Upload Button Icon Add office photos
Premium Employer

i

This company page is being actively managed by KONE Team. If you also belong to the team, you can get access from here

KONE Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KONE Interview Questions, Process, and Tips

Updated 19 Mar 2025

Top KONE Interview Questions and Answers

View all 7 questions

KONE Interview Experiences

Popular Designations

103 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I appeared for an interview in Feb 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Round 1 is Microsoft teams online round-General Introduction,Resume coverage
Round 3 - Technical 

(1 Question)

  • Q1. Face to face interview-Very depth question based on your resume
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion and general questions

Senior Quality Engineer Interview Questions asked at other Companies

Q1. what is least count of vernier caliper ,micrometer, height gauge?
View answer (13)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

It was basically a aptitude round of 60 questions.

Round 2 - Coding Test 

There were 3 coding questions.The question was based on Recursion and
Dynamic problem.

Round 3 - Technical 

(1 Question)

  • Q1. Self introduction What is polymorphism, oops concepts DBMS Indexes Normalisation Abstraction vs interface

Interview Preparation Tips

Topics to prepare for KONE Software Developer interview:
  • Java
Interview preparation tips for other job seekers - For Coding round, you can solve LeetCode.

Software Developer Interview Questions asked at other Companies

Q1. Maximum Subarray Sum Problem Statement Given an array of integers, determine the maximum possible sum of any contiguous subarray within the array. Example: Input: array = [34, -50, 42, 14, -5, 86] Output: 137 Explanation: The maximum sum is... read more
View answer (43)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. He is first ask a questions from your resume only so don't put unwanted words in your resume
  • Q2. What is stress and strain, governor purpose, about kone, etc..

Design Engineer Interview Questions asked at other Companies

Q1. Stress Strain curve, What will happen if you use petrol in diesel engine and Diesel in petrol engone.
View answer (5)
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What are the safety in lift
  • Ans. 

    Safety measures to be taken while using a lift

    • Ensure the lift is regularly maintained and inspected

    • Do not overload the lift beyond its capacity

    • Do not force open the lift doors

    • Do not use the lift during a fire emergency

    • In case of a power failure, do not attempt to exit the lift on your own

    • Use the emergency alarm or phone inside the lift to call for help

    • Keep hands and feet away from the lift doors

    • Do not jump or play insi

  • Answered by AI
  • Q2. What is MCB AND ELCB
  • Ans. 

    MCB stands for Miniature Circuit Breaker and ELCB stands for Earth Leakage Circuit Breaker.

    • MCB is an automatic switch that protects an electrical circuit from damage caused by overload or short circuit.

    • ELCB is a safety device used in electrical installations with high earth impedance to prevent electric shock.

    • MCB is used to protect individual circuits while ELCB is used to protect against electric shock.

    • MCB is commonly...

  • Answered by AI

Electrical Technician Interview Questions asked at other Companies

Q1. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11 KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV Switches gears,VCB,ACB,MOCB,SF6 Breakers, Breake... read more
View answer (4)

KONE interview questions for popular designations

 Installation Engineer

 (6)

 Elevator Technician

 (4)

 Design Engineer

 (4)

 Lab Technician

 (2)

 Maintenance Manager

 (2)

 Maintenance Executive

 (2)

 Software Developer

 (2)

 Electronics Engineer

 (2)

I applied via LinkedIn and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - One-on-one 

(3 Questions)

  • Q1. How do manage a Problem?
  • Ans. 

    I approach problems systematically by identifying the root cause and developing a plan to address it.

    • Gather information to fully understand the problem

    • Identify the root cause of the problem

    • Develop a plan to address the root cause

    • Implement the plan and monitor progress

    • Evaluate the effectiveness of the solution and make adjustments as needed

  • Answered by AI
  • Q2. How to manage escalation?
  • Ans. 

    Escalation can be managed by setting clear escalation paths, defining criteria for escalation, and ensuring timely communication.

    • Establish clear escalation paths and ensure all stakeholders are aware of them

    • Define criteria for escalation based on severity, impact, and urgency

    • Ensure timely communication and updates throughout the escalation process

    • Document all escalations and their outcomes for future reference

  • Answered by AI
  • Q3. Explain about risk management?
  • Ans. 

    Risk management is the process of identifying, assessing, and controlling risks to minimize negative impact on an organization.

    • Identify potential risks and their likelihood of occurring

    • Assess the potential impact of each risk

    • Develop strategies to mitigate or avoid risks

    • Monitor and review risks regularly

    • Examples include financial risk, cybersecurity risk, and operational risk

  • Answered by AI
Round 2 - Behavioral 

(3 Questions)

  • Q1. Explain your understanding about this JD
  • Q2. How do you fit to this job?
  • Q3. What is your exposure for this role?
Round 3 - HR 

(3 Questions)

  • Q1. Why are you looking for a job change?
  • Q2. What are your expectations from Kone?
  • Q3. What is your Expected CTC?
  • Ans. 

    My expected CTC is in line with industry standards and commensurate with my experience and skills.

    • My expected CTC is based on my current salary, industry standards, and the responsibilities of the role.

    • I have researched the market and have a realistic expectation for my salary.

    • I am open to negotiation based on the overall compensation package.

    • I am looking for a fair and competitive salary that reflects my experience an...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Do understand the given job description and be prepared how do you fit to the role.

Technical Service Manager Interview Questions asked at other Companies

Q1. Can you create a network diagram for the International Leased Line (ILL) that illustrates the devices involved in establishing an end-to-end connection from the internet gateway to the customer premise equipment (CPE)?
View answer (1)

Get interview-ready with Top KONE Interview Questions

I applied via Walk-in and was interviewed in Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. One on one round and other one
  • Q2. On company rules or ur rules
Round 3 - Technical 

(1 Question)

  • Q1. I know errection and maintenance ..

Interview Preparation Tips

Interview preparation tips for other job seekers - May very much wish to work in your company ।।।।।।।।

Senior Technician Interview Questions asked at other Companies

Q1. What would you do if the computer is turned off and doesn’t turn on ?
View answer (2)

Jobs at KONE

View all

Workman Interview Questions & Answers

user image Anonymous

posted on 15 Mar 2023

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - C v 

(2 Questions)

  • Q1. What do you know about Kone, and why do you want to work for this company? How do you keep up with the latest
  • Q2. Can you walk me through the steps you take to ensure safety protocols are followed on a job site?
  • Ans. 

    I ensure safety protocols on job sites by implementing a comprehensive safety plan and conducting regular safety inspections.

    • Develop a safety plan that outlines all safety procedures and protocols

    • Train all workers on the safety plan and ensure they understand and follow it

    • Conduct regular safety inspections to identify and address any potential hazards

    • Provide workers with appropriate personal protective equipment (PPE) ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Kone elevator private limited India work in the Mumbai

Workman Interview Questions asked at other Companies

Q1. What is the measuring equipment five name?
View answer (12)

Interview Questions & Answers

user image Anonymous

posted on 1 Feb 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Process knowledge and basic accounting skill was tested.

Sales Person Interview Questions & Answers

user image Anonymous

posted on 3 Feb 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Dislikes and likes of me
  • Q2. Key strength areas of work

Interview Preparation Tips

Interview preparation tips for other job seekers - Be technically ready and open for reallocation. Kone Salaries are not up to mark

Sales Person Interview Questions asked at other Companies

Q1. Why sales? What is the difference between sales and marketing
View answer (2)
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Group discussion is very important because communication skills are very important to us

Round 3 - HR 

(4 Questions)

  • Q1. Ask any technical question
  • Q2. Ask any knowledgable question
  • Q3. Ask any memorable question
  • Q4. Ask any spirtual question

Interview Preparation Tips

Interview preparation tips for other job seekers - This present situation job is very important to us . So keep ur job very sincerely.

Information Technology Recruiter Interview Questions asked at other Companies

Q1. Types of Visas and tax terms
View answer (2)

KONE Interview FAQs

How many rounds are there in KONE interview?
KONE interview process usually has 2-3 rounds. The most common rounds in the KONE interview process are Technical, HR and Resume Shortlist.
How to prepare for KONE interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KONE. The most common topics and skills that interviewers at KONE expect are Sales, Elevators, Direct Sales, Lifts and Sales Engineering.
What are the top questions asked in KONE interview?

Some of the top questions asked at the KONE interview -

  1. What is Environmental Compliance? Why is it important? How is it linked to P...read more
  2. Different Types of Elevator. The different types of lifts or elevators include ...read more
  3. Types of motor used for Lift installati...read more
How long is the KONE interview process?

The duration of KONE interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

KONE Interview Process

based on 102 interviews

Interview experience

4.2
  
Good
View more

Interview Questions from Similar Companies

ABB Interview Questions
4.1
 • 239 Interviews
John Deere Interview Questions
4.1
 • 233 Interviews
Caterpillar Inc Interview Questions
4.2
 • 177 Interviews
Hitachi Interview Questions
4.0
 • 81 Interviews
Atlas Copco Interview Questions
4.2
 • 78 Interviews
Schindler Interview Questions
3.9
 • 77 Interviews
Toshiba Interview Questions
4.0
 • 28 Interviews
BEML Interview Questions
4.0
 • 23 Interviews
View all

KONE Reviews and Ratings

based on 1.4k reviews

4.1/5

Rating in categories

3.8

Skill development

4.1

Work-life balance

3.7

Salary

4.1

Job security

4.0

Company culture

3.4

Promotions

3.8

Work satisfaction

Explore 1.4k Reviews and Ratings
Assistant Manager / Senior Engineer- Sales

Bhopal

6-11 Yrs

Not Disclosed

Job Opening For HR Executive - Chennai

Chennai

2-5 Yrs

₹ 3-4 LPA

Modernization sales - Senior Engineer - Mumbai/Navi Mumbai

Mumbai Suburban,

Navi Mumbai

+1

2-7 Yrs

Not Disclosed

Explore more jobs
Design Engineer
191 salaries
unlock blur

₹2 L/yr - ₹9.1 L/yr

Assistant Manager
148 salaries
unlock blur

₹6.2 L/yr - ₹19 L/yr

Senior Engineer
126 salaries
unlock blur

₹4.9 L/yr - ₹14.9 L/yr

Engineer
115 salaries
unlock blur

₹2.4 L/yr - ₹10.3 L/yr

Process Agent
112 salaries
unlock blur

₹2.3 L/yr - ₹5.2 L/yr

Explore more salaries
Compare KONE with

John Deere

4.1
Compare

ABB

4.1
Compare

Caterpillar Inc

4.2
Compare

Schindler

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview