Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

L&T Construction Primary Teacher Interview Questions and Answers

Updated 11 May 2023

L&T Construction Primary Teacher Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Why are you not applying for other higher classes ? What is your minimum expectations for salary? What will you do after msc ?
  • Ans. Because I want to look my career as PRT Teacher. 18000
  • Answered Anonymously
  • Q2. What will be your expected salary?
  • Q3. What you will do after msc?
  • Q4. What is your hobby?

Interview questions from similar companies

I applied via Company Website and was interviewed in May 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What is MPLS and flow of labels in MPLS
  • Ans. 

    MPLS is a protocol used for efficient packet forwarding. It uses labels to identify paths instead of IP addresses.

    • MPLS stands for Multiprotocol Label Switching

    • Labels are assigned to packets at the ingress router

    • Labels are used to identify the path a packet should take through the network

    • Labels are swapped at each MPLS router along the path

    • The last MPLS router removes the label and forwards the packet based on the IP ad...

  • Answered by AI
  • Q2. What is route reflector in BGP
  • Ans. 

    Route reflector is a BGP feature that allows a router to advertise routes to its clients without requiring full mesh connectivity.

    • Route reflector reduces the number of iBGP peerings required in a network.

    • It helps in scaling the network by reducing the number of updates and processing required.

    • Route reflector can be configured in a hierarchical manner to further reduce the number of iBGP peerings.

    • It is commonly used in ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for the role or profile for which you are applying. Brushup basics about all the topics for your role

Skills evaluated in this interview

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Based on experience and problem faced in project site
  • Q2. Previous site experience and the benifits
  • Q3. Roles and responsibilities of self and the factors affecting company growth

Interview Preparation Tips

Interview preparation tips for other job seekers - don't join in this black hole it is just like company there are no projects for this company the culture is so worst.

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Regarding work Experience
  • Q2. Electrical Distribution network execution
Round 3 - HR 

(1 Question)

  • Q1. Current & expected CTC.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Assignment 

Project Details Work Assignment

Round 2 - Technical 

(1 Question)

  • Q1. Conductor Capacity Rating
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Questions raising on earth work and structures
  • Q2. How many dumpers needed for 15 km how many excavators required
  • Ans. 

    The number of dumpers and excavators needed for a 15 km project depends on various factors such as the type of material being transported and the size of the excavation area.

    • The number of dumpers needed for a 15 km project will depend on the volume and weight of material to be transported, as well as the capacity of each dumper.

    • The number of excavators required will depend on the size of the excavation area, the type o...

  • Answered by AI
  • Q3. What is called a lead
  • Ans. 

    A lead is a potential customer or client who has shown interest in a product or service.

    • A lead is typically generated through marketing efforts such as advertising or networking.

    • Leads can be obtained through various channels such as social media, email campaigns, or trade shows.

    • Once a lead is identified, they are usually passed on to the sales team for further follow-up and conversion.

    • Qualifying leads involves determin...

  • Answered by AI
  • Q4. How much quantity will done 200 machine in hour
  • Ans. 

    The quantity done by 200 machines in an hour depends on the efficiency and capacity of each machine.

    • The quantity done will depend on the output capacity of each machine

    • Factors such as machine speed, efficiency, and type of work being done will also impact the quantity produced

    • For example, if each machine can produce 10 units per hour, then 200 machines will produce 2000 units in an hour

  • Answered by AI
  • Q5. Questioned agin lining works
Round 3 - HR 

(1 Question)

  • Q1. Asking about changing of company and next about my native place

Interview Preparation Tips

Interview preparation tips for other job seekers - Study wll and other wise you can fail

I applied via Naukri.com and was interviewed in Sep 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Technical and Aptitude Questions

Round 3 - Technical 

(2 Questions)

  • Q1. Work done in Previous organisation
  • Q2. Quality Assurance and Control Process
Round 4 - HR 

(1 Question)

  • Q1. What are your salary expectations?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be practical

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.

I applied via Approached by Company and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Some talks about you & how many family members
  • Ans. I talk hem self. And my family details
  • Answered Anonymously
Round 3 - Technical 

(1 Question)

  • Q1. How many caste in your project, and your work responsibility. how many peoples in your under work
  • Ans. My project 70 crores, checking steel quantity side visit and contractor billing, 17 memeber working in my under
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Which going interview than good thinking in your mind and Better face interviewers

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Primary Teacher interview?
L&T Construction interview process usually has 2 rounds. The most common rounds in the L&T Construction interview process are Resume Shortlist and One-on-one Round.

Tell us how to improve this page.

L&T Construction Primary Teacher Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 426 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 133 Interviews
AtkinsRealis Interview Questions
4.0
 • 87 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
703 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
504 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
393 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
323 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview