I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.
The three main things in a hydrotest test pack are pressure gauges, test pumps, and test plugs.
Pressure gauges are used to measure the pressure during the hydrotest.
Test pumps are used to generate the required pressure for the test.
Test plugs are used to seal off the openings in the system being tested.
Cement coating standards ensure the quality and durability of cross country pipelines.
Cement coating standards specify the thickness and composition of the coating.
Standards also define the application and curing processes for the coating.
Coating standards ensure protection against corrosion and mechanical damage.
Examples of cement coating standards include API RP 5L2 and ISO 21809-1.
Materials are stored in designated areas based on type and requirements.
Materials are stored in designated areas based on type and requirements
Proper labeling and organization is maintained to ensure easy access and inventory control
Temperature and humidity control may be necessary for certain materials
Regular inspections and audits are conducted to ensure compliance with storage guidelines
Yes, I have extensive experience working in civil infrastructure.
Managed QA/QC processes for various civil infrastructure projects
Ensured compliance with industry standards and regulations
Implemented quality control measures to improve project outcomes
Collaborated with engineers and contractors to address quality issues
Performed inspections and audits to verify quality of work
Examples: oversaw construction of bridges,
It was based on round 1,similar questions were asked, but client ask me about manufacturing process and i told to the Aramco that, i don't have experience in manufacturing, i got only experience in Construction site, but client Aramco told me your based on your site experience, we need your inputs in manufacturing
The main problem facing the project is the lack of clear communication between team members.
Lack of clear communication leading to misunderstandings and delays
Team members not sharing important information with each other
Difficulty in coordinating tasks and aligning goals
Possible solutions include regular team meetings, clear communication channels, and project management tools
Different types of level instruments can be used in different applications depending on the requirements.
For continuous level measurement, ultrasonic level sensors can be used.
For point level detection, capacitance level switches can be used.
For high-temperature applications, guided wave radar level sensors can be used.
For corrosive or aggressive liquids, magnetic level gauges can be used.
For level measurement in open
I applied via Company Website and was interviewed in Apr 2022. There was 1 interview round.
I applied via Company Website and was interviewed in Apr 2022. There was 1 interview round.
based on 8 reviews
Rating in categories
QA QC Engineer
28
salaries
| ₹6.9 L/yr - ₹26 L/yr |
HSE Officer
25
salaries
| ₹5.5 L/yr - ₹16 L/yr |
Mechanical Engineer
22
salaries
| ₹6.6 L/yr - ₹16 L/yr |
Piping Supervisor
20
salaries
| ₹5.7 L/yr - ₹15 L/yr |
Planning Engineer
19
salaries
| ₹6 L/yr - ₹22.6 L/yr |
L&T Construction
Tata Projects
Sterlite Power
BHEL