Upload Button Icon Add office photos

Kirby Building Systems

Compare button icon Compare button icon Compare

Filter interviews by

Kirby Building Systems Construction Engineer Interview Questions and Answers for Experienced

Updated 19 May 2022

Kirby Building Systems Construction Engineer Interview Experiences for Experienced

1 interview found

I applied via Naukri.com and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Aptitude Test 

Technical Aptitude test (Besic Mechanical engineering Questions)

Round 2 - One-on-one 

(1 Question)

  • Q1. Fully on last project done by candidate

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep updating there last company & also base on your experience.

Interview questions from similar companies

I was interviewed before Jan 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 3 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 4 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 5 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. Any questions hr team
  • Ans. My contact no not any time network area ple msg me
  • Answered Anonymously
Round 6 - Case Study 

Diploma

Round 7 - HR 

(1 Question)

  • Q1. What are your salary expectations?
Round 8 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 9 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 10 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be honest with your years of experience. All information you share will be verified at the time of joining.
View all tips
Round 11 - Resume Shortlist 
Pro Tip by AmbitionBox:
Avoid using too much corporate jargon in your CV. Sometimes keeping things simple will get your job done.
View all tips

Interview Preparation Tips

Interview preparation tips for other job seekers - I am civil engginer my experience hydro, irrigation tunnel, rvnl tunnel

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

Interview Questionnaire 

3 Questions

  • Q1. What work do u know, us how many take in 1M3.
  • Q2. How does 35 means?
  • Ans. 

    35 is a numerical value with no specific meaning in the context of construction engineering.

    • 35 could refer to a measurement in inches or millimeters

    • 35 could be a reference to a specific section or page in a construction manual

    • Without additional context, it is impossible to determine the meaning of 35 in construction engineering

  • Answered by AI
  • Q3. The 600 MM COLUMNS has a of 25 MM, how much is given to add second tmt
  • Ans. 

    The question is asking how much additional TMT is required for 600 MM columns with a diameter of 25 MM.

    • Calculate the cross-sectional area of the 600 MM column

    • Calculate the cross-sectional area of the 25 MM TMT

    • Subtract the area of the 25 MM TMT from the area of the 600 MM column

    • Divide the result by the area of the 25 MM TMT to get the length of additional TMT required

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. 470 bricks per m3
2. 35.31*30.48= 1065=1 m3
3. 600 MM beams 25*50=1250

Interview Questionnaire 

5 Questions

  • Q1. Seismic design of building, criteria, type of checks in building with respect to seismic, analysis approach
  • Q2. Pile and foundation detail, structural system in building, shear wall, dual system implications
  • Q3. Steel structure- Class of section, connection detail, slender member design criteria
  • Q4. Building irregularities type
  • Q5. Nature of scope of work performed, understanding of coordination approach, software knowledge
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Acquaintances with Minor irrigation systems
  • Ans. 

    I have experience working with minor irrigation systems, including design, installation, and maintenance.

    • Designed irrigation systems for small-scale agricultural projects

    • Installed drip irrigation systems for gardens and landscaping

    • Performed routine maintenance on irrigation pumps and pipes

    • Troubleshooted and repaired irrigation system malfunctions

  • Answered by AI
  • Q2. QA and QC related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Whate are different bus bar schemes?
  • Ans. 

    Bus bar schemes are different ways of connecting bus bars in power systems.

    • Single bus bar scheme

    • Double bus bar scheme

    • Main and transfer bus bar scheme

    • Ring bus bar scheme

    • Breaker and a half scheme

    • Mesh bus bar scheme

  • Answered by AI
  • Q2. What are the equipment sequence for any line bay?
  • Ans. 

    The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.

    • The circuit breaker is the first equipment in the sequence.

    • Next comes the isolator switch.

    • After that, the earth switch is operated.

    • Then the line disconnector is opened.

    • Finally, the transformer is disconnected from the line.

    • The sequence is reversed when the line bay is put back into service.

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What you want to leave your current organization?
  • Q2. Are you comfortable to relocate to another city?

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be prepare about possible questions and be confident while giving interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About your self. About casting yard. About Methodology of casting of different structures. About site progress planning and time cycle of progress. This process is for 30-40 minutes.
Round 3 - HR 

(1 Question)

  • Q1. Details of my Education and experience. Salary negotiation and finalization of joining.

Interview Preparation Tips

Topics to prepare for AECOM Senior Engineer interview:
  • Civil Construction
  • IS Code
  • Your expertise area
Interview preparation tips for other job seekers - Prepare before going to attend an interview on all subject not only in your expertise area.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. What’s your strength
  • Q2. What’s your weakness
  • Q3. Planning for production
  • Ans. 

    Planning for production involves creating a detailed schedule, coordinating resources, and optimizing efficiency.

    • Develop a production schedule to ensure timely delivery of products

    • Coordinate with different departments to allocate resources effectively

    • Optimize production processes to increase efficiency and reduce costs

  • Answered by AI
  • Q4. Shop floor manpower handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Good interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. How many years experience in field survey?
  • Ans. 

    I have 8 years of experience in field surveying.

    • I have 8 years of experience in conducting field surveys for various projects.

    • I am proficient in using surveying equipment such as total stations and GPS devices.

    • I have experience in analyzing survey data and creating detailed reports.

    • I have worked on projects ranging from land development to infrastructure construction.

  • Answered by AI
  • Q2. Do you have any Knowledge in DGPS and Total Station
  • Ans. 

    Yes, I have knowledge in DGPS and Total Station.

    • I have experience using DGPS for precise positioning in surveying and mapping.

    • I am familiar with Total Station equipment for measuring angles and distances in surveying.

    • I have used both DGPS and Total Station in various engineering projects.

    • I am proficient in data collection and analysis using DGPS and Total Station technology.

  • Answered by AI
  • Q3. What is your current CTC per month and year
  • Ans. 

    My current CTC per month is $10,000 and per year is $120,000.

    • Current CTC per month: $10,000

    • Current CTC per year: $120,000

  • Answered by AI
Round 2 - Technical 

(8 Questions)

  • Q1. What is the Definition of Topography Survey ? And Explain it!
  • Ans. 

    Topography survey is a detailed mapping of the natural and man-made features of a piece of land.

    • Topography survey involves measuring and mapping the elevation, contours, and features of a land area.

    • It helps in understanding the terrain, drainage patterns, and existing structures on the land.

    • Topography surveys are essential for construction projects, land development, and environmental assessments.

    • Surveyors use speciali...

  • Answered by AI
  • Q2. What is RL?
  • Ans. 

    RL stands for Reinforcement Learning, a type of machine learning where an agent learns to make decisions by interacting with an environment.

    • RL involves an agent learning to take actions in an environment to maximize some notion of cumulative reward.

    • It is based on the idea of trial and error learning, where the agent learns from the consequences of its actions.

    • Examples of RL algorithms include Q-Learning, Deep Q Network

  • Answered by AI
  • Q3. How to prepare google KMZ file? And Explain it!
  • Ans. 

    A KMZ file is a compressed version of a KML file used for displaying geographic data in Google Earth.

    • Create or download a KML file with geographic data

    • Compress the KML file using a tool like 7-Zip or WinZip

    • Change the file extension from .zip to .kmz

    • Open the KMZ file in Google Earth to view the geographic data

  • Answered by AI
  • Q4. What is the Traverse?
  • Ans. 

    The Traverse is a method used in surveying and navigation to move through an area by taking a series of connected measurements and directions.

    • Traverse involves measuring distances and angles between points to create a connected path.

    • It is commonly used in land surveying, construction, and navigation.

    • Traverse can be closed or open depending on whether it returns to the starting point.

    • Example: A land surveyor uses a trav

  • Answered by AI
  • Q5. How to distribute an error in any Point?
  • Ans. 

    Error distribution in a point can be achieved by considering the uncertainty in measurements and applying statistical methods.

    • Consider the uncertainty in measurements to determine the range of possible values for the point.

    • Apply statistical methods such as standard deviation to distribute the error around the point.

    • Use error propagation techniques to calculate the overall error in the point based on the errors in indiv

  • Answered by AI
  • Q6. How to work the Total Station? And how to layout any area by Total Station it explain!
  • Ans. 

    Total Station is a surveying instrument used for measuring angles and distances to accurately layout areas.

    • Set up the Total Station at a known point with a clear line of sight to the area to be surveyed.

    • Calibrate the instrument by leveling it and inputting the necessary parameters such as height and angle.

    • Measure distances and angles to various points in the area to create a detailed map or layout.

    • Use the data collecte...

  • Answered by AI
  • Q7. How many years experience in Total Station, Auto level,Digital level, and Theodolite, and Digital Theodolite?
  • Ans. 

    I have 8 years of experience in Total Station, Auto level, Digital level, Theodolite, and Digital Theodolite.

    • 8 years experience in Total Station, Auto level, Digital level, Theodolite, and Digital Theodolite.

    • Proficient in using all mentioned surveying instruments.

    • Experience in conducting precise measurements for various projects.

    • Skilled in data collection and analysis using these instruments.

  • Answered by AI
  • Q8. What is difference in Dumpy level, auto level, and digital level?
  • Ans. 

    Dumpy level, auto level, and digital level are all types of surveying instruments used for measuring horizontal and vertical levels.

    • Dumpy level is a basic surveying instrument with a telescope and bubble level for measuring horizontal and vertical angles.

    • Auto level is a more advanced version of a dumpy level that automatically adjusts the line of sight to be horizontal.

    • Digital level is a modern surveying instrument tha...

  • Answered by AI

Kirby Building Systems Interview FAQs

How many rounds are there in Kirby Building Systems Construction Engineer interview for experienced candidates?
Kirby Building Systems interview process for experienced candidates usually has 2 rounds. The most common rounds in the Kirby Building Systems interview process for experienced candidates are Aptitude Test and One-on-one Round.
How to prepare for Kirby Building Systems Construction Engineer interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Kirby Building Systems. The most common topics and skills that interviewers at Kirby Building Systems expect are PEB, Pre Engineered Building, Civil Engineering, Civil Works and Construction Engineering.

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 822 Interviews
AECOM Interview Questions
4.2
 • 115 Interviews
AtkinsRealis Interview Questions
4.0
 • 87 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.1
 • 60 Interviews
Saipem Interview Questions
4.1
 • 45 Interviews
View all
Kirby Building Systems Construction Engineer Salary
based on 26 salaries
₹3.8 L/yr - ₹9 L/yr
7% less than the average Construction Engineer Salary in India
View more details

Kirby Building Systems Construction Engineer Reviews and Ratings

based on 7 reviews

4.2/5

Rating in categories

4.3

Skill development

4.2

Work-life balance

4.0

Salary

4.6

Job security

4.4

Company culture

3.4

Promotions

4.1

Work satisfaction

Explore 7 Reviews and Ratings
Assistant Manager
77 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Design Engineer
46 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
45 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Production Engineer
41 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Officer
41 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Kirby Building Systems with

Tata BlueScope Steel

3.7
Compare

Jindal Steel and Power

3.9
Compare

Everest Industries

4.0
Compare

Pennar Industries

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview