I was interviewed in May 2023.
Top trending discussions
posted on 28 Aug 2023
I applied via Referral and was interviewed before Aug 2022. There were 3 interview rounds.
My personal information and what my skills...
posted on 16 Apr 2022
I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.
Hire charges and depreciation cost of steel formwork material depend on various factors.
Hire charges depend on the duration of use and the quantity of material required.
Depreciation cost depends on the initial cost of the material and its useful life.
Factors like maintenance cost, storage cost, and transportation cost also affect the overall cost.
Proper planning and management can help in reducing the cost of formwork ...
posted on 3 Jul 2022
I was interviewed in Jun 2022.
posted on 16 Dec 2023
I applied via Referral and was interviewed before Dec 2022. There was 1 interview round.
Formwork system is an engineered arrangement of components for concrete construction.
Formwork system is designed to support the weight of wet concrete and shape it into the desired form.
It consists of various components such as panels, beams, props, and connectors.
These components are assembled and secured together to create a temporary structure.
Formwork systems can be modular, adjustable, or custom-made depending on ...
There are several types of formwork systems used in construction.
Traditional timber formwork
Engineered formwork systems
Reusable plastic formwork
Steel formwork
Aluminum formwork
Climbing formwork
Slip formwork
Jump formwork
Tunnel formwork
Table formwork
posted on 28 Aug 2023
I applied via Referral and was interviewed before Aug 2022. There were 3 interview rounds.
My personal information and what my skills...
posted on 16 Apr 2022
I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.
Hire charges and depreciation cost of steel formwork material depend on various factors.
Hire charges depend on the duration of use and the quantity of material required.
Depreciation cost depends on the initial cost of the material and its useful life.
Factors like maintenance cost, storage cost, and transportation cost also affect the overall cost.
Proper planning and management can help in reducing the cost of formwork ...
posted on 14 May 2021
I applied via Company Website and was interviewed in Aug 2020. There were 2 interview rounds.
The Mivan Formwork system is a construction technique used for high-rise buildings to create efficient and cost-effective concrete structures.
Mivan Formwork system is a type of aluminum formwork system that is used for constructing high-rise buildings.
It involves the use of pre-engineered modular panels and a set of formwork accessories to create the desired structure.
The system allows for rapid construction as the pan...
Yes, I am familiar with the Doka Formwork system.
I have worked with the Doka Formwork system on multiple construction projects.
I am knowledgeable about the different types of Doka Formwork systems, such as the Frami Xlife and Dokadek 30.
I understand how to assemble and dismantle the formwork components correctly.
I am experienced in troubleshooting and resolving any issues that may arise during the formwork process.
I ha...
posted on 11 May 2018
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
874
salaries
| ₹3 L/yr - ₹12.2 L/yr |
Assistant Construction Manager
526
salaries
| ₹5.4 L/yr - ₹17.5 L/yr |
Civil Site Engineer
380
salaries
| ₹1.2 L/yr - ₹8.4 L/yr |
Assistant Engineering Manager
324
salaries
| ₹5 L/yr - ₹17 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA