and was interviewed before May 2023. There was 1 interview round.
As an Electrical Engineer, my responsibility within the plant includes designing, testing, and maintaining electrical systems to ensure smooth operations.
Designing electrical systems for optimal plant operations
Testing and troubleshooting electrical equipment to ensure functionality
Maintaining electrical systems to prevent downtime and ensure safety
Collaborating with other engineers and plant personnel to address elect...
I applied via Referral and was interviewed in Nov 2021. There were 4 interview rounds.
Vector group is a code used to represent the phase displacement and connection type of transformer windings.
Vector group determines the phase shift between the primary and secondary windings of a transformer.
It also indicates the connection type of the windings, such as Y-Y, Y-Δ, Δ-Y, or Δ-Δ.
The vector group code consists of a combination of letters and numbers, such as YNd11 or Dyn11.
The first letter represents the pr...
Three phase IM works on the principle of rotating magnetic field produced by three phase AC supply.
Three phase AC supply is given to the stator winding which produces a rotating magnetic field.
The rotor winding is short-circuited and the rotating magnetic field induces a current in it.
The interaction between the stator and rotor magnetic fields produces torque which rotates the rotor.
The speed of the rotor is slightly ...
Starters in 3-ph Im
Starters are used to control the starting and stopping of 3-phase induction motors.
Direct-on-line (DOL) starters are the simplest type of starters.
Soft starters and variable frequency drives (VFDs) are more advanced types of starters.
Starters protect the motor from overloading and overheating.
Starters also provide a means of reversing the motor's direction of rotation.
I applied via Walk-in and was interviewed in Mar 2022. There were 3 interview rounds.
Controlling inventory levels is crucial for efficient operations and maximizing profits.
Prevents overstocking and understocking
Reduces storage costs and waste
Ensures timely delivery to customers
Helps in forecasting demand and planning production
Maximizes profits by minimizing stockouts and markdowns
I applied via Campus Placement
I applied via Approached by Company and was interviewed before Feb 2022. There were 3 interview rounds.
Top trending discussions
The duration of Maharashtra Seamless interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 47 interviews
Interview experience
based on 427 reviews
Rating in categories
Junior Engineer
130
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Assistant Engineer
99
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Senior Engineer
77
salaries
| ₹5 L/yr - ₹10.5 L/yr |
Engineer
69
salaries
| ₹2.2 L/yr - ₹8.4 L/yr |
Production Engineer
60
salaries
| ₹2.1 L/yr - ₹6.6 L/yr |
JK Cement
ACC
Shree Cement
Dalmia Bharat Cement