Filter interviews by
I applied via Walk-in and was interviewed in Aug 2022. There were 3 interview rounds.
Top trending discussions
I applied via Indeed and was interviewed in Sep 2023. There were 3 interview rounds.
We discussed about safety inspections. Importance of safety inspections, steps to follow during inspections.
Types of radiation include ionizing and non-ionizing radiation.
Ionizing radiation: high energy radiation that can remove tightly bound electrons from atoms, causing damage to cells (e.g. X-rays, gamma rays)
Non-ionizing radiation: lower energy radiation that does not have enough energy to remove electrons from atoms, but can still cause harm (e.g. UV rays, radio waves)
Control of Substances Hazardous to Health
COSSH stands for Control of Substances Hazardous to Health
It is a set of regulations that aim to protect workers from health risks associated with hazardous substances
COSSH requires employers to assess and control the risks from hazardous substances in the workplace
Examples of hazardous substances include chemicals, fumes, dusts, and biological agents
I applied via Referral and was interviewed in Oct 2023. There were 2 interview rounds.
Risk assessment is the process of identifying, evaluating, and prioritizing potential risks in order to minimize or eliminate them.
Identifying potential hazards and risks in the workplace
Evaluating the likelihood and severity of these risks
Prioritizing risks based on their level of risk and potential impact
Developing control measures to minimize or eliminate the identified risks
Regularly reviewing and updating the risk
Hierarchy of control is a system used to prioritize and implement measures to eliminate or reduce risks in the workplace.
Elimination - Remove the hazard completely (e.g. replacing a toxic chemical with a safer alternative)
Substitution - Replace the hazard with a less hazardous alternative (e.g. using non-toxic cleaning products)
Engineering controls - Isolate people from the hazard (e.g. installing ventilation systems)
A...
I applied via Job Fair and was interviewed in Aug 2022. There were 2 interview rounds.
posted on 11 Jun 2024
I applied via Naukri.com and was interviewed in Dec 2023. There were 3 interview rounds.
The number of limit switches in a tower crane varies depending on the specific model and manufacturer.
The number of limit switches in a tower crane can range from 2 to 6 or more.
Limit switches are used to prevent the crane from overtraveling or overloading.
Common types of limit switches used in tower cranes include hoisting limit switches, trolley limit switches, and slewing limit switches.
Safety culture in project,hou many year of experience in safety field, inspection
posted on 25 Oct 2023
I applied via Naukri.com and was interviewed in Sep 2023. There were 3 interview rounds.
Basic safety requirements include hazard identification, risk assessment, emergency procedures, training, and personal protective equipment.
Hazard identification: Identifying potential hazards in the workplace
Risk assessment: Evaluating the risks associated with identified hazards
Emergency procedures: Establishing protocols for responding to emergencies
Training: Providing employees with necessary safety training
Persona...
posted on 7 May 2024
I applied via Campus Placement and was interviewed before May 2023. There was 1 interview round.
Material shifting from ground level to height what we take safety precautions at that time.
posted on 1 Nov 2022
I applied via Company Website and was interviewed in May 2022. There were 3 interview rounds.
About your experience, knowledge
I applied via Referral and was interviewed before Aug 2023. There were 2 interview rounds.
Medium level of question
HSE PLAN stands for Health, Safety, and Environment Plan, which outlines strategies and procedures to ensure the well-being of employees and protection of the environment.
HSE PLAN includes risk assessments, emergency response plans, training programs, and compliance with regulations.
It involves identifying hazards, implementing controls, and monitoring performance to prevent accidents and injuries.
Regular reviews and u...
PTW stands for Permit to Work in construction. It is a formal written system used to control certain types of work that are identified as potentially hazardous.
PTW is a document that specifies the work to be done and the precautions to be taken.
It ensures that all necessary safety measures are in place before work begins.
Examples of work that may require a PTW include hot work, confined space entry, and working at heig
posted on 14 Aug 2024
MOC stands for Management of Change. It is a process used to ensure that changes in the workplace do not negatively impact health, safety, or the environment.
MOC involves assessing potential risks associated with a change before implementing it
It requires proper documentation and communication to all relevant parties
Examples of changes that may require MOC include introducing new equipment, modifying procedures, or cha
KPI stands for Key Performance Indicator. It is required to measure the effectiveness of an organization in achieving its objectives.
KPIs are specific metrics used to evaluate the success of an organization or a particular activity.
They help in monitoring progress towards goals and identifying areas that need improvement.
Examples of KPIs in HSE supervision include incident rates, compliance with safety regulations, and
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
874
salaries
| ₹3 L/yr - ₹12.2 L/yr |
Assistant Construction Manager
526
salaries
| ₹5.4 L/yr - ₹17.5 L/yr |
Civil Site Engineer
380
salaries
| ₹1.2 L/yr - ₹8.4 L/yr |
Assistant Engineering Manager
324
salaries
| ₹5 L/yr - ₹17 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA