Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by M2k Group Team. If you also belong to the team, you can get access from here

M2k Group Verified Tick

Compare button icon Compare button icon Compare
3.3

based on 49 Reviews

Filter interviews by

M2k Group Site Engineer Interview Questions, Process, and Tips

Updated 26 Dec 2024

M2k Group Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image veerendra kumar chandar

posted on 26 Dec 2024

Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(7 Questions)

  • Q1. What type of drawing are you referring to? 4 type
  • Ans. 

    The four types of drawings commonly referred to in engineering are architectural drawings, structural drawings, mechanical drawings, and electrical drawings.

    • Architectural drawings: show the layout and design of a building or structure

    • Structural drawings: detail the framework and support systems of a building

    • Mechanical drawings: focus on machinery and mechanical components

    • Electrical drawings: depict the electrical syste

  • Answered by AI
  • Q2. What is the capacity of soil?p
  • Ans. 

    The capacity of soil refers to its ability to support loads without undergoing excessive settlement or deformation.

    • Capacity of soil is determined by factors such as soil type, density, moisture content, and compaction.

    • It is typically measured in terms of bearing capacity, which is the maximum load that the soil can support without failure.

    • Different types of soil have different capacities, with dense, compacted soils ge...

  • Answered by AI
  • Q3. About personal details
  • Q4. How much shuttering provide in200 m3 concrete
  • Ans. 

    The amount of shuttering required for 200 m3 of concrete depends on the type of structure and formwork design.

    • The amount of shuttering required will vary based on the complexity of the structure and the formwork design.

    • Typically, for simple structures like slabs, around 2-3% of the concrete volume may be used for shuttering.

    • For more complex structures like columns or beams, the percentage of concrete volume used for sh...

  • Answered by AI
  • Q5. Means of 500D of steel
  • Ans. 

    500D steel refers to a specific grade of steel used in construction for reinforcement purposes.

    • 500D steel is a type of high-strength steel commonly used in construction for reinforcing concrete structures

    • It has a minimum yield strength of 500 megapascals (MPa)

    • The 'D' in 500D stands for ductility, indicating that the steel has good ductility properties

    • 500D steel is often used in high-rise buildings, bridges, and other s...

  • Answered by AI
  • Q6. Means of 500D in steel
  • Ans. 

    500D in steel refers to the yield strength of the steel, indicating its ability to withstand stress before deformation.

    • 500D in steel means the steel has a yield strength of 500 megapascals (MPa)

    • This indicates the amount of stress the steel can withstand before it starts to deform

    • Higher the yield strength, stronger the steel and better its ability to support structures

    • Commonly used in construction for beams, columns, an

  • Answered by AI
  • Q7. How much shuttering are provide in 200 m3 concrete
  • Ans. 

    The amount of shuttering required for 200 m3 of concrete depends on the type of structure and complexity of formwork.

    • The amount of shuttering needed will vary based on the size and shape of the concrete structure.

    • Typically, for simple structures like slabs or columns, around 2-3% of the concrete volume may be used for shuttering.

    • For more complex structures like beams or walls, the percentage of concrete volume used for...

  • Answered by AI

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Just construction activities
Round 3 - HR 

(1 Question)

  • Q1. Just Salary negotiations
Round 4 - Behavioral 

(1 Question)

  • Q1. Position and Salary Finalisation

Interview Preparation Tips

Topics to prepare for Ashar group Site Engineer interview:
  • Construction Activity
  • finishing
  • Billing
  • Site Supervision
Interview preparation tips for other job seekers - Just be confident and prompt

I applied via Newspaper Ad and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

Question related to civil site work

Round 3 - One-on-one 

(2 Questions)

  • Q1. Work and topic related questions
  • Q2. What is minimum cememt at M20?
  • Ans. 

    The minimum cement content for M20 grade concrete is 320 kg/m3.

    • M20 grade concrete has a compressive strength of 20 MPa.

    • The minimum cement content is determined based on the water-cement ratio and the maximum size of aggregates.

    • The minimum cement content for M20 grade concrete is 320 kg/m3.

    • The cement content can be increased based on the specific requirements of the project.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Arvind Smartspaces Limited Site Engineer interview:
  • Quantity and bill
Interview preparation tips for other job seekers - Good company, management is good. Come with basic education study.

Interview Questionnaire 

1 Question

  • Q1. Ask about the BBC length of steel,past experience, Future planning & work ethics of civil engineering, drawing in civil engineering,work profile for your job,basic civil engineering.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. You can interview technical questions
  • Q2. You can interview sone technical questions
Round 2 - HR 

(1 Question)

  • Q1. Can you sellary give me
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2020. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What are your reasons for wanting to change your current company?
  • Ans. 

    Seeking new challenges and opportunities for growth in a more dynamic work environment.

    • Desire for professional growth and development

    • Seeking new challenges and projects to work on

    • Looking for a more dynamic and innovative work environment

    • Opportunity to learn new skills and technologies

    • Desire for better work-life balance

  • Answered by AI
  • Q2. How many years of experience do you have in building construction?
  • Ans. 

    I have 5 years of experience in building construction.

    • I have worked on various residential and commercial projects.

    • Managed construction teams and ensured projects were completed on time and within budget.

    • Experience with reading blueprints, conducting site inspections, and coordinating with architects and subcontractors.

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. What is compressive strength?
  • Ans. 

    Compressive strength is the ability of a material to withstand loads that reduce the size of the material without undergoing any deformation.

    • Compressive strength is a measure of the maximum load a material can withstand under compression before failure.

    • It is an important property in construction materials like concrete, masonry, and rock.

    • Compressive strength is typically measured in units of force per unit area, such a...

  • Answered by AI
  • Q2. Density of steel
  • Ans. 

    Density of steel is approximately 7850 kg/m^3.

    • Density of steel is typically around 7850 kg/m^3.

    • The density of steel can vary slightly depending on the specific alloy.

    • Density is an important factor in determining the weight of steel structures.

  • Answered by AI
  • Q3. How many days curing at column
  • Ans. 

    Curing of columns typically takes 7 days.

    • Columns generally require 7 days of curing to achieve the desired strength.

    • Curing helps in reducing cracks and increasing the durability of the concrete.

    • Proper curing is essential for the long-term performance of the column.

    • Factors like temperature, humidity, and type of concrete used can affect the curing time.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Arvind Smartspaces Limited Civil Site Engineer interview:
  • Project Management
Interview preparation tips for other job seekers - Technical and professional communication is must
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Just construction activities
Round 3 - HR 

(1 Question)

  • Q1. Just Salary negotiations
Round 4 - Behavioral 

(1 Question)

  • Q1. Position and Salary Finalisation

Interview Preparation Tips

Topics to prepare for Ashar group Site Engineer interview:
  • Construction Activity
  • finishing
  • Billing
  • Site Supervision
Interview preparation tips for other job seekers - Just be confident and prompt

I applied via Newspaper Ad and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Aptitude Test 

Question related to civil site work

Round 3 - One-on-one 

(2 Questions)

  • Q1. Work and topic related questions
  • Q2. What is minimum cememt at M20?
  • Ans. 

    The minimum cement content for M20 grade concrete is 320 kg/m3.

    • M20 grade concrete has a compressive strength of 20 MPa.

    • The minimum cement content is determined based on the water-cement ratio and the maximum size of aggregates.

    • The minimum cement content for M20 grade concrete is 320 kg/m3.

    • The cement content can be increased based on the specific requirements of the project.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Arvind Smartspaces Limited Site Engineer interview:
  • Quantity and bill
Interview preparation tips for other job seekers - Good company, management is good. Come with basic education study.

Interview Questionnaire 

1 Question

  • Q1. Ask about the BBC length of steel,past experience, Future planning & work ethics of civil engineering, drawing in civil engineering,work profile for your job,basic civil engineering.

I applied via Naukri.com and was interviewed in Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Questions from my core subjects were asked and related to the site works.It was not much hard interview apart from that "salary kitna loge" was the main topic in the interview.

M2k Group Interview FAQs

How many rounds are there in M2k Group Site Engineer interview?
M2k Group interview process usually has 1 rounds. The most common rounds in the M2k Group interview process are Technical.
What are the top questions asked in M2k Group Site Engineer interview?

Some of the top questions asked at the M2k Group Site Engineer interview -

  1. How much shuttering are provide in 200 m3 concre...read more
  2. How much shuttering provide in200 m3 concr...read more
  3. What type of drawing are you referring to? 4 t...read more

Tell us how to improve this page.

M2k Group Site Engineer Interview Process

based on 1 interview

Interview experience

2
  
Poor
View more
Assistant Manager
11 salaries
unlock blur

₹4.5 L/yr - ₹8.4 L/yr

Deputy Manager
10 salaries
unlock blur

₹6.8 L/yr - ₹12 L/yr

Store Incharge
7 salaries
unlock blur

₹3.6 L/yr - ₹6.4 L/yr

Accountant
5 salaries
unlock blur

₹3 L/yr - ₹4.3 L/yr

Assistant
4 salaries
unlock blur

₹2.5 L/yr - ₹3 L/yr

Explore more salaries
Compare M2k Group with

DLF

4.0
Compare

Prestige Group

4.3
Compare

Godrej Properties

3.7
Compare

Sobha

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview