Filter interviews by
I applied via Recruitment Consultant and was interviewed in Oct 2018. There were 3 interview rounds.
Pumps used for fire fighting have high capacities and are designed for quick water delivery.
Fire fighting pumps have high flow rates to quickly deliver water to extinguish fires.
Centrifugal pumps are commonly used for fire fighting due to their high capacity and efficiency.
The capacity of fire fighting pumps can range from a few hundred gallons per minute to thousands of gallons per minute.
These pumps are often powered...
I have extensive exposure to CS/MS pipeline construction and pipe welded joints.
I have worked on multiple CS/MS pipeline construction projects, overseeing the entire process from planning to execution.
I am well-versed in the various techniques and standards involved in pipe welded joints.
I have experience in conducting inspections and quality control checks to ensure the integrity of welded joints.
I have successfully m...
Basements typically have mechanical ventilation systems to ensure proper air circulation.
Basements often have exhaust fans or mechanical ventilation systems to remove stale air and moisture.
The ventilation system may include ductwork, fans, and vents to bring in fresh air from outside.
Some basements may also have windows or vents near the ceiling to allow natural ventilation.
Proper ventilation in basements is important...
The types of HVAC systems used for commercial buildings include central HVAC systems, rooftop units, variable refrigerant flow (VRF) systems, and chilled beam systems.
Central HVAC systems are commonly used in large commercial buildings and use a network of ducts to distribute conditioned air.
Rooftop units are self-contained HVAC systems that are installed on the roof of a building and provide heating and cooling.
Variab...
Seeking new challenges and growth opportunities in a dynamic work environment.
Looking for career advancement
Interested in taking on more responsibilities
Seeking a more challenging role
Want to work in a more dynamic and fast-paced environment
Yes, I am open to relocating to the Gulf if the opportunity aligns with my career goals.
I am open to considering relocation for the right career opportunity
I am willing to explore new experiences and challenges in a different location
I believe in adapting to new environments and cultures for personal and professional growth
Top trending discussions
posted on 30 Apr 2024
I applied via Company Website and was interviewed before Apr 2023. There were 2 interview rounds.
I applied via Job Portal and was interviewed in Mar 2022. There were 3 interview rounds.
MEP Execution standard and codes
I was interviewed in Jan 2025.
I applied via Approached by Company and was interviewed before Nov 2023. There was 1 interview round.
posted on 25 Mar 2023
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
The area of projects and types of projects I have worked on vary greatly.
I have worked on projects in various industries including construction, healthcare, and technology.
Types of projects I have worked on include software development, building construction, and medical equipment installation.
I am adaptable and able to quickly learn about new industries and project types.
I have experience working on both small and lar
posted on 4 Jan 2025
I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
Project management process involves initiating, planning, executing, monitoring, and closing a project.
Initiating: Define project scope, objectives, and stakeholders.
Planning: Create a detailed project plan, including timelines, resources, and budget.
Executing: Implement the project plan and manage resources effectively.
Monitoring: Track project progress, identify risks, and make necessary adjustments.
Closing: Finalize...
Risk management involves identifying, assessing, and prioritizing risks, as well as developing mitigation plans to minimize their impact.
Identify potential risks by conducting a thorough risk assessment
Assess the likelihood and impact of each risk on the project
Prioritize risks based on their severity and potential impact
Develop a mitigation plan for each identified risk, including strategies to minimize or eliminate t...
Long lead items can be tracked by creating a detailed schedule, monitoring progress regularly, and communicating with suppliers.
Create a detailed schedule outlining the delivery dates of long lead items
Regularly monitor the progress of long lead items to ensure they are on track
Communicate effectively with suppliers to address any delays or issues
Utilize project management software to track and manage long lead items
I applied via Approached by Company and was interviewed before Sep 2022. There were 3 interview rounds.
Some of the top questions asked at the Gar Corporation Assistant Manager - MEP interview -
Assistant Engineer - Civil
30
salaries
| ₹2.5 L/yr - ₹5 L/yr |
Assistant Engineer
18
salaries
| ₹3.5 L/yr - ₹4.8 L/yr |
Junior Engineer Civil
18
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Civil Site Engineer
15
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Assistant Manager
13
salaries
| ₹5 L/yr - ₹11.1 L/yr |
Tata Group
Reliance Industries
Adani Group
Bharti Enterprises