Boiler and turbine parameters are critical for efficient operation of power plants.
Boiler parameters include pressure, temperature, and efficiency.
Turbine parameters include speed, efficiency, and power output.
Monitoring and controlling these parameters is essential for optimal plant performance.
Examples of boiler parameters: pressure of 100 bar, temperature of 500°C, efficiency of 90%.
Examples of turbine parameters: s...
Implemented new operational procedures to streamline processes and improve efficiency.
Developed and implemented new SOPs for various departments
Analyzed current workflows and identified areas for improvement
Trained staff on new procedures and monitored their implementation
Conducted regular audits to ensure compliance and effectiveness
OT and LWW can be calculated by multiplying the number of hours worked by the applicable overtime rate.
Calculate OT by multiplying the number of hours worked over the standard work week by the overtime rate (usually 1.5 times the regular rate).
Calculate LWW by multiplying the number of hours worked on the weekend or public holidays by the applicable rate (usually 2 times the regular rate).
Ensure to follow company polic...
based on 1 interview
Interview experience
DCS Engineer
59
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Operator
38
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Technician
29
salaries
| ₹1.5 L/yr - ₹4.1 L/yr |
Shift Engineer
26
salaries
| ₹2.3 L/yr - ₹7.2 L/yr |
Shift Incharge
26
salaries
| ₹3 L/yr - ₹7.8 L/yr |
Gujarat Alkalies & Chemicals
Tata Chemicals
Pidilite Industries
UPL