Q1. 132/33/11Kv Transmission line phase to phase clearance

Add your answer

Q2. How many types of tower used in 45° Angel point.

Add your answer

Q3. What is the survey done in the new transmission line.

Add your answer

Q4. What should be the clearance of 33kv line crossing.

Add your answer
Discover NTPC interview dos and don'ts from real experiences

Q5. What type of motor used in your pump house.

Add your answer

Q6. What types of CT & PT used for sub- station

Add your answer
Are these interview questions helpful?

Q7. 90kn & 120kn long rod insulator used in 132kv transmission line.

Add your answer

Q8. What types of conductor used in your site.

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. Which insulator used in 132 transmission line.

Add your answer

Q10. Principal of bearings, refrigeration

Ans.

Bearings are used to reduce friction between two moving parts while refrigeration is the process of cooling a space or substance.

  • Bearings work on the principle of reducing friction between two moving parts by providing a smooth surface for them to roll or slide against each other.

  • Refrigeration works on the principle of removing heat from a space or substance, which causes it to cool down.

  • Bearings are commonly used in machines such as engines, turbines, and pumps to reduce fri...read more

Add your answer

Q11. Designing parameters of heat exchanger,

Ans.

Designing parameters of heat exchanger involves determining heat transfer rate, surface area, fluid flow rate, and material selection.

  • Determine the heat transfer rate required for the application

  • Select appropriate fluids and their flow rates

  • Calculate the surface area required for heat transfer

  • Choose suitable materials for construction based on operating conditions

  • Consider factors such as pressure drop, fouling, and corrosion

  • Optimize the design for efficiency and cost-effectiv...read more

Add your answer

Q12. How can pump seal replacement

Ans.

Pump seal replacement can be done by following proper procedures and using the right tools.

  • Ensure the pump is turned off and disconnected from power source before starting the replacement.

  • Remove the old seal carefully, taking note of its orientation and position.

  • Clean the seal chamber thoroughly before installing the new seal.

  • Apply lubricant or sealant as recommended by the manufacturer.

  • Reassemble the pump and test for leaks before putting it back into operation.

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.9
 • 689 Interview Questions
3.6
 • 381 Interview Questions
3.8
 • 304 Interview Questions
4.0
 • 208 Interview Questions
4.1
 • 162 Interview Questions
View all
Top L&T Water & Effluent Treatment Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter