Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

L&T Construction Primary Teacher Interview Questions and Answers

Updated 11 May 2023

L&T Construction Primary Teacher Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Why are you not applying for other higher classes ? What is your minimum expectations for salary? What will you do after msc ?
  • Ans. Because I want to look my career as PRT Teacher. 18000
  • Answered Anonymously
  • Q2. What will be your expected salary?
  • Q3. What you will do after msc?
  • Q4. What is your hobby?

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.

Interview Questionnaire 

3 Questions

  • Q1. PSC girder
  • Q2. Minor bridge
  • Q3. Related

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Excavation safety, EHS management, Lifting & Erection safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Machinery maintenance Dpr maintenance,local purchasing,

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice,good and teritical intrew done and completed

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

I applied via Company Website and was interviewed in May 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What is MPLS and flow of labels in MPLS
  • Ans. 

    MPLS is a protocol used for efficient packet forwarding. It uses labels to identify paths instead of IP addresses.

    • MPLS stands for Multiprotocol Label Switching

    • Labels are assigned to packets at the ingress router

    • Labels are used to identify the path a packet should take through the network

    • Labels are swapped at each MPLS router along the path

    • The last MPLS router removes the label and forwards the packet based on the IP ad...

  • Answered by AI
  • Q2. What is route reflector in BGP
  • Ans. 

    Route reflector is a BGP feature that allows a router to advertise routes to its clients without requiring full mesh connectivity.

    • Route reflector reduces the number of iBGP peerings required in a network.

    • It helps in scaling the network by reducing the number of updates and processing required.

    • Route reflector can be configured in a hierarchical manner to further reduce the number of iBGP peerings.

    • It is commonly used in ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for the role or profile for which you are applying. Brushup basics about all the topics for your role

Skills evaluated in this interview

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Based on experience and problem faced in project site
  • Q2. Previous site experience and the benifits
  • Q3. Roles and responsibilities of self and the factors affecting company growth

Interview Preparation Tips

Interview preparation tips for other job seekers - don't join in this black hole it is just like company there are no projects for this company the culture is so worst.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI
Contribute & help others!
anonymous
You can choose to be anonymous

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Primary Teacher interview?
L&T Construction interview process usually has 2 rounds. The most common rounds in the L&T Construction interview process are Resume Shortlist and One-on-one Round.

Recently Viewed

INTERVIEWS

Seth M R Jaipuria School

No Interviews

INTERVIEWS

The Heritage School

No Interviews

SALARIES

Global Indian International School

INTERVIEWS

Seth M R Jaipuria School

No Interviews

SALARIES

The British Institutes

INTERVIEWS

St. Xavier's High School

No Interviews

SALARIES

St. Thomas School

INTERVIEWS

St. Xavier's High School

No Interviews

SALARIES

Scholars International School

COMPANY BENEFITS

Global Indian International School

No Benefits

Tell us how to improve this page.

L&T Construction Primary Teacher Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 426 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 133 Interviews
AtkinsRealis Interview Questions
4.0
 • 87 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
705 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
503 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
391 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
322 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent