Upload Button Icon Add office photos

Filter interviews by

Kvtek Power Systems Senior Production Planning and Control Engineer Interview Questions and Answers

Updated 12 Mar 2024

1 interview found

Sort by: Popular
Interview experience
1
 Bad
Difficulty level
 Moderate
Duration
 Less than 2 weeks
Result
 No response

I applied via Recruitment Consulltant and was interviewed in Feb 2024.

2 Interview Rounds

1

About company Round (2 Questions)

  • Q1. He put up unrelated to field .
  • Q2. Bad talking sense, misbehave.
2

HR Round (5 Questions)

  • Q1. Zero job security,and fire any time
  • Q2. Firstly ask to give 3,4 month but fire with in a 10 days .
  • Q3. Be pressure ( force fully) to write Regination letter.
  • Q4. This is not able to a company this is showing as lala shop. Their is no any system and no respect to senior.
  • Q5. Every month deduct 10000 rupees without any esques. And my 1 lakh is already have to company and not transferred.

Interview Preparation Tips

Interview preparation tips for other job seekers - Wrost place for work and please don't go, zero job safety and your Remaining balance which is cut every month Ten thousand are not be giving you at last off the day in company . Team management is very poor and always irritating employees and always politics with new employees and never stay and not good recommend to go in this company. illerate management to Doing production having 10 pass employee to handle production department , uneducated person don't have any concept to doing componey better profit.

Kvtek Power Systems Interview FAQs

How many rounds are there in Kvtek Power Systems Senior Production Planning and Control Engineer interview?
Kvtek Power Systems interview process usually has 2 rounds. The most common rounds in the Kvtek Power Systems interview process are HR.
What are the top questions asked in Kvtek Power Systems Senior Production Planning and Control Engineer interview?

Some of the top questions asked at the Kvtek Power Systems Senior Production Planning and Control Engineer interview -

  1. Zero job security,and fire any t...read more
  2. This is not able to a company this is showing as lala shop. Their is no any sys...read more
  3. Every month deduct 10000 rupees without any esques. And my 1 lakh is already ha...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 417 Interviews
Thermax Limited Interview Questions
4.2
 • 234 Interviews
Adani Power Interview Questions
3.9
 • 198 Interviews
Tata Power Interview Questions
4.0
 • 156 Interviews
NTPC Interview Questions
4.2
 • 156 Interviews
Suzlon Group Interview Questions
4.1
 • 122 Interviews
BHEL Interview Questions
4.2
 • 103 Interviews
Reliance Power Interview Questions
4.1
 • 43 Interviews
UTL Solar Interview Questions
3.6
 • 39 Interviews
View all
ITI Fitter
11 salaries
unlock blur

₹2.2 L/yr - ₹3.6 L/yr

Electrical Engineer
7 salaries
unlock blur

₹3.2 L/yr - ₹5.2 L/yr

Assistant Engineer
7 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Assistant Manager
6 salaries
unlock blur

₹8.8 L/yr - ₹9.9 L/yr

Design Engineer
6 salaries
unlock blur

₹3 L/yr - ₹5.2 L/yr

Explore more salaries
Compare Kvtek Power Systems with

BHEL

4.2
Compare

Tata Power

4.0
Compare

Adani Power

3.9
Compare

Reliance Power

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview