Filter interviews by
I applied via Naukri.com and was interviewed before May 2021. There were 2 interview rounds.
Technical Aptitude test (Besic Mechanical engineering Questions)
I was interviewed before Jan 2021.
Diploma
35 is a numerical value with no specific meaning in the context of construction engineering.
35 could refer to a measurement in inches or millimeters
35 could be a reference to a specific section or page in a construction manual
Without additional context, it is impossible to determine the meaning of 35 in construction engineering
The question is asking how much additional TMT is required for 600 MM columns with a diameter of 25 MM.
Calculate the cross-sectional area of the 600 MM column
Calculate the cross-sectional area of the 25 MM TMT
Subtract the area of the 25 MM TMT from the area of the 600 MM column
Divide the result by the area of the 25 MM TMT to get the length of additional TMT required
I applied via Recruitment Consulltant and was interviewed before Jul 2023. There was 1 interview round.
I have experience working with minor irrigation systems, including design, installation, and maintenance.
Designed irrigation systems for small-scale agricultural projects
Installed drip irrigation systems for gardens and landscaping
Performed routine maintenance on irrigation pumps and pipes
Troubleshooted and repaired irrigation system malfunctions
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
Planning for production involves creating a detailed schedule, coordinating resources, and optimizing efficiency.
Develop a production schedule to ensure timely delivery of products
Coordinate with different departments to allocate resources effectively
Optimize production processes to increase efficiency and reduce costs
posted on 23 Dec 2024
I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.
I have 8 years of experience in field surveying.
I have 8 years of experience in conducting field surveys for various projects.
I am proficient in using surveying equipment such as total stations and GPS devices.
I have experience in analyzing survey data and creating detailed reports.
I have worked on projects ranging from land development to infrastructure construction.
Yes, I have knowledge in DGPS and Total Station.
I have experience using DGPS for precise positioning in surveying and mapping.
I am familiar with Total Station equipment for measuring angles and distances in surveying.
I have used both DGPS and Total Station in various engineering projects.
I am proficient in data collection and analysis using DGPS and Total Station technology.
My current CTC per month is $10,000 and per year is $120,000.
Current CTC per month: $10,000
Current CTC per year: $120,000
Topography survey is a detailed mapping of the natural and man-made features of a piece of land.
Topography survey involves measuring and mapping the elevation, contours, and features of a land area.
It helps in understanding the terrain, drainage patterns, and existing structures on the land.
Topography surveys are essential for construction projects, land development, and environmental assessments.
Surveyors use speciali...
RL stands for Reinforcement Learning, a type of machine learning where an agent learns to make decisions by interacting with an environment.
RL involves an agent learning to take actions in an environment to maximize some notion of cumulative reward.
It is based on the idea of trial and error learning, where the agent learns from the consequences of its actions.
Examples of RL algorithms include Q-Learning, Deep Q Network
A KMZ file is a compressed version of a KML file used for displaying geographic data in Google Earth.
Create or download a KML file with geographic data
Compress the KML file using a tool like 7-Zip or WinZip
Change the file extension from .zip to .kmz
Open the KMZ file in Google Earth to view the geographic data
The Traverse is a method used in surveying and navigation to move through an area by taking a series of connected measurements and directions.
Traverse involves measuring distances and angles between points to create a connected path.
It is commonly used in land surveying, construction, and navigation.
Traverse can be closed or open depending on whether it returns to the starting point.
Example: A land surveyor uses a trav
Error distribution in a point can be achieved by considering the uncertainty in measurements and applying statistical methods.
Consider the uncertainty in measurements to determine the range of possible values for the point.
Apply statistical methods such as standard deviation to distribute the error around the point.
Use error propagation techniques to calculate the overall error in the point based on the errors in indiv
Total Station is a surveying instrument used for measuring angles and distances to accurately layout areas.
Set up the Total Station at a known point with a clear line of sight to the area to be surveyed.
Calibrate the instrument by leveling it and inputting the necessary parameters such as height and angle.
Measure distances and angles to various points in the area to create a detailed map or layout.
Use the data collecte...
I have 8 years of experience in Total Station, Auto level, Digital level, Theodolite, and Digital Theodolite.
8 years experience in Total Station, Auto level, Digital level, Theodolite, and Digital Theodolite.
Proficient in using all mentioned surveying instruments.
Experience in conducting precise measurements for various projects.
Skilled in data collection and analysis using these instruments.
Dumpy level, auto level, and digital level are all types of surveying instruments used for measuring horizontal and vertical levels.
Dumpy level is a basic surveying instrument with a telescope and bubble level for measuring horizontal and vertical angles.
Auto level is a more advanced version of a dumpy level that automatically adjusts the line of sight to be horizontal.
Digital level is a modern surveying instrument tha...
based on 7 reviews
Rating in categories
Assistant Manager
77
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
46
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata BlueScope Steel
Jindal Steel and Power
Everest Industries
Pennar Industries