Filter interviews by
I applied via Walk-in and was interviewed in Nov 2021. There was 1 interview round.
ITP stands for Inspection and Test Plan. Sensitization is a process where stainless steel loses its corrosion resistance due to high temperature exposure.
ITP is a document that outlines the inspection and testing requirements for a project.
It includes details on the materials, equipment, and procedures to be used.
Sensitization occurs when chromium carbides form in the grain boundaries of stainless steel, reducing its c...
WPS stands for Welding Procedure Specification and PQR stands for Procedure Qualification Record.
WPS is a document that provides detailed instructions on how to perform a specific welding procedure.
It includes information on welding parameters, materials, joint design, and pre- and post-welding treatments.
PQR is a record that documents the results of a procedure qualification test.
It verifies that a specific welding pr...
Assistant Manager
835
salaries
| ₹4.9 L/yr - ₹19 L/yr |
Manager
337
salaries
| ₹10.5 L/yr - ₹32 L/yr |
Senior Engineer
236
salaries
| ₹4.1 L/yr - ₹12 L/yr |
Piping Engineer
136
salaries
| ₹2.5 L/yr - ₹11.4 L/yr |
Assistant General Manager
127
salaries
| ₹13.4 L/yr - ₹35 L/yr |
TechnipFMC
McDermott International
Saipem
Punj Lloyd