Filter interviews by
I applied via Naukri.com and was interviewed before Mar 2022. There were 3 interview rounds.
Specialist materials used in PEB structures include steel, aluminum, and composite materials.
PEB structures are pre-engineered buildings that are made of various materials.
Steel is the most commonly used material in PEB structures due to its strength and durability.
Aluminum is also used in PEB structures due to its lightweight and corrosion resistance.
Composite materials, such as fiberglass and carbon fiber, are used i...
Grouting materials are used to fill gaps or voids in structures to improve their strength and stability.
Grouting materials can be cement-based, epoxy-based, or polymer-based.
Cement-based grouts are commonly used for construction and repair of buildings, bridges, and dams.
Epoxy-based grouts are used for high-strength applications such as anchoring bolts and reinforcing steel.
Polymer-based grouts are used for sealing and...
Materials testing in structures involves physical testing to determine their strength and durability.
Materials are tested to ensure they can withstand the expected loads and stresses placed on them in a structure.
Common tests include tensile, compression, and bending tests.
Other tests may include impact resistance, fatigue testing, and hardness testing.
Testing may be done on small samples or on full-scale structures.
Re...
Checking sheet quality involves ensuring that the sheet meets the required standards and specifications.
Inspecting the sheet for defects such as scratches, dents, and discoloration
Measuring the thickness and dimensions of the sheet
Testing the sheet for strength and durability
Verifying that the sheet meets the required standards and specifications
Rejecting sheets that do not meet the required quality standards
PEB structures use a variety of materials including steel, concrete, and wood.
Primary material used is steel due to its strength and durability
Concrete is used for foundations and flooring
Wood is used for interior finishes and roofing
Other materials like aluminum, fiberglass, and PVC are also used for specific purposes
A wire harness is a collection of wires, cables, and connectors that transmit electrical signals and power between different components in a system.
Wire harnesses provide a neat and organized way to route and protect wires in a system.
They ensure proper connectivity and prevent wire damage or short circuits.
Wire harnesses simplify troubleshooting and maintenance by allowing easy identification and replacement of faulty...
Sputtering is a process used in manufacturing to deposit thin films of material onto a surface.
Sputtering is a physical vapor deposition technique.
It involves bombarding a target material with high-energy ions or atoms.
This bombardment dislodges atoms from the target material, which then deposit onto a substrate.
Sputtering is commonly used in the production of semiconductor devices, solar cells, and thin film coatings.
...
I applied via Approached by Company and was interviewed before Feb 2021. There were 3 interview rounds.
Project management is the process of planning, organizing, and controlling resources to achieve specific goals within a defined timeline.
It involves identifying project goals and objectives
Developing a project plan and timeline
Assigning tasks and responsibilities to team members
Monitoring progress and making adjustments as needed
Ensuring that the project is completed on time and within budget
Examples include constructi...
I applied via Campus Placement and was interviewed before Nov 2022. There were 5 interview rounds.
General Aptitude based on 1. logical and reasoning
2 English Grammar
3. Mathematical
4. Physics
Group discussion was about social media, HR team observed the people who are more involved and active through out the GD
I applied via Apna Jobs and was interviewed in Mar 2022. There were 3 interview rounds.
I will immediately investigate the cause of the NG lot and work with the team to find a solution to make it usable.
Investigate the cause of the NG lot
Work with the team to find a solution
Prioritize urgent use of the lot
Ensure quality control measures are in place
Communicate with stakeholders about the situation
posted on 11 Apr 2022
based on 1 interview
Interview experience
Sales Executive
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
14
salaries
| ₹0 L/yr - ₹0 L/yr |
AC Technician
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Branch Head
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Voltas
Blue Star
Godrej Industries Group
Whirlpool