Upload Button Icon Add office photos

L&T Energy Hydrocarbon

Compare button icon Compare button icon Compare

Filter interviews by

L&T Energy Hydrocarbon Power Plant Engineer Interview Questions and Answers

Updated 18 Nov 2024

L&T Energy Hydrocarbon Power Plant Engineer Interview Experiences

1 interview found

Power Plant Engineer Interview Questions & Answers

user image THAKOR KISHANJI VIJAYJI

posted on 18 Nov 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Diploma electrical engineer
  • Q2. 1 year Torrent Power experience
  • Ans. 

    I do not have 1 year experience at Torrent Power.

    • I do not have any experience working at Torrent Power.

    • I have experience in a similar role at a different company.

    • I am eager to learn and adapt to new environments.

    • I am confident in my abilities to excel in this position.

  • Answered by AI
  • Q3. Transformer in total detail
  • Ans. 

    A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Transformers consist of two coils of wire, known as the primary and secondary windings.

    • The primary winding is connected to the source of electrical power, while the secondary winding is connected to the load.

    • Transformers can step up or step down voltage levels depending on the number of ...

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Diploma electrical engineer CGPA 8.6
  • Q2. Torrent power 1 years experience
  • Ans. 

    Torrent Power is a power generation company in India with 1 year of experience in the industry.

    • Torrent Power is a leading power generation company in India.

    • Having 1 year of experience in the industry shows familiarity with power plant operations.

    • Experience at Torrent Power may include working on maintenance, troubleshooting, and optimization of power plant equipment.

    • Knowledge of safety protocols and regulations in the ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Torrent power 1 year experience

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Control valves on-off valves
Round 3 - Technical 

(1 Question)

  • Q1. PSV pressure regulators

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical study is important . Basics to be perfect
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Ammonia process
Round 3 - HR 

(2 Questions)

  • Q1. How much salary expectations?
  • Q2. Salary Negotiable

Interview Preparation Tips

Interview preparation tips for other job seekers - All the best
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Civil engineering related Questions
Round 2 - HR 

(1 Question)

  • Q1. Salary related discussion
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basics of what ur past experience
  • Q2. Basic of shuttering and concreting
Round 3 - Technical 

(1 Question)

  • Q1. What u r past experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Cheapest HRs team in entire Ahemdabad have worked with no. Of company but this company HRs is the worst of them all..
No fixed timing of work. Only top management is supportive down the line everyone is of cheap mentality. Not recommend to join the company as u will regret later. Not even cable to achieve 1 star
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Field related building materials
  • Q2. Building materials

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join in this company,
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024, where I was asked the following questions.

  • Q1. What a IS Code of Design Mix ?
  • Ans. 

    IS Code of Design Mix refers to Indian Standards for concrete mix design, ensuring quality and performance in construction.

    • IS 456:2000 provides guidelines for plain and reinforced concrete design.

    • IS 10262:2019 outlines the procedure for concrete mix design.

    • Mix design considers factors like workability, strength, and durability.

    • Example: A mix design for M25 concrete specifies a ratio of 1:1:2 (Cement:Sand:Aggregate).

    • The...

  • Answered by AI
  • Q2. What are the Welding method of steel?
  • Ans. 

    Welding methods for steel include various techniques like MIG, TIG, and Stick welding, each suited for different applications.

    • MIG Welding (Gas Metal Arc Welding) - Uses a continuous wire feed and is ideal for thin to medium thickness steel.

    • TIG Welding (Gas Tungsten Arc Welding) - Provides high precision and is suitable for thin materials and stainless steel.

    • Stick Welding (Shielded Metal Arc Welding) - Versatile and com...

  • Answered by AI
  • Q3. What are the advantage of steel shuttering?
  • Ans. 

    Steel shuttering offers durability, reusability, and precision in construction, enhancing project efficiency and quality.

    • Durability: Steel shuttering can withstand harsh weather conditions and heavy loads, making it suitable for large-scale projects.

    • Reusability: Unlike timber, steel can be reused multiple times, reducing material costs over time.

    • Precision: Steel shuttering provides a high level of accuracy in dimension...

  • Answered by AI
  • Q4. What are the benefits of using Composite Plate?
  • Ans. 

    Composite plates offer enhanced strength, lightweight properties, and design flexibility for various applications.

    • High strength-to-weight ratio: Composite plates are significantly lighter than metals, making them ideal for aerospace applications.

    • Corrosion resistance: They resist environmental degradation, suitable for marine and chemical industries.

    • Design flexibility: Can be molded into complex shapes, allowing for inn...

  • Answered by AI
  • Q5. How do you lay blocks in block work
  • Ans. 

    Laying blocks involves precise techniques for alignment, mortar application, and ensuring structural integrity.

    • Prepare the foundation: Ensure the base is level and clean before starting.

    • Mix mortar: Use the right ratio of cement, sand, and water for optimal adhesion.

    • Lay the first block: Start at a corner, applying mortar to the bottom and sides.

    • Check alignment: Use a level to ensure blocks are straight and even.

    • Stagger ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - As a job seeker, it's essential to be proactive and persistent in your job search. Don't quit for opportunities to come to you. Create your own. 1- Network and make Connection. 2- Tailor your application materials. 3- Follow up 4- Continuous improve. 5- Stay positive and motivate.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

About site experience

Round 2 - Technical 

(1 Question)

  • Q1. Site execution technical

L&T Energy Hydrocarbon Interview FAQs

How many rounds are there in L&T Energy Hydrocarbon Power Plant Engineer interview?
L&T Energy Hydrocarbon interview process usually has 2 rounds. The most common rounds in the L&T Energy Hydrocarbon interview process are One-on-one Round.
What are the top questions asked in L&T Energy Hydrocarbon Power Plant Engineer interview?

Some of the top questions asked at the L&T Energy Hydrocarbon Power Plant Engineer interview -

  1. 1 year Torrent Power experie...read more
  2. Torrent power 1 years experie...read more
  3. Transformer in total det...read more

Tell us how to improve this page.

L&T Energy Hydrocarbon Power Plant Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all

L&T Energy Hydrocarbon Power Plant Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
827 salaries
unlock blur

₹4.9 L/yr - ₹19 L/yr

Manager
328 salaries
unlock blur

₹10.2 L/yr - ₹30 L/yr

Senior Engineer
276 salaries
unlock blur

₹4.3 L/yr - ₹12 L/yr

Piping Engineer
138 salaries
unlock blur

₹2.5 L/yr - ₹11 L/yr

Assistant General Manager
129 salaries
unlock blur

₹17 L/yr - ₹36 L/yr

Explore more salaries
Compare L&T Energy Hydrocarbon with

AECOM

4.2
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare

Aarvee Associates

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview