Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by L&T Heavy Engineering Team. If you also belong to the team, you can get access from here

L&T Heavy Engineering Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

L&T Heavy Engineering Supervisor Interview Questions and Answers

Updated 12 Dec 2024

L&T Heavy Engineering Supervisor Interview Experiences

1 interview found

Supervisor Interview Questions & Answers

user image Anonymous

posted on 12 Dec 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Math, Reasoning, English, & Technical related questions

Round 2 - HR 

(2 Questions)

  • Q1. Introduction, Subject related question
  • Q2. Introduction, & subject related question

Interview questions from similar companies

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

I was interviewed before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1.  l&t company establishment date
  • Q2. You have a experience in construction line.
  • Q3. What working to be site
  • Ans. Box culvert, returning wall, desk slab, cross bariyar, tow wall etc.
  • Answered by Suman maity

Interview Preparation Tips

Interview preparation tips for other job seekers - I am try to be small time to complete the work. My site is properly safety with 0 accident. It's projected is my responsibility.
I work to rail project, road project, hospital and metro project working in site.

Interview Questionnaire 

5 Questions

  • Q1. Pertaining to the mentioned roles and responsibilities in your resume
  • Q2. Planning and work order creation
  • Q3. Piling activities
  • Q4. Introduction
  • Q5. Cross checking of documents

Interview Preparation Tips

Round: Resume Shortlist
Experience: On the criteria that I scored atleast 60% overall and had no gap between job/s.

I applied via Naukri.com and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About circuit breaker, transformer.
  • Q2. Single line diagrams, layout, substation calculation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please go through substation calculation and equipment.

I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Maintenance phylosophy
  • Ans. Depends on equipment running hour, criticality, availability and standby.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Engineer interview:
  • Boe
  • Energy manager
Interview preparation tips for other job seekers - Be confidential and technically strong.

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

Interview Questionnaire 

3 Questions

  • Q1. PSC girder
  • Q2. Minor bridge
  • Q3. Related

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Interview Questionnaire 

1 Question

  • Q1. What is your role in previous company

L&T Heavy Engineering Interview FAQs

How many rounds are there in L&T Heavy Engineering Supervisor interview?
L&T Heavy Engineering interview process usually has 2 rounds. The most common rounds in the L&T Heavy Engineering interview process are Aptitude Test and HR.
What are the top questions asked in L&T Heavy Engineering Supervisor interview?

Some of the top questions asked at the L&T Heavy Engineering Supervisor interview -

  1. Introduction, Subject related quest...read more
  2. Introduction, & subject related quest...read more

Tell us how to improve this page.

L&T Heavy Engineering Supervisor Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Fast track your campus placements

View all
L&T Heavy Engineering Supervisor Salary
based on 7 salaries
₹2 L/yr - ₹3.8 L/yr
27% less than the average Supervisor Salary in India
View more details

L&T Heavy Engineering Supervisor Reviews and Ratings

based on 3 reviews

2.7/5

Rating in categories

3.7

Skill development

3.3

Work-life balance

2.3

Salary

4.3

Job security

3.0

Company culture

2.3

Promotions

3.7

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
39 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
35 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Design Engineer
20 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Production Engineer
18 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Graduate Engineer Trainee (Get)
16 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Heavy Engineering with

BHEL

4.1
Compare

Tata Projects

4.2
Compare

Larsen & Toubro Limited

4.0
Compare

Thermax Limited

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview