I applied via Walk-in and was interviewed in May 2022. There were 3 interview rounds.
I am currently working as a Project Manager at XYZ company.
Leading a team of 10 members to ensure successful completion of projects within budget and timeline
Developing project plans, schedules, and budgets
Identifying and mitigating project risks
Communicating with stakeholders to ensure project alignment with business goals
Tracking project progress and reporting to senior management
I have handled various systems including project management software like Asana and Trello.
I have experience with Asana and Trello for project management
I have also worked with JIRA for issue tracking
I am familiar with Microsoft Project for scheduling and resource management
posted on 21 Aug 2024
Steel margin refers to the difference between the cost of producing steel and the selling price.
Steel margin is calculated by subtracting the cost of production (including raw materials, labor, and overhead) from the selling price of steel products.
It is important for companies to maintain a healthy steel margin to ensure profitability and sustainability.
Factors that can impact the steel margin include fluctuations in ...
The percentage of aggregate in gradation test varies depending on the specific requirements of the project.
The percentage of aggregate in gradation test is typically determined by the specifications provided for the project
It can range from 0% to 100% depending on the type of aggregate being used and the desired characteristics of the final mix
For example, in a concrete mix design, the percentage of coarse aggregate ma...
The project manager plays a crucial role in overseeing and coordinating all aspects of a project at the site.
Responsible for planning, organizing, and directing project activities
Ensuring project goals are met within budget and timeline
Managing resources and stakeholders effectively
Problem-solving and decision-making skills are essential
Strong communication and leadership skills are necessary
The overall cost in a project in the role of RCC refers to the total expenses incurred for the Reinforced Cement Concrete work.
Calculate the cost of materials such as cement, aggregates, and reinforcement bars.
Consider the cost of labor for construction and installation of RCC components.
Include any additional costs such as equipment rental, transportation, and overhead expenses.
Factor in the cost of quality control me...
posted on 4 May 2024
I applied via Approached by Company and was interviewed before May 2023. There were 2 interview rounds.
General aptitude of IQ
Concrete compressive strength acceptance criteria is based on specified strength, testing frequency, and acceptance criteria.
Specified strength should be determined by the project requirements or standards.
Testing frequency should be established to ensure consistent quality control.
Acceptance criteria may include minimum strength requirements and statistical analysis.
Example: Specified strength of 28 MPa, testing every...
Project management is the practice of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria.
Involves initiating, planning, executing, controlling, and closing a project
Focuses on achieving specific goals and meeting success criteria
Requires effective communication, coordination, and resource management
Utilizes tools and techniques such ...
Address the issue directly with the contractor and set clear expectations for improvement.
Schedule a meeting with the contractor to discuss performance concerns
Clearly communicate the areas where the contractor is not meeting expectations
Set specific goals and deadlines for improvement
Offer support or resources to help the contractor improve
Consider consequences if performance does not improve, such as termination of c
EPC stands for Engineering, Procurement, and Construction. An EPC contractor is a company that provides all services required for a project from design to completion.
EPC stands for Engineering, Procurement, and Construction
EPC contractors are responsible for designing, procuring materials, and constructing projects
They are often hired for large-scale projects such as power plants, refineries, and infrastructure project
posted on 29 Nov 2023
I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.
The number of bricks required per cubic meter varies depending on the size and type of brick used.
The number of bricks required per cubic meter can range from 400 to 700 depending on the size and type of brick.
For example, standard size bricks (190mm x 90mm x 90mm) typically require around 500 bricks per cubic meter.
Larger or smaller bricks will require more or fewer bricks per cubic meter respectively.
I applied via Naukri.com and was interviewed in Dec 2021. There were 2 interview rounds.
I applied via LinkedIn and was interviewed in Jan 2022. There were 3 interview rounds.
posted on 16 Apr 2022
My further most career goal is to become a director of project management.
To gain experience in managing large-scale projects
To develop leadership and communication skills
To build a strong network of industry professionals
To continuously learn and stay updated with industry trends
To achieve PMP certification
To work towards becoming a subject matter expert in project management
To mentor and train junior project managers
...
I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before May 2021. There was 1 interview round.
posted on 15 Jan 2021
I applied via Naukri.com and was interviewed before Jan 2020. There were 5 interview rounds.
The load taken by adjustable props for shuttering works depends on various factors.
The load capacity of adjustable props depends on their size and material.
The type of shuttering work being done also affects the load taken by adjustable props.
The load can vary from a few hundred kilograms to several tons.
Adjustable props are commonly used in construction to support formwork during concrete pouring.
The load taken by adj...
There are various types of shuttering methods used in construction, each with its own advantages.
Types of shuttering methods include timber, steel, aluminum, plastic, and fabric.
Timber shuttering is cost-effective and easy to work with, while steel shuttering is durable and reusable.
Aluminum shuttering is lightweight and easy to handle, while plastic shuttering is waterproof and easy to clean.
Fabric shuttering is flexi...
The methodology for finishing activities involves planning, coordination, and attention to detail.
Create a detailed schedule for finishing activities
Coordinate with subcontractors and suppliers to ensure timely delivery of materials
Ensure quality control measures are in place and followed
Conduct regular inspections to identify and address any issues
Communicate regularly with the project team to ensure everyone is on th...
Experienced construction professional with strong leadership and project management skills.
Over 5 years of experience in the construction industry.
Managed multiple construction projects from start to finish, ensuring timely completion and within budget.
Strong knowledge of construction methods, materials, and safety regulations.
Proven ability to lead and motivate teams to achieve project goals.
Excellent communication an...
based on 4 reviews
Rating in categories
Assistant Manager
835
salaries
| ₹4.9 L/yr - ₹19 L/yr |
Manager
325
salaries
| ₹10.5 L/yr - ₹32 L/yr |
Senior Engineer
236
salaries
| ₹4.1 L/yr - ₹12 L/yr |
Piping Engineer
136
salaries
| ₹2.5 L/yr - ₹11.4 L/yr |
Assistant General Manager
127
salaries
| ₹13.4 L/yr - ₹35 L/yr |
TechnipFMC
McDermott International
Saipem
Punj Lloyd