I applied via Walk-in and was interviewed in Nov 2021. There was 1 interview round.
ITP stands for Inspection and Test Plan. Sensitization is a process where stainless steel loses its corrosion resistance due to high temperature exposure.
ITP is a document that outlines the inspection and testing requirements for a project.
It includes details on the materials, equipment, and procedures to be used.
Sensitization occurs when chromium carbides form in the grain boundaries of stainless steel, reducing its c...
WPS stands for Welding Procedure Specification and PQR stands for Procedure Qualification Record.
WPS is a document that provides detailed instructions on how to perform a specific welding procedure.
It includes information on welding parameters, materials, joint design, and pre- and post-welding treatments.
PQR is a record that documents the results of a procedure qualification test.
It verifies that a specific welding pr...
Top trending discussions
Assistant Manager
846
salaries
| ₹4.9 L/yr - ₹19 L/yr |
Manager
321
salaries
| ₹10.2 L/yr - ₹30 L/yr |
Senior Engineer
231
salaries
| ₹4.3 L/yr - ₹11 L/yr |
Piping Engineer
136
salaries
| ₹2.5 L/yr - ₹11 L/yr |
Assistant General Manager
129
salaries
| ₹13.4 L/yr - ₹35 L/yr |
TechnipFMC
McDermott International
Saipem
Punj Lloyd