I applied via Recruitment Consulltant and was interviewed in Oct 2024. There was 1 interview round.
Elevator template fixing in shaft involves securing the template to the shaft walls for accurate installation of elevator components.
Ensure the template is properly aligned with the shaft walls
Use appropriate fasteners to secure the template in place
Check for any obstructions or obstacles that may affect the installation process
Motor installation involves mounting the motor securely and connecting it to the elevator system.
Securely mount the motor to the designated location in the elevator shaft.
Connect the motor to the power source and control panel using appropriate wiring.
Ensure proper alignment and tension of the motor belts for smooth operation.
Test the motor to ensure it is functioning correctly before putting it into regular use.
Rail alignment is achieved by ensuring the rails are straight, level, and properly spaced.
Use a laser level to check for straightness and levelness of the rails
Measure the distance between the rails to ensure proper spacing
Adjust the rail supports as needed to achieve proper alignment
Check for any obstructions or debris that may affect alignment
Test the alignment by running the elevator car up and down the rails
Top trending discussions
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Compilation process involves several steps to convert source code into executable code.
Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.
Compilation: Translates source code into assembly code.
Assembly: Converts assembly code into machine code.
Linking: Combines object files and libraries to create an executable file.
Loading: Loads the executable file into memory and prepares it
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jun 2020. There were 3 interview rounds.
Chiller and VRF systems differ in their cooling capacity, efficiency, and cost.
Chillers are better suited for large commercial buildings with high cooling loads.
VRF systems are more efficient and cost-effective for smaller buildings or individual rooms.
Chillers use water as a cooling medium, while VRF systems use refrigerant.
Chillers require more maintenance and have a longer lifespan than VRF systems.
VRF systems offer...
posted on 23 Feb 2024
I applied via Recruitment Consulltant and was interviewed in Sep 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Jul 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 4 interview rounds.
based on 2 interviews
Interview experience
based on 7 reviews
Rating in categories
Design Engineer
188
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
147
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
134
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
115
salaries
| ₹0 L/yr - ₹0 L/yr |
Process Agent
112
salaries
| ₹0 L/yr - ₹0 L/yr |
Schindler
Otis Elevator
TK Elevator
Johnson Lifts