Upload Button Icon Add office photos

NBTC GROUP

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

NBTC GROUP Construction Management Interview Questions and Answers

Updated 18 May 2018

NBTC GROUP Construction Management Interview Experiences

1 interview found

I appeared for an interview in Jan 2018.

Interview Questionnaire 

2 Questions

  • Q1. 1) Technical / management Written Questions, including organization chart 2) Discussion for Project completion / details, 2) Questions from relevant Experience. 4) Expertise & Achievement 5) Project ...
  • Q2. 1) Joining Details 2) Salary offer with break up 3) Tentative offer and Acceptance 4) Offer letter & Acceptance 5) Visa formality 6) Mobilization

Interview Preparation Tips

Round: Resume Shortlist
Experience: Relevant Experience, Edu- Qualification, Training, project / Clients

Round: Case Study Interview
Experience: How to Manage when project is going on in delay schedule

General Tips: I suggest job Seekers, when will go for interview Please go with home work, tell us the real fact during interview, question is out of your experience.... politely say i am searching such type of Experience to help your organization and how to increase your capability / strength and control your weakness and trying to minimize,
Skills: Leadership Skills, Communication, Problem Solving, Analytical Skills, Presentation Skills, Time Management, Decision Making Skills

Sun Pharmaceutical Industries

Join us and thrive in a company culture that inspires and empowers.

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Apr 2022. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through the profile properly. Some profile needs efforts. They will give good salary also. You need to show your competency while working in TPL.

Interview Questionnaire 

1 Question

  • Q1. Sequence of toilets finishes
  • Ans. 

    The sequence of toilet finishes refers to the order in which different materials and fixtures are installed in a toilet during construction or renovation.

    • The first step is usually to install the plumbing and drainage system for the toilet.

    • Next, the walls and floors are prepared and waterproofed.

    • After that, the fixtures such as toilets, sinks, and urinals are installed.

    • Following the installation of fixtures, the walls a...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-

I appeared for an interview in Aug 2022.

Interview Preparation Tips

Interview preparation tips for other job seekers - Describe confidently about your roles & Responsibility, make them able to understand easily about your skills.

Interview Questionnaire 

1 Question

  • Q1. Tell me about your self

Interview Questionnaire 

3 Questions

  • Q1. What are the different issues(technical & administrative) faced during the execution of works and how you solved them?
  • Ans. 

    Technical and administrative issues during construction execution and their solutions

    • Technical issues: delays due to weather, equipment breakdowns, design changes. Solutions: contingency plans, regular maintenance, clear communication with stakeholders

    • Administrative issues: budget constraints, permit delays, labor shortages. Solutions: cost-saving measures, proactive permit applications, subcontracting

    • Effective project...

  • Answered by AI
  • Q2. How much of quantity of piping done at ur location and the total duration for the completion of the same.
  • Ans. 

    The quantity of piping done at our location and the total duration for completion varied depending on the project.

    • The quantity of piping done at our location ranged from project to project.

    • The total duration for completion also varied based on the size and complexity of the project.

    • For example, in one project, we installed approximately 10,000 feet of piping, which took us around 6 months to complete.

    • In another project...

  • Answered by AI
  • Q3. Types of valves, hydrotesting pressure in pipe lines, Units of pressure and their conversions
  • Ans. 

    Answering questions on types of valves, hydrotesting pressure in pipe lines, and units of pressure and their conversions.

    • Types of valves include gate, globe, ball, butterfly, and check valves.

    • Hydrotesting pressure is the pressure used to test the strength and integrity of a pipeline.

    • Units of pressure include psi, bar, kPa, and MPa.

    • Conversions between units of pressure can be done using conversion factors.

    • For example, 1

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before Sep 2022. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

I applied via Walk-in and was interviewed before Jan 2021. There were 4 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be sound in technical and confident.
Present yourself politely and with confidence.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.

Skills evaluated in this interview

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I appeared for an interview in Jan 2025.

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with all preparation
Contribute & help others!
anonymous
You can choose to be anonymous

Recently Viewed

SALARIES

IndustryBuying.com

SALARIES

IndustryBuying.com

INTERVIEWS

Saudi Aramco

No Interviews

SALARIES

Shell

INTERVIEWS

Al Turki Enterprises

No Interviews

JOBS

IndustryBuying.com

No Jobs

SALARIES

IndustryBuying.com

SALARIES

IndustryBuying.com

INTERVIEWS

NBTC GROUP

No Interviews

INTERVIEWS

Saudi Aramco

No Interviews

Tell us how to improve this page.

HCLTech

Workplace transformation starts with you

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 744 Interviews
Tata Projects Interview Questions
4.2
 • 426 Interviews
Shell Interview Questions
4.0
 • 191 Interviews
Adani Group Interview Questions
3.9
 • 187 Interviews
Schlumberger Interview Questions
4.0
 • 136 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all

NBTC GROUP Construction Management Reviews and Ratings

based on 3 reviews

4.0/5

Rating in categories

4.9

Skill development

4.0

Work-life balance

3.1

Salary

4.9

Job security

4.0

Company culture

3.1

Promotions

4.0

Work satisfaction

Explore 3 Reviews and Ratings
QA QC Engineer
28 salaries
unlock blur

₹6.9 L/yr - ₹26 L/yr

HSE Officer
24 salaries
unlock blur

₹8.3 L/yr - ₹16 L/yr

Mechanical Engineer
22 salaries
unlock blur

₹6.6 L/yr - ₹16 L/yr

Piping Supervisor
20 salaries
unlock blur

₹6.6 L/yr - ₹15 L/yr

Planning Engineer
19 salaries
unlock blur

₹6 L/yr - ₹22.6 L/yr

Explore more salaries
Compare NBTC GROUP with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Sterlite Power

4.0
Compare

BHEL

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview