Delay analysis methods are used to determine the causes and impacts of project delays.
There are various methods of delay analysis such as Critical Path Method (CPM), Time Impact Analysis (TIA), Impacted As-Planned, and As-Built.
Each method has its own advantages and limitations, and the choice of method depends on the specific circumstances of the project.
CPM is a commonly used method that analyzes the project schedule...
Primavera P6 is a project management software used for planning, scheduling, and controlling projects.
Primavera P6 is widely used in industries such as construction, engineering, and manufacturing.
It allows users to create project schedules, allocate resources, track progress, and analyze project performance.
The software helps in optimizing project plans, identifying critical paths, and managing project risks.
Users can...
posted on 8 Apr 2024
posted on 15 Jun 2022
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 22 Jan 2025
I was interviewed in Dec 2024.
Primavera P6 is a project management software used for planning, scheduling, and controlling projects.
Primavera P6 is widely used in industries such as construction, engineering, and manufacturing.
It allows users to create project schedules, allocate resources, track progress, and analyze project performance.
The software helps in optimizing project plans, identifying critical paths, and managing project risks.
Users can...
posted on 8 Apr 2024
posted on 15 Jun 2022
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 23 Apr 2024
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Delay analysis methods are used to determine the causes and impacts of project delays.
There are various methods of delay analysis such as Critical Path Method (CPM), Time Impact Analysis (TIA), Impacted As-Planned, and As-Built.
Each method has its own advantages and limitations, and the choice of method depends on the specific circumstances of the project.
CPM is a commonly used method that analyzes the project schedule...
Some of the top questions asked at the Khatib & Alami Planning Engineer interview -
based on 1 interview
Interview experience
Design Engineer
37
salaries
| ₹6.5 L/yr - ₹12.2 L/yr |
Design Architect
35
salaries
| ₹6.6 L/yr - ₹12.3 L/yr |
Architect
34
salaries
| ₹3.8 L/yr - ₹9 L/yr |
Senior Engineer
23
salaries
| ₹11 L/yr - ₹17 L/yr |
Engineer
18
salaries
| ₹3.6 L/yr - ₹7.8 L/yr |
TCS
Infosys
Wipro
HCLTech