Upload Button Icon Add office photos

Filter interviews by

Kvtek Power Systems Interview Questions and Answers

Updated 12 Mar 2024

Kvtek Power Systems Interview Experiences

Popular Designations

4 interviews found

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Recruitment Consulltant and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - About company 

(2 Questions)

  • Q1. He put up unrelated to field .
  • Q2. Bad talking sense, misbehave.
Round 2 - HR 

(5 Questions)

  • Q1. Zero job security,and fire any time
  • Ans. 

    Job security is important, but I am confident in my skills and experience to adapt to any situation.

    • I believe in continuously updating my skills to remain competitive in the job market.

    • I have a strong network of professional contacts that can help me find new opportunities if needed.

    • I am adaptable and can quickly learn new roles and responsibilities.

    • I have a positive attitude and am confident in my ability to succeed i

  • Answered by AI
  • Q2. Firstly ask to give 3,4 month but fire with in a 10 days .
  • Q3. Be pressure ( force fully) to write Regination letter.
  • Q4. This is not able to a company this is showing as lala shop. Their is no any system and no respect to senior.
  • Q5. Every month deduct 10000 rupees without any esques. And my 1 lakh is already have to company and not transferred.

Interview Preparation Tips

Interview preparation tips for other job seekers - Wrost place for work and please don't go, zero job safety and your Remaining balance which is cut every month Ten thousand are not be giving you at last off the day in company . Team management is very poor and always irritating employees and always politics with new employees and never stay and not good recommend to go in this company. illerate management to Doing production having 10 pass employee to handle production department , uneducated person don't have any concept to doing componey better profit.

Senior Production Planning and Control Engineer Interview Questions asked at other Companies

Q1. Zero job security,and fire any time
View answer (1)

Interview Questions & Answers

user image Anonymous

posted on 12 Mar 2024

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Recruitment Consulltant and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Related to Design and manufacturing process.

I applied via Approached by Company and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Data structure, mathematical equations, vb. Net
Round 3 - HR 

(1 Question)

  • Q1. Salary and other discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company policy and structure, nice environment for learning

Assistant Software Developer Interview Questions asked at other Companies

Q1. How to add style using javascript
View answer (1)

I applied via Campus Placement

Round 1 - Aptitude Test 

Basic aptitude and engineering oriented test paper.

Round 2 - HR 

(1 Question)

  • Q1. Basic HR questions and background related questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be fair and curious about the job perspective. be clear with concept related to your concerned field of work or knowledge.

Executive Trainer Interview Questions asked at other Companies

Q1. What is the 8D methodology and how is it applied in problem-solving?
View answer (1)

Kvtek Power Systems interview questions for popular designations

 Assistant Software Developer

 (1)

 Executive Trainer

 (1)

 Senior Production Planning and Control Engineer

 (1)

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Technical questions, safety.

Interview Preparation Tips

Interview preparation tips for other job seekers - If u r joined directly to client side of clean max it good, but if you joined 3rd party thy treet like labours.

I applied via LinkedIn and was interviewed before Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Your professional years ,field in which I had experience?
  • Q2. Are you ready to take the challenge
  • Q3. Core expertise & challenges faced till date ?

Interview Preparation Tips

Interview preparation tips for other job seekers - It was good ,need to garner more knowledge so that core expectance are met
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Apr 2024.

Round 1 - HR 

(2 Questions)

  • Q1. About work culture
  • Q2. About technical
Round 2 - Technical 

(1 Question)

  • Q1. Related to Transformer
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I appeared for an interview in Jul 2024.

Round 1 - Technical 

(10 Questions)

  • Q1. Can you tell me about yourself?
  • Q2. What are your responsibilities in the plant?
  • Ans. 

    As a Senior Engineer in the plant, my responsibilities include overseeing operations, managing projects, ensuring compliance with regulations, and leading a team of engineers.

    • Overseeing day-to-day operations in the plant

    • Managing projects related to plant upgrades or expansions

    • Ensuring compliance with safety and environmental regulations

    • Leading and mentoring a team of engineers

    • Troubleshooting technical issues and implem

  • Answered by AI
  • Q3. Why is tan delta testing conducted in power transformers?
  • Ans. 

    Tan delta testing is conducted in power transformers to assess the insulation condition and detect any potential faults.

    • Tan delta testing helps in evaluating the insulation quality of power transformers.

    • It can detect any potential issues such as moisture, contamination, or aging of insulation materials.

    • By measuring the tan delta value, engineers can assess the dielectric losses in the transformer.

    • Regular tan delta test...

  • Answered by AI
  • Q4. What is a vector group?
  • Ans. 

    A vector group is a method used to represent the phase relationship between the primary and secondary windings of a transformer.

    • Vector group indicates the connection of transformer windings and the phase shift between them.

    • It is represented by a combination of letters and numbers, such as Yd1, Dyn11, etc.

    • Different vector groups have different phase relationships, affecting the transformer's performance and operation.

    • Ve...

  • Answered by AI
  • Q5. What should be considered when erecting an IDT (Inverter duty Transformer)?
  • Ans. 

    Considerations when erecting an IDT (Inverter duty Transformer)

    • Ensure the transformer is designed for inverter duty applications

    • Properly size the transformer based on the inverter's output power

    • Consider the harmonic content of the inverter's output when selecting the transformer

    • Provide adequate ventilation and cooling for the transformer to handle the increased heat generated by the inverter

    • Ensure proper grounding and ...

  • Answered by AI
  • Q6. What is the star-delta connection in power transformers?
  • Ans. 

    Star-delta connection is a method used in power transformers to reduce starting current and improve efficiency.

    • Star-delta connection involves connecting the primary windings of the transformer in a star configuration during starting, and then switching to a delta configuration during normal operation.

    • This method helps in reducing the starting current drawn by the transformer, which is beneficial for the power system.

    • It...

  • Answered by AI
  • Q7. What types of conductors are used in high-tension (HT) lines, and what are their current capacities?
  • Ans. 

    High-tension (HT) lines use different types of conductors with varying current capacities.

    • Types of conductors used in HT lines include aluminum, steel, and composite materials

    • Aluminum conductors are commonly used due to their lightweight and high conductivity

    • Steel conductors are used for their strength and durability

    • Composite conductors are a newer technology that offer a balance of strength and conductivity

    • Current cap...

  • Answered by AI
  • Q8. What is the distance between poles in 33KV high tension lines?
  • Ans. 

    The distance between poles in 33KV high tension lines is typically around 50-60 meters.

    • The distance between poles in high tension lines is determined by factors such as terrain, voltage level, and local regulations.

    • In general, the distance can range from 50 to 60 meters for 33KV high tension lines.

    • This distance is important to ensure proper support and insulation of the conductors between poles.

  • Answered by AI
  • Q9. What is the process of laying LT cables?
  • Ans. 

    The process of laying LT cables involves planning, trenching, laying the cables, jointing, testing, and backfilling.

    • Plan the route and depth of the trench for laying the cables.

    • Excavate the trench to the required depth and width.

    • Lay the cables in the trench, ensuring proper alignment and support.

    • Joint the cables together using appropriate connectors.

    • Test the cables for continuity and insulation resistance.

    • Backfill the ...

  • Answered by AI
  • Q10. What is the process for attaching modules?
  • Ans. 

    The process for attaching modules involves identifying connection points, aligning the modules, securing them in place, and testing for functionality.

    • Identify connection points on both modules

    • Align the modules properly to ensure a secure fit

    • Secure the modules in place using appropriate fasteners or connectors

    • Test the functionality of the attached modules to ensure proper connection

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why do you want to change jobs?
  • Ans. 

    Seeking new challenges and opportunities for growth in a more innovative environment.

    • Desire for new challenges and opportunities

    • Seeking growth and advancement

    • Looking for a more innovative work environment

  • Answered by AI
  • Q2. What can you share about your family?
  • Ans. 

    I come from a close-knit family of four, including my parents and younger sister.

    • My parents have always been supportive of my career choices and encouraged me to pursue my passion for engineering.

    • I have a younger sister who is currently studying computer science at university, following in my footsteps.

    • We enjoy spending quality time together, whether it's going on family vacations or simply having dinner at home.

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Personal details and reasons for change
Round 2 - Technical 

(1 Question)

  • Q1. About my job profile, renewal sector and technical questions about my past experience.
Round 3 - Technical 

(1 Question)

  • Q1. With HoD and again technical questions were asked.

Interview Preparation Tips

Topics to prepare for JUNIPER GREEN ENERGY Senior Engineer interview:
  • Contract Management
  • Defect liability
  • Warranty Management

Assistant Manager Interview Questions & Answers

Goldi Solar user image Kripanath Vishwakarma

posted on 14 Mar 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(3 Questions)

  • Q1. Details of previous employment details
  • Q2. Salary details And educational details
  • Ans. We give personal salary structure and shared my personal educational details
  • Answered by Kripanath Vishwakarma
  • Q3. Experience related
  • Ans. We provided proper working experience in hr at the time of hr round interviews
  • Answered by Kripanath Vishwakarma
Round 2 - Technical 

(2 Questions)

  • Q1. Process related all stap basic details
  • Q2. We given all details of the process of Solar module manufacturing related

Kvtek Power Systems Interview FAQs

How many rounds are there in Kvtek Power Systems interview?
Kvtek Power Systems interview process usually has 2 rounds. The most common rounds in the Kvtek Power Systems interview process are HR, Aptitude Test and Resume Shortlist.
What are the top questions asked in Kvtek Power Systems interview?

Some of the top questions asked at the Kvtek Power Systems interview -

  1. Zero job security,and fire any t...read more
  2. This is not able to a company this is showing as lala shop. Their is no any sys...read more
  3. Every month deduct 10000 rupees without any esques. And my 1 lakh is already ha...read more

Tell us how to improve this page.

Kvtek Power Systems Interview Process

based on 2 interviews

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

UTL Solar Interview Questions
3.5
 • 46 Interviews
Senvion Interview Questions
4.0
 • 19 Interviews
M E Energy Interview Questions
4.1
 • 17 Interviews
Gautam Solar Interview Questions
3.8
 • 17 Interviews
LM Wind Power Interview Questions
4.0
 • 13 Interviews
Goldi Solar Interview Questions
4.0
 • 11 Interviews
View all

Kvtek Power Systems Reviews and Ratings

based on 21 reviews

4.5/5

Rating in categories

4.3

Skill development

4.0

Work-life balance

4.2

Salary

3.7

Job security

3.8

Company culture

3.8

Promotions

3.8

Work satisfaction

Explore 21 Reviews and Ratings
ITI Fitter
9 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Electrical Engineer
7 salaries
unlock blur

₹3.2 L/yr - ₹5.2 L/yr

Assistant Manager
6 salaries
unlock blur

₹8.8 L/yr - ₹9.9 L/yr

Software Engineer
4 salaries
unlock blur

₹3.5 L/yr - ₹7 L/yr

Design Engineer
4 salaries
unlock blur

₹4.1 L/yr - ₹5.2 L/yr

Explore more salaries
Compare Kvtek Power Systems with

UTL Solar

3.6
Compare

Danfoss Power Solutions

4.0
Compare

LM Wind Power

4.0
Compare

Senvion

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview