Upload Button Icon Add office photos
Premium Employer

i

This company page is being actively managed by KONE Team. If you also belong to the team, you can get access from here

KONE Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KONE Installation Engineer Interview Questions and Answers

Updated 9 Jan 2025

KONE Installation Engineer Interview Experiences

6 interviews found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Kone instlater (TA) mod job
  • Q2. I m intrest in job work exprance is Abal abal
  • Q3. Thes is a smart elavoter and the way safety from clound
  • Q4. I m 5 year exprance and I plajer my work
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Rustamji Institute of Technology, Tekanpur and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Technical questions core subject
  • Q2. Core subject related question you must attempt all the questions no negative marking
Round 2 - Group Discussion 

My Gd topic was AI will take job or create job

Round 3 - One-on-one 

(2 Questions)

  • Q1. Panel interview
  • Q2. Basic questions about life then technical questions and about elevator industry

Interview Preparation Tips

Topics to prepare for KONE Installation Engineer interview:
  • Thermodynamics
  • Automobile Engineering
  • strength of material
Interview preparation tips for other job seekers - You must read your core subject project you made in your final year also do read about elevator

Installation Engineer Interview Questions Asked at Other Companies

Q1. How many digree angle cut fibre
Q2. What is the colour code of 24 core fiber
Q3. What is fiber optic & FTTH known
asked in Team Lease
Q4. What is Cable fault identify tool name?
Q5. How to plan project installation schedule?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Dec 2023.

Round 1 - Technical 

(2 Questions)

  • Q1. About current working company
  • Q2. Basic about elevator components
Round 2 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    I am a dedicated and experienced Installation Engineer with a strong background in setting up and maintaining various systems and equipment.

    • Experienced in installing and configuring hardware and software systems

    • Skilled in troubleshooting and resolving technical issues

    • Strong knowledge of electrical systems and wiring

    • Ability to work independently and as part of a team

    • Excellent communication and problem-solving skills

  • Answered by AI
  • Q2. Existing project handled details
Round 3 - HR 

(2 Questions)

  • Q1. Expected salary
  • Ans. 

    My expected salary is competitive based on my experience, skills, and the industry standard.

    • I am looking for a salary that reflects my qualifications and the responsibilities of the role.

    • I am open to discussing salary based on the overall compensation package offered.

    • I have researched the average salary range for Installation Engineers in this region.

    • I am confident that my skills and experience warrant a competitive sa

  • Answered by AI
  • Q2. Notice period

Interview Preparation Tips

Interview preparation tips for other job seekers - Dress well.use full hand plain shirt eith light colour.
Tell all the information neat and clear.
Dont add extra masala for your story

Installation Engineer Interview Questions & Answers

user image Vikas Rajendra Patil

posted on 25 Aug 2022

I applied via Recruitment Consulltant and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About last work experience
  • Q2. Tell me about your Family Background?

Interview Preparation Tips

Interview preparation tips for other job seekers - One of the good company to work nice work culture and supporting staff.

KONE interview questions for designations

 Senior Installation Engineer

 (1)

 Installation Technician

 (1)

 Elevator Installation Technician

 (1)

 Electrical Engineer

 (1)

 Service Engineer

 (1)

 Mechanical Engineer

 (1)

 Junior Engineer - Maintenance

 (1)

 Electrical Maintenance Engineer

 (1)

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Tell me about yourself
  • Q2. About current job project summary
  • Q3. Enquiry about why you are looking for job change
  • Q4. Why should we hire you?
Round 3 - HR 

(2 Questions)

  • Q1. About family background
  • Q2. Notice period and salary part

Interview Preparation Tips

Interview preparation tips for other job seekers - Attend the interview with clear idea.dont add and extra essence in your summary. Be clear with your answers.prefer light colour full hand shirt.
Interview experience
3
Average
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Elevator installation knowledge, about me, day plan etc
  • Q2. Balancing of an elevator?
  • Ans. 

    Balancing an elevator involves adjusting the counterweights and the tension of the cables to ensure smooth and safe operation.

    • The counterweights must be adjusted to match the weight of the elevator car and its occupants.

    • The tension of the cables must be adjusted to prevent the car from bouncing or jerking during operation.

    • Balancing should be done periodically to ensure continued safe and efficient operation.

    • Failure to ...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. About salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing much be confident you will ne hired eaily, you need to get knowledge about local architecture, civil consultants etc.

Installation Engineer Jobs at KONE

View all

Interview questions from similar companies

Safety Engineer Interview Questions & Answers

ABB user image Mallikarjun Sakri

posted on 6 Dec 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Types of Control measures
  • Ans. 

    Control measures are actions taken to eliminate or reduce hazards and risks in order to ensure safety.

    • Engineering controls: Physical modifications to eliminate or minimize hazards (e.g. machine guards, ventilation systems)

    • Administrative controls: Policies, procedures, and training to reduce exposure to hazards (e.g. safety training, work permits)

    • Personal protective equipment (PPE): Equipment worn to protect against spe...

  • Answered by AI
  • Q2. What HIRA explain
  • Ans. What is Unsafe act and Unsafe condition and near miss ?
  • Answered by Mallikarjun Sakri
  • Q3. What are the checklist for lifting plan ?
  • Ans. 

    Checklist for lifting plan includes assessing load weight, selecting appropriate lifting equipment, ensuring proper rigging, and conducting pre-lift inspections.

    • Assess the weight of the load to determine the appropriate lifting equipment and techniques.

    • Select the appropriate lifting equipment based on the load weight and characteristics.

    • Ensure proper rigging by inspecting and using appropriate slings, hooks, and attach...

  • Answered by AI
  • Q4. What is load chart and why it is used ?
  • Ans. 

    A load chart is a graphical representation of the safe working load limits of a crane or lifting equipment.

    • A load chart provides information about the maximum weight that can be safely lifted at different boom lengths and angles.

    • It helps operators determine the safe working limits of the equipment.

    • Load charts are specific to each type and model of crane or lifting equipment.

    • They take into account factors such as boom l...

  • Answered by AI
  • Q5. Hierarchy of Control measures?
  • Ans. 

    Hierarchy of Control measures refers to a systematic approach to eliminate or minimize hazards in the workplace.

    • Elimination: Remove the hazard completely, e.g. replacing a hazardous substance with a safer alternative.

    • Substitution: Replace the hazard with a less hazardous alternative, e.g. using non-toxic chemicals instead of toxic ones.

    • Engineering controls: Implement physical changes to the workplace to reduce exposure...

  • Answered by AI
  • Q6. What is Emergency exit and emergency assembly point ?
  • Ans. 

    Emergency exit is a designated route for evacuating a building during an emergency. Emergency assembly point is a predetermined location where individuals gather after evacuating.

    • Emergency exit is a route that allows people to quickly and safely leave a building during emergencies such as fires, earthquakes, or other hazards.

    • Emergency exits are typically marked with signs and are strategically placed throughout a build...

  • Answered by AI

I applied via Other and was interviewed in Dec 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. How is the grabitesinal force
  • Ans. 

    The question is unclear and seems to be unrelated to the HSE Officer role.

    • The term 'grabitesinal' is not a recognized term in the field of health and safety.

    • It is possible that the interviewer misspoke or meant to ask a different question.

    • As an HSE Officer, my focus is on identifying and mitigating workplace hazards to ensure the safety of employees.

    • I am well-versed in regulations and best practices related to occupati...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - AB groups
Thi

KONE Interview FAQs

How many rounds are there in KONE Installation Engineer interview?
KONE interview process usually has 2-3 rounds. The most common rounds in the KONE interview process are Technical, HR and One-on-one Round.
How to prepare for KONE Installation Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KONE. The most common topics and skills that interviewers at KONE expect are Installation, Elevators, Hazardous Waste Management, Lifts and Manpower.
What are the top questions asked in KONE Installation Engineer interview?

Some of the top questions asked at the KONE Installation Engineer interview -

  1. Balancing of an elevat...read more
  2. Core subject related question you must attempt all the questions no negative ma...read more
  3. Basic questions about life then technical questions and about elevator indus...read more

Tell us how to improve this page.

KONE Installation Engineer Interview Process

based on 5 interviews

2 Interview rounds

  • Technical Round
  • HR Round
View more

Interview Questions from Similar Companies

John Deere Interview Questions
4.1
 • 228 Interviews
Caterpillar Inc Interview Questions
4.3
 • 178 Interviews
Hitachi Interview Questions
4.0
 • 82 Interviews
Atlas Copco Interview Questions
4.2
 • 78 Interviews
Schindler Interview Questions
3.9
 • 74 Interviews
TK Elevator Interview Questions
3.9
 • 54 Interviews
Otis Elevator Interview Questions
4.0
 • 48 Interviews
Johnson Lifts Interview Questions
3.9
 • 39 Interviews
Toshiba Interview Questions
4.0
 • 28 Interviews
View all
KONE Installation Engineer Salary
based on 45 salaries
₹3 L/yr - ₹10.6 L/yr
49% more than the average Installation Engineer Salary in India
View more details

KONE Installation Engineer Reviews and Ratings

based on 22 reviews

4.4/5

Rating in categories

4.3

Skill development

3.3

Work-life balance

3.3

Salary

4.0

Job security

3.7

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 22 Reviews and Ratings
Installation Engineer

Panipat

2-7 Yrs

₹ 3-8 LPA

Installation Engineer

Nashik,

Surat

+1

2-7 Yrs

₹ 3-8 LPA

Installation Engineer

Chandigarh,

Agra

+1

3-7 Yrs

₹ 3-7.0438 LPA

Explore more jobs
Design Engineer
188 salaries
unlock blur

₹2 L/yr - ₹9.1 L/yr

Assistant Manager
148 salaries
unlock blur

₹6.2 L/yr - ₹19 L/yr

Senior Engineer
134 salaries
unlock blur

₹5 L/yr - ₹13.3 L/yr

Engineer
115 salaries
unlock blur

₹2.4 L/yr - ₹10.3 L/yr

Process Agent
112 salaries
unlock blur

₹2.3 L/yr - ₹5.2 L/yr

Explore more salaries
Compare KONE with

Schindler

3.9
Compare

Otis Elevator

4.0
Compare

TK Elevator

3.9
Compare

Johnson Lifts

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview