i
LANXESS India Private Limited
Filter interviews by
Clear (1)
I can adopt to Singapore culture by learning about their customs, traditions, and values.
I will make an effort to learn about the local customs and traditions
I will respect their values and beliefs
I will try to learn the local language to communicate better
I will be open-minded and willing to try new things
I will make an effort to build relationships with locals
I will be aware of cultural differences and adjust my beha
I am interested in this company because of its reputation for delivering high-quality projects and its commitment to innovation.
The company has a strong track record of successful project delivery
The company values innovation and encourages employees to think creatively
The company has a positive reputation in the industry and among its clients
The company offers opportunities for professional growth and development
In 5 years, I see myself as a senior project engineer leading a team of professionals to deliver successful projects.
Leading a team of professionals
Delivering successful projects
Continuing to learn and grow in my role
Contributing to the company's growth and success
Building strong relationships with clients and stakeholders
I can manage people by setting clear expectations, providing support and feedback, and fostering a positive work environment.
Establish clear goals and expectations
Provide regular feedback and support
Encourage open communication and collaboration
Recognize and reward good performance
Address conflicts and issues promptly and fairly
Top trending discussions
Business Case Study of aligning Supply Chain
I applied via LinkedIn and was interviewed in Jan 2024. There was 1 interview round.
posted on 10 Jun 2022
I applied via Approached by Company and was interviewed in Sep 2021. There were 3 interview rounds.
The number of points that need inspection varies depending on the specific context and requirements.
The number of points needing inspection can be determined by the scope of the analysis or evaluation.
Factors such as the size of the dataset, complexity of the data, and specific objectives of the analysis can influence the number of points to inspect.
For example, in a quality control process, a certain percentage of pro...
Yes, Total Maintenance Loss (TML) is important for maintenance as it helps in identifying critical equipment and prioritizing maintenance activities.
TML is a key performance indicator used to measure the overall maintenance effectiveness of a system or equipment.
It helps in identifying equipment that is causing the most downtime or losses in production.
By analyzing TML, maintenance teams can prioritize their efforts on...
I applied via Campus Placement and was interviewed in Apr 2023. There were 2 interview rounds.
The diameter of a distillation column is designed based on factors such as feed flow rate, composition, pressure, and efficiency.
Calculate the required vapor and liquid flow rates based on the feed composition and desired separation efficiency.
Consider the pressure drop along the column and the desired residence time for the vapor and liquid phases.
Use design equations and correlations to determine the optimal diameter...
Number of trays and reflux ratio can be calculated using various methods such as McCabe-Thiele method or Fenske equation.
Use McCabe-Thiele method for distillation columns to determine number of trays required.
Calculate reflux ratio by dividing the liquid returning to the column by the liquid leaving the top tray.
Consider factors such as desired separation efficiency and operating conditions when determining number of t
Tray is used for organizing items while packing is the process of placing items in a container for transportation or storage.
Tray is typically used for organizing small items or serving food, while packing involves placing items in a container for transportation or storage.
Trays can come in various sizes and materials, such as plastic, metal, or wood, while packing materials can include boxes, bags, or containers.
Examp...
To calculate pressure drop in a pipe, use the Darcy-Weisbach equation or the Hazen-Williams equation.
Use the Darcy-Weisbach equation: ΔP = f * (L/D) * (ρ * V^2) / 2
Use the Hazen-Williams equation: ΔP = 10.67 * Q^1.85 / (C^1.85 * D^4.87)
Where ΔP is the pressure drop, f is the Darcy friction factor, L is the pipe length, D is the pipe diameter, ρ is the fluid density, V is the fluid velocity, Q is the flow rate, and C is...
Le Chatelier's principle states that a system at equilibrium will respond to a stress by shifting to counteract the stress and restore equilibrium.
If a stress is applied to a system at equilibrium, the system will adjust to minimize the effect of the stress.
Changes in concentration, pressure, or temperature can cause a shift in equilibrium.
For example, if more reactants are added to a system at equilibrium, the system ...
I applied via Approached by Company and was interviewed in Mar 2022. There were 4 interview rounds.
Market experience & implementation
Establishing products brands to increase all products sale to each individuals end-users customers in every market, recommended crops & all seasons
Increase Sales with minimum DSO
Assistant Manager
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Process Technician
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
15
salaries
| ₹0 L/yr - ₹0 L/yr |
BASF
Clariant Chemicals
Solvay Specialities
AkzoNobel