Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by JLL Team. If you also belong to the team, you can get access from here

JLL Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

JLL Project Executive Engineer Interview Questions and Answers

Updated 11 Oct 2020

JLL Project Executive Engineer Interview Experiences

1 interview found

Interview Questionnaire 

4 Questions

  • Q1. 1. What is the selection criteria you will follow while selecting contractors for your new project?
  • Q2. 2. What all are the points need to consider while preparing the site safety plan?
  • Ans. 

    Points to consider while preparing site safety plan

    • Identify potential hazards and risks

    • Determine safety measures and protocols

    • Provide safety training to workers

    • Ensure proper safety equipment and gear

    • Establish emergency response procedures

    • Regular safety inspections and audits

    • Compliance with local and national safety regulations

  • Answered by AI
  • Q3. What all are the documents need to follow on construction site ?
  • Ans. 

    Various documents are required on construction sites to ensure safety, compliance, and quality control.

    • Building permits and approvals

    • Construction drawings and specifications

    • Safety plans and hazard assessments

    • Inspection reports and quality control records

    • Material certifications and test reports

    • Change orders and project schedules

    • Daily logs and progress reports

  • Answered by AI
  • Q4. What is the latest engineering control you implemented in your previous projects?
  • Ans. 

    Implemented a real-time monitoring system to track project progress and identify potential delays.

    • Developed a custom software to track project milestones and deadlines

    • Integrated the software with project management tools like Gantt charts and critical path analysis

    • Set up automated alerts for potential delays and risks

    • Regularly reviewed and analyzed the data to identify areas for improvement

    • Implemented corrective action...

  • Answered by AI

Interview questions from similar companies

I applied via Walk-in and was interviewed in Mar 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. 1. What have you done in your last company ? 2. What can you do for us? 3. Do you know Fire fighting works ? 4. What IS code we are using for electrical works ? 5. Do you know false ceiling works ? 6. Wha...

Interview Preparation Tips

Interview preparation tips for other job seekers - I had given three rounds of technical and one HR round and got cleared the interview and submitted all the documents along with employee onboard form, but unfortunately due to this pandemic I lost the opportunity as the same day lock down-1 starts and after that they haven't offered me that job.

But, I have no complaint with the company, my experience was very good. I recommend the project people should try to join this firm as they are very professional.

I was called for Project engineer job profile, but they asked me the questions beyond that field, which also includes facility management and MEP works, so be prepared with all dimensions as they require a person who can do site work as well along with allied office works.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

General knowledge skills

Round 2 - Technical 

(5 Questions)

  • Q1. Your previous company experience
  • Ans. 

    Worked as a Project Engineer at a construction company for 5 years.

    • Managed multiple civil engineering projects simultaneously

    • Coordinated with architects, contractors, and clients to ensure project success

    • Performed site inspections and quality control checks

    • Prepared project schedules and budgets

    • Resolved any issues or conflicts that arose during construction

  • Answered by AI
  • Q2. Asking your previous work experience
  • Q3. Structure related questions
  • Q4. Finishing related question
  • Q5. Water proofing related question and Bbs

Interview Preparation Tips

Interview preparation tips for other job seekers - Development your technical knowledge
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Project management process
  • Ans. 

    Project management process involves initiating, planning, executing, monitoring, and closing a project.

    • Initiating: Define project scope, objectives, and stakeholders.

    • Planning: Create a detailed project plan, including timelines, resources, and budget.

    • Executing: Implement the project plan and manage resources effectively.

    • Monitoring: Track project progress, identify risks, and make necessary adjustments.

    • Closing: Finalize...

  • Answered by AI
  • Q2. How to manage risk and mitigation plan
  • Ans. 

    Risk management involves identifying, assessing, and prioritizing risks, as well as developing mitigation plans to minimize their impact.

    • Identify potential risks by conducting a thorough risk assessment

    • Assess the likelihood and impact of each risk on the project

    • Prioritize risks based on their severity and potential impact

    • Develop a mitigation plan for each identified risk, including strategies to minimize or eliminate t...

  • Answered by AI
  • Q3. How will you track Long lead item
  • Ans. 

    Long lead items can be tracked by creating a detailed schedule, monitoring progress regularly, and communicating with suppliers.

    • Create a detailed schedule outlining the delivery dates of long lead items

    • Regularly monitor the progress of long lead items to ensure they are on track

    • Communicate effectively with suppliers to address any delays or issues

    • Utilize project management software to track and manage long lead items

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Salary expectation
  • Q2. Notice period
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Pressure in fire hydrant pipe
  • Ans. 

    Pressure in fire hydrant pipe is determined by factors like water flow rate, pipe diameter, and elevation difference.

    • Pressure in fire hydrant pipe is directly related to the flow rate of water through the pipe.

    • The diameter of the pipe also affects the pressure, with larger diameter pipes resulting in lower pressure loss.

    • Elevation difference between the hydrant and the point of discharge can impact the pressure in the p...

  • Answered by AI
  • Q2. What is NRC full form
  • Ans. 

    NRC stands for National Register of Citizens.

    • NRC is a register containing names of all genuine Indian citizens in the state of Assam, India.

    • It was first prepared in 1951 and is now being updated to identify illegal immigrants.

    • The NRC process involves verifying the citizenship status of individuals based on documents like birth certificates, land records, etc.

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Personal Interview Current CTC Current location Expected CTC
Round 2 - One-on-one 

(1 Question)

  • Q1. Projects Details Area of projects Types of projects
  • Ans. 

    The area of projects and types of projects I have worked on vary greatly.

    • I have worked on projects in various industries including construction, healthcare, and technology.

    • Types of projects I have worked on include software development, building construction, and medical equipment installation.

    • I am adaptable and able to quickly learn about new industries and project types.

    • I have experience working on both small and lar

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please don't join on third party payroll, join only on company payroll.

I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. About past experience
  • Q2. About technical knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Good experience for minimum experience candidates
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Casting related
Round 2 - Technical 

(2 Questions)

  • Q1. Soil Test related
  • Q2. Shear force Bending moment
Round 3 - HR 

(2 Questions)

  • Q1. Statutory documentary
  • Q2. Previous experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

General knowledge question

Round 2 - Technical 

(5 Questions)

  • Q1. Previous company experience related questions
  • Q2. Technical questions
  • Q3. Structure related questions
  • Q4. Water proofing related question
  • Q5. Finishing related question

Interview Preparation Tips

Interview preparation tips for other job seekers - Development your technical knowledge
Interview experience
4
Good
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. About salary and company
  • Q2. Date of joining in our company
Round 3 - Technical 

(3 Questions)

  • Q1. Transformer related questions
  • Q2. Lighting, earthing, cable laying, quality, billing
  • Q3. Execution, safety, instrumentation

JLL Interview FAQs

What are the top questions asked in JLL Project Executive Engineer interview?

Some of the top questions asked at the JLL Project Executive Engineer interview -

  1. 2. What all are the points need to consider while preparing the site safety pla...read more
  2. What is the latest engineering control you implemented in your previous project...read more
  3. What all are the documents need to follow on construction sit...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

CBRE Interview Questions
4.2
 • 257 Interviews
NoBroker Interview Questions
3.2
 • 226 Interviews
Colliers India Interview Questions
4.0
 • 61 Interviews
Knight Frank Interview Questions
4.1
 • 44 Interviews
K Raheja Corp Interview Questions
4.3
 • 44 Interviews
SMEC Interview Questions
3.8
 • 26 Interviews
View all
JLL Project Executive Engineer Salary
based on 5 salaries
₹3.6 L/yr - ₹5.8 L/yr
8% less than the average Project Executive Engineer Salary in India
View more details

JLL Project Executive Engineer Reviews and Ratings

based on 3 reviews

4.7/5

Rating in categories

4.7

Skill development

3.9

Work-life balance

4.4

Salary

4.8

Job security

4.7

Company culture

4.7

Promotions

4.7

Work satisfaction

Explore 3 Reviews and Ratings
Facility Executive
1k salaries
unlock blur

₹2.4 L/yr - ₹6 L/yr

Assistant Manager
949 salaries
unlock blur

₹3.5 L/yr - ₹14 L/yr

Assistant Project Leader
540 salaries
unlock blur

₹3.8 L/yr - ₹11.3 L/yr

Assistant Facility Manager
516 salaries
unlock blur

₹3 L/yr - ₹10.3 L/yr

Senior Analyst
506 salaries
unlock blur

₹3 L/yr - ₹9.8 L/yr

Explore more salaries
Compare JLL with

CBRE

4.2
Compare

Colliers India

4.0
Compare

Cushman & Wakefield

4.2
Compare

Knight Frank

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview