Points to consider while preparing site safety plan
Identify potential hazards and risks
Determine safety measures and protocols
Provide safety training to workers
Ensure proper safety equipment and gear
Establish emergency response procedures
Regular safety inspections and audits
Compliance with local and national safety regulations
Various documents are required on construction sites to ensure safety, compliance, and quality control.
Building permits and approvals
Construction drawings and specifications
Safety plans and hazard assessments
Inspection reports and quality control records
Material certifications and test reports
Change orders and project schedules
Daily logs and progress reports
Implemented a real-time monitoring system to track project progress and identify potential delays.
Developed a custom software to track project milestones and deadlines
Integrated the software with project management tools like Gantt charts and critical path analysis
Set up automated alerts for potential delays and risks
Regularly reviewed and analyzed the data to identify areas for improvement
Implemented corrective action...
Top trending discussions
I applied via Walk-in and was interviewed in Mar 2020. There was 1 interview round.
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
General knowledge skills
Worked as a Project Engineer at a construction company for 5 years.
Managed multiple civil engineering projects simultaneously
Coordinated with architects, contractors, and clients to ensure project success
Performed site inspections and quality control checks
Prepared project schedules and budgets
Resolved any issues or conflicts that arose during construction
posted on 4 Jan 2025
I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
Project management process involves initiating, planning, executing, monitoring, and closing a project.
Initiating: Define project scope, objectives, and stakeholders.
Planning: Create a detailed project plan, including timelines, resources, and budget.
Executing: Implement the project plan and manage resources effectively.
Monitoring: Track project progress, identify risks, and make necessary adjustments.
Closing: Finalize...
Risk management involves identifying, assessing, and prioritizing risks, as well as developing mitigation plans to minimize their impact.
Identify potential risks by conducting a thorough risk assessment
Assess the likelihood and impact of each risk on the project
Prioritize risks based on their severity and potential impact
Develop a mitigation plan for each identified risk, including strategies to minimize or eliminate t...
Long lead items can be tracked by creating a detailed schedule, monitoring progress regularly, and communicating with suppliers.
Create a detailed schedule outlining the delivery dates of long lead items
Regularly monitor the progress of long lead items to ensure they are on track
Communicate effectively with suppliers to address any delays or issues
Utilize project management software to track and manage long lead items
Pressure in fire hydrant pipe is determined by factors like water flow rate, pipe diameter, and elevation difference.
Pressure in fire hydrant pipe is directly related to the flow rate of water through the pipe.
The diameter of the pipe also affects the pressure, with larger diameter pipes resulting in lower pressure loss.
Elevation difference between the hydrant and the point of discharge can impact the pressure in the p...
NRC stands for National Register of Citizens.
NRC is a register containing names of all genuine Indian citizens in the state of Assam, India.
It was first prepared in 1951 and is now being updated to identify illegal immigrants.
The NRC process involves verifying the citizenship status of individuals based on documents like birth certificates, land records, etc.
posted on 25 Mar 2023
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
The area of projects and types of projects I have worked on vary greatly.
I have worked on projects in various industries including construction, healthcare, and technology.
Types of projects I have worked on include software development, building construction, and medical equipment installation.
I am adaptable and able to quickly learn about new industries and project types.
I have experience working on both small and lar
posted on 2 Feb 2022
I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
General knowledge question
posted on 9 Aug 2023
I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.
Some of the top questions asked at the JLL Project Executive Engineer interview -
based on 3 reviews
Rating in categories
Facility Executive
1k
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Assistant Manager
949
salaries
| ₹3.5 L/yr - ₹14 L/yr |
Assistant Project Leader
540
salaries
| ₹3.8 L/yr - ₹11.3 L/yr |
Assistant Facility Manager
516
salaries
| ₹3 L/yr - ₹10.3 L/yr |
Senior Analyst
506
salaries
| ₹3 L/yr - ₹9.8 L/yr |
CBRE
Colliers India
Cushman & Wakefield
Knight Frank