Upload Button Icon Add office photos

Kolte Patil Developers

Compare button icon Compare button icon Compare

Filter interviews by

Kolte Patil Developers Assistant Manager - MEP Interview Questions and Answers

Updated 8 Feb 2024

Kolte Patil Developers Assistant Manager - MEP Interview Experiences

2 interviews found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Introduction with you work experience related questions.
  • Q2. Technical skills

Interview Preparation Tips

Interview preparation tips for other job seekers - First read the Job description and make the CV according to job description.
Add all key points.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Asking questions regarding your profile 1) Past work experience, current CTC, Aspectation.
Round 2 - Technical 

(1 Question)

  • Q1. 1)Core technical base on site experience. 2) How to manage the project and manpower.

Assistant Manager - MEP Interview Questions Asked at Other Companies

Q1. What are capacities of pumps and their applications in your exper ... read more
Q2. What is the range of exposure you have of CS/MS pipeline construc ... read more
Q3. What is the type of ventilation provided in building basements.
asked in L&T Realty
Q4. What is the pressure requirement for CP?
Q5. Type of HVAC systems used for a commercial building

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(6 Questions)

  • Q1. Fire Fighting System - Pump head calculations and Pump room logic
  • Q2. Describe the Automatic sprinkler system, Hydrant system and FAPA system
  • Ans. 

    Automatic sprinkler system, Hydrant system and FAPA system are fire protection systems used in buildings.

    • Automatic sprinkler system is a fire suppression system that uses water to extinguish fires. It consists of a network of pipes with sprinkler heads that activate when heat is detected.

    • Hydrant system is a fire protection system that uses water from a pressurized source to extinguish fires. It consists of a network of...

  • Answered by AI
  • Q3. NFPA and NBC standards
  • Q4. PHE - Types of pipes used in system
  • Ans. 

    Different types of pipes are used in PHE systems depending on the application and fluid being transported.

    • Common types of pipes used in PHE systems include copper, PVC, CPVC, PEX, and galvanized steel.

    • Copper pipes are often used for hot and cold water supply lines due to their durability and resistance to corrosion.

    • PVC and CPVC pipes are commonly used for drainage and waste systems due to their affordability and ease o...

  • Answered by AI
  • Q5. PHE - Types water supply system
  • Ans. 

    There are two types of water supply systems - direct and indirect.

    • Direct water supply system - water is supplied directly from the mains to the point of use without any storage tank.

    • Indirect water supply system - water is stored in a tank and then supplied to the point of use through pipes.

    • Direct systems are commonly used in high-rise buildings while indirect systems are used in low-rise buildings.

    • Direct systems are mo...

  • Answered by AI
  • Q6. Basement mechanical ventilation system working principle
  • Ans. 

    Basement mechanical ventilation system is designed to remove stale air and moisture from the basement and replace it with fresh air.

    • The system consists of an exhaust fan that pulls out stale air and moisture from the basement.

    • Fresh air is brought in through an intake vent or duct.

    • The system may also include a dehumidifier to control moisture levels.

    • Proper maintenance is important to ensure the system functions effectiv

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is the Water distribution code ?
  • Ans. 

    The Water distribution code is a set of regulations and guidelines that govern the design, installation, and maintenance of water distribution systems.

    • The Water distribution code outlines the requirements for the layout and sizing of pipes, valves, and fittings in a water distribution system.

    • It includes specifications for materials to be used, such as types of pipes and joints.

    • The code also covers testing procedures to...

  • Answered by AI
  • Q2. What is electrical standard code as per NBC
  • Ans. 

    The electrical standard code as per NBC refers to the National Building Code of India.

    • The National Building Code of India (NBC) provides guidelines and standards for electrical installations in buildings.

    • It covers aspects such as wiring, earthing, electrical equipment, and safety measures.

    • Compliance with NBC ensures that electrical systems in buildings are safe, efficient, and meet regulatory requirements.

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Plumbing codes definition required
  • Ans. 

    Plumbing codes are regulations set by local governments to ensure safe and efficient plumbing systems in buildings.

    • Plumbing codes dictate the materials, design, installation, and maintenance requirements for plumbing systems.

    • Examples of plumbing codes include the International Plumbing Code (IPC) and the Uniform Plumbing Code (UPC).

    • Compliance with plumbing codes is essential to prevent health hazards, ensure water effi

  • Answered by AI
  • Q2. Electrical codes definition required
  • Ans. 

    Electrical codes are regulations and standards set by authorities to ensure safety and proper installation of electrical systems.

    • Electrical codes are rules and regulations established by national and local authorities to ensure the safe installation and operation of electrical systems.

    • These codes cover aspects such as wiring, grounding, protection against electrical shock, and fire safety.

    • Examples of electrical codes i...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Overall very strictly interview
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Reinforcement detailing and execution
  • Q2. What you will do give best out put and over come the challenges
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Ask about sap t code
  • Q2. Ask about statutory
Round 3 - HR 

(2 Questions)

  • Q1. Ask about why should hire
  • Q2. Ask about self introduction

I applied via Referral and was interviewed before Nov 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1.  About my Self
  • Q2. Height work safety & Control measures
  • Ans. 

    Height work safety involves implementing control measures to prevent falls and injuries.

    • Conducting a risk assessment before starting any work at height

    • Providing appropriate training and equipment for workers

    • Implementing a fall protection plan

    • Regularly inspecting equipment and ensuring it is in good condition

    • Establishing clear communication and emergency procedures

    • Examples of control measures include guardrails, safety ...

  • Answered by AI
  • Q3. Engineering control, legal control , administrative control, ppe

Interview Preparation Tips

Interview preparation tips for other job seekers - No Fear For Interview Questions

I applied via Referral and was interviewed before Nov 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Height work safety &Control measures
  • Q2. Administrative control, Engineering control, legal control

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't Fear & Free to talk

I applied via Approached by company and was interviewed before Feb 2021. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. What is your current job experience?
  • Q2. Are you getting bed time in your job duration , if yes how managed those?
  • Q3. And other some site finishing related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - keep try to get entry in godrej
Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Salary, location jonlb
Round 3 - Technical 

(1 Question)

  • Q1. Work permit, checklist, hira , JSA

Kolte Patil Developers Interview FAQs

How many rounds are there in Kolte Patil Developers Assistant Manager - MEP interview?
Kolte Patil Developers interview process usually has 2 rounds. The most common rounds in the Kolte Patil Developers interview process are Resume Shortlist, One-on-one Round and HR.
What are the top questions asked in Kolte Patil Developers Assistant Manager - MEP interview?

Some of the top questions asked at the Kolte Patil Developers Assistant Manager - MEP interview -

  1. 1)Core technical base on site experience. 2) How to manage the project and manp...read more
  2. Technical ski...read more

Tell us how to improve this page.

Kolte Patil Developers Assistant Manager - MEP Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 127 Interviews
Lodha Group Interview Questions
4.0
 • 125 Interviews
DLF Interview Questions
3.9
 • 74 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Ashiana Housing Interview Questions
4.0
 • 29 Interviews
Sunteck Realty Interview Questions
3.3
 • 23 Interviews
View all

Kolte Patil Developers Assistant Manager - MEP Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

4.3

Salary

4.3

Job security

4.3

Company culture

4.3

Promotions

4.3

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
142 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Executive
106 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Sales Executive
68 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
36 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
33 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Kolte Patil Developers with

DLF

3.9
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview