Upload Button Icon Add office photos

Madina Group

Compare button icon Compare button icon Compare

Filter interviews by

Madina Group Piping Engineer Interview Questions and Answers

Updated 9 Oct 2024

Madina Group Piping Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is Piping procedure
  • Ans. 

    Piping procedure is a set of guidelines and steps followed in the design, fabrication, installation, and testing of piping systems.

    • Piping procedure includes determining the layout and routing of pipes based on the project requirements.

    • It involves selecting the appropriate materials for the pipes and fittings to ensure compatibility and durability.

    • Welding, bending, and joining techniques are specified in the piping proc...

  • Answered by AI
  • Q2. What is Isolation
  • Ans. 

    Isolation in piping engineering refers to the process of separating a section of piping system from the rest for maintenance or safety purposes.

    • Isolation involves closing off valves to prevent flow of fluids in a specific section of piping.

    • Isolation may be necessary for maintenance, repair, or safety reasons.

    • Examples of isolation methods include using spectacle blinds, line blinds, or double block and bleed valves.

    • Isol...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What is your last company
  • Ans. 

    My last company was a multinational engineering firm specializing in oil and gas projects.

    • Worked on designing piping systems for oil and gas refineries

    • Collaborated with other engineers to ensure project deadlines were met

    • Participated in site visits to oversee installation of piping systems

  • Answered by AI
  • Q2. What is your expectations
  • Ans. 

    I expect a challenging role where I can utilize my skills and knowledge to contribute to the success of the projects.

    • Expectation of working on diverse projects to enhance skills

    • Opportunity to collaborate with a team of experienced professionals

    • Desire for continuous learning and growth in the field

    • Expectation of a supportive work environment to thrive in

  • Answered by AI

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed before Oct 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Differ between pipe and tube?
  • Ans. 

    Pipe is measured by its inner diameter, while tube is measured by its outer diameter.

    • Pipe is used to transport fluids or gases, while tube is often used for structural purposes.

    • Pipe is typically manufactured to specific industry standards, while tube may have more variation in size and thickness.

    • Examples: PVC pipe for plumbing, steel tube for construction.

  • Answered by AI
  • Q2. Welding requirements?
Round 2 - Technical 

(2 Questions)

  • Q1. Before hydrotest what requirements?
  • Ans. 

    Before hydrotest, the requirements include completion of piping installation, flushing, cleaning, and pressure testing.

    • Completion of piping installation to ensure all components are in place

    • Flushing to remove any debris or contaminants from the piping system

    • Cleaning to ensure the piping system is free from any foreign materials

    • Pressure testing to verify the integrity of the piping system under operating conditions

  • Answered by AI
  • Q2. How do prepare the material requirements?

Interview Preparation Tips

Topics to prepare for Arabian Industries Piping Engineer interview:
  • Piping
  • Fabrication relted
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed before Oct 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Differ between pipe and tube?
  • Ans. 

    Pipe is measured by its inner diameter, while tube is measured by its outer diameter.

    • Pipe is used to transport fluids or gases, while tube is often used for structural purposes.

    • Pipe is typically manufactured to specific industry standards, while tube may have more variation in size and thickness.

    • Examples: PVC pipe for plumbing, steel tube for construction.

  • Answered by AI
  • Q2. Welding requirements?
Round 2 - Technical 

(2 Questions)

  • Q1. Before hydrotest what requirements?
  • Ans. 

    Before hydrotest, the requirements include completion of piping installation, flushing, cleaning, and pressure testing.

    • Completion of piping installation to ensure all components are in place

    • Flushing to remove any debris or contaminants from the piping system

    • Cleaning to ensure the piping system is free from any foreign materials

    • Pressure testing to verify the integrity of the piping system under operating conditions

  • Answered by AI
  • Q2. How do prepare the material requirements?

Interview Preparation Tips

Topics to prepare for Arabian Industries Piping Engineer interview:
  • Piping
  • Fabrication relted
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before May 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Isometric drawing based questions and Safety based questions
Round 3 - HR 

(1 Question)

  • Q1. Salary Availability for company
Round 4 - One-on-one 

(1 Question)

  • Q1. Final in Site Construction manager asking some technical questions

Madina Group Interview FAQs

How many rounds are there in Madina Group Piping Engineer interview?
Madina Group interview process usually has 2 rounds. The most common rounds in the Madina Group interview process are HR and Technical.
What are the top questions asked in Madina Group Piping Engineer interview?

Some of the top questions asked at the Madina Group Piping Engineer interview -

  1. What is Piping proced...read more
  2. What is Isolat...read more

Tell us how to improve this page.

Madina Group Piping Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Wipro Interview Questions
3.7
 • 5.6k Interviews
Tata Group Interview Questions
4.2
 • 358 Interviews
Adani Group Interview Questions
3.9
 • 185 Interviews
Essar Group Interview Questions
3.8
 • 28 Interviews
Hinduja Group Interview Questions
4.0
 • 23 Interviews
View all

Madina Group Piping Engineer Reviews and Ratings

based on 3 reviews

4.4/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

4.4

Company culture

3.5

Promotions

5.0

Work satisfaction

Explore 3 Reviews and Ratings
Mechanical Technician
42 salaries
unlock blur

₹5.8 L/yr - ₹12.5 L/yr

Instrumentation Technician
23 salaries
unlock blur

₹5 L/yr - ₹12 L/yr

Mechanical Supervisor
20 salaries
unlock blur

₹6.7 L/yr - ₹19 L/yr

Piping Supervisor
12 salaries
unlock blur

₹7.2 L/yr - ₹18 L/yr

Electrical Technician
10 salaries
unlock blur

₹6.9 L/yr - ₹10.5 L/yr

Explore more salaries
Compare Madina Group with

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Adani Group

3.9
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview