i
Mahalakshmi Profiles
Filter interviews by
I was interviewed before Aug 2022.
BBS stands for Bar Bending Schedule, it is a detailed list of reinforcement bars with their lengths and bending shapes required for construction.
BBS is prepared based on structural drawings and specifications provided by the structural engineer.
It includes details such as bar mark, bar diameter, cutting length, shape codes, and quantity of each type of reinforcement bar.
Calculating BBS involves determining the total qu...
To take a level using an auto level machine, follow these steps.
Set up the auto level on a stable tripod at a known benchmark point.
Adjust the auto level until the bubble is centered in the vial.
Look through the eyepiece and focus on the staff held by a second person at the point to be measured.
Read the measurement displayed on the auto level.
Record the measurement and move to the next point to be measured.
There are different grades of concrete used in construction, such as M10, M15, M20, etc.
Concrete is classified into different grades based on its compressive strength.
Common grades of concrete include M10, M15, M20, M25, etc.
The grade of concrete required for a specific project depends on factors like the design mix, structural requirements, and environmental conditions.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 2 interview rounds.
Construction and maintenance of GIS buildings involves planning, design, construction, and ongoing upkeep of the facility.
GIS building construction requires detailed planning and design to ensure the facility meets the specific needs of the project.
Regular maintenance is essential to keep the GIS building in optimal condition and prevent costly repairs in the future.
Maintenance tasks may include HVAC system checks, roo...
I applied via Walk-in and was interviewed in Oct 2024. There was 1 interview round.
OHT stands for Overhead Tank. It is a water storage tank placed at a height to provide water pressure for distribution.
OHT is typically placed on the roof of a building or on a tower to ensure gravity-fed water supply.
The water is pumped into the OHT from a water source like a borewell or municipal supply.
The height of the OHT determines the water pressure available for distribution.
Pipes are connected from the OHT to ...
FHTC stands for First Horizontal Tangent Point, a key element in highway design.
FHTC marks the beginning of a horizontal curve on a highway.
It is typically located at the point where the road transitions from a straight section to a curved section.
Proper placement of FHTC is crucial for ensuring safe and efficient traffic flow.
Design considerations at FHTC include curve radius, superelevation, and sight distance.
FHTC i...
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 2 interview rounds.
Construction and maintenance of GIS buildings involves planning, design, construction, and ongoing upkeep of the facility.
GIS building construction requires detailed planning and design to ensure the facility meets the specific needs of the project.
Regular maintenance is essential to keep the GIS building in optimal condition and prevent costly repairs in the future.
Maintenance tasks may include HVAC system checks, roo...
I applied via Naukri.com and was interviewed before Dec 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.
M20 grade of concrete has a compressive strength of 20 N/mm² after 28 days.
M20 grade of concrete is a mix of 1:1.5:3 cement, sand, and aggregate respectively.
It is commonly used for residential and commercial construction.
The compressive strength of M20 grade concrete after 28 days is 20 N/mm².
This strength can be achieved by proper curing and water-cement ratio.
I applied via Monster and was interviewed in Dec 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Dec 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Feb 2021. There were 3 interview rounds.
Interview experience
Business Development Officer
19
salaries
| ₹1.8 L/yr - ₹3.1 L/yr |
Executive Accountant
10
salaries
| ₹1.1 L/yr - ₹3.5 L/yr |
Electrical Engineer
10
salaries
| ₹2.2 L/yr - ₹5.1 L/yr |
Senior Engineer
8
salaries
| ₹1 L/yr - ₹7.2 L/yr |
Quality Engineer
8
salaries
| ₹2 L/yr - ₹3.3 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
ArcelorMittal Nippon Steel