i
KONE
Filter interviews by
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
Lift is a vertical transportation system that moves people or goods between floors or levels of a building.
Lifts are commonly used in high-rise buildings.
They operate using a motorized system that moves a cab or platform up and down a shaft.
Lifts can be hydraulic, traction, or pneumatic.
They are equipped with safety features such as emergency brakes and backup power supplies.
Lifts are regulated by safety codes and stan
Types of lift include hydraulic, traction, and pneumatic lifts.
Hydraulic lifts use fluid pressure to move the elevator car.
Traction lifts use cables and a counterweight to move the car.
Pneumatic lifts use air pressure to move the car.
Other types of lifts include scissor lifts, boom lifts, and platform lifts.
There are various types of elevators such as hydraulic, traction, pneumatic, residential, machine room-less, etc.
Hydraulic elevators use a hydraulic piston to move the elevator car.
Traction elevators use cables and counterweights to move the car.
Pneumatic elevators use air pressure to move the car.
Residential elevators are designed for private homes.
Machine room-less elevators do not require a separate machine room.
Fre...
I applied via Company Website and was interviewed in Dec 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Nov 2024. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Oct 2024. There was 1 interview round.
Elevator template fixing in shaft involves securing the template to the shaft walls for accurate installation of elevator components.
Ensure the template is properly aligned with the shaft walls
Use appropriate fasteners to secure the template in place
Check for any obstructions or obstacles that may affect the installation process
Motor installation involves mounting the motor securely and connecting it to the elevator system.
Securely mount the motor to the designated location in the elevator shaft.
Connect the motor to the power source and control panel using appropriate wiring.
Ensure proper alignment and tension of the motor belts for smooth operation.
Test the motor to ensure it is functioning correctly before putting it into regular use.
Rail alignment is achieved by ensuring the rails are straight, level, and properly spaced.
Use a laser level to check for straightness and levelness of the rails
Measure the distance between the rails to ensure proper spacing
Adjust the rail supports as needed to achieve proper alignment
Check for any obstructions or debris that may affect alignment
Test the alignment by running the elevator car up and down the rails
KONE interview questions for popular designations
I applied via Referral and was interviewed in May 2024. There were 4 interview rounds.
It was a written round consists of Apti, coding and Verbal, cognitive.
Java is a popular programming language known for its features like platform independence, object-oriented programming, and automatic memory management.
JDK (Java Development Kit) is a software development kit used for developing Java applications. It includes JRE, compiler, debugger, and other tools.
JVM (Java Virtual Machine) is an abstract machine that provides a runtime environment for Java bytecode to be executed. It...
Inheritance is a concept in object-oriented programming where a class inherits properties and behaviors from another class.
Inheritance allows for code reusability by creating a new class that is based on an existing class.
The new class, known as the subclass or derived class, inherits attributes and methods from the parent class, known as the superclass or base class.
Subclasses can also add new attributes or methods, o...
Get interview-ready with Top KONE Interview Questions
I applied via Company Website and was interviewed in Aug 2024. There was 1 interview round.
I applied via Campus Placement and was interviewed in May 2024. There were 3 interview rounds.
My Gd topic was AI will take job or create job
I applied via Job Portal and was interviewed in Nov 2024. There was 1 interview round.
Plum drop karne se pahle temporary wooden ki template banai jaati hai drawing ke according usko banakar top floor bedroom mein fix ki jaati hai uske bad plum drop karte Hain aur drawing ke according set kiye jaate Hain drawing ke according bracket to bracket marking karke (fix kiye jaate Hain
Car and counter real hosting high risk activity and (to bracket alignment and car and counter with diagonal
Roping pahle counter ki taraf se ki jaati hai yah ek risk activities hai isko karne se pahle proper communication hona chahie and certified employees honi chahie
I appeared for an interview in Jan 2025.
I have over 10 years of experience working in the elevator industry, specializing in installation, maintenance, and repair of various elevator systems.
Extensive experience in installing new elevator systems and modernizing existing ones
Proficient in conducting routine maintenance checks and troubleshooting issues
Skilled in repairing mechanical and electrical components of elevators
Knowledgeable about safety regulations
I applied via Naukri.com and was interviewed in May 2024. There were 3 interview rounds.
Written Test about psychological, questions were more about real time situations
Top trending discussions
The duration of KONE interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 104 interviews
Interview experience
based on 1.4k reviews
Rating in categories
Design Engineer
192
salaries
| ₹2 L/yr - ₹9.1 L/yr |
Assistant Manager
148
salaries
| ₹6.2 L/yr - ₹19 L/yr |
Senior Engineer
126
salaries
| ₹4.9 L/yr - ₹14.9 L/yr |
Engineer
115
salaries
| ₹2.4 L/yr - ₹10.3 L/yr |
Process Agent
113
salaries
| ₹2.3 L/yr - ₹5.2 L/yr |
John Deere
ABB
Caterpillar Inc
Schindler