Upload Button Icon Add office photos

Filter interviews by

Khansaheb Civil Engineering LLC Assistant Construction Manager Interview Questions and Answers

Updated 24 Aug 2023

Khansaheb Civil Engineering LLC Assistant Construction Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Experience and technical questions
  • Q2. How to execute the work at site
  • Ans. 

    To execute work at site, proper planning, coordination, supervision, and communication are essential.

    • Develop a detailed project plan outlining tasks, timelines, and resources.

    • Coordinate with subcontractors, suppliers, and other stakeholders to ensure timely delivery of materials and services.

    • Supervise work progress on site to ensure quality and safety standards are met.

    • Communicate effectively with the project team to a...

  • Answered by AI
  • Q3. Site management and safety

Interview Preparation Tips

Interview preparation tips for other job seekers - To grow with the organisation

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Walk-in and was interviewed before Aug 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

Just Aptitude things

Round 2 - Technical 

(3 Questions)

  • Q1. What was your working area? I mean How big.
  • Ans. 

    My working area varied depending on the project, but typically ranged from 10,000 to 100,000 square feet.

    • My working area was determined by the size and scope of the construction project.

    • I have worked on projects ranging from small commercial buildings to large industrial facilities.

    • For example, one project I worked on was a 50,000 square foot warehouse.

    • Another project was a 100,000 square foot manufacturing plant.

    • I am ...

  • Answered by AI
  • Q2. What are the difficulties you faced?
  • Q3. In a Case, If 12mm dia rebar in your drawing and spacing is 150 mm. In case you are not having it at that time and you have to change it with 16 mm. what would be the spacing according 16 mm dia rebar?
  • Ans. 

    Spacing for 16mm dia rebar if 12mm dia rebar is not available.

    • Calculate the area of 12mm dia rebar and 16mm dia rebar.

    • Use the ratio of areas to find the spacing for 16mm dia rebar.

    • Spacing for 16mm dia rebar would be approximately 211 mm.

    • Ensure that the new spacing meets the required design standards.

  • Answered by AI
Round 3 - HR 

(3 Questions)

  • Q1. Why you want to switch?
  • Q2. Are you willing to relocate?
  • Q3. And salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - L&t is one of very big company in construction filed in india. Your working experiences will vary to one project to another. it all about project manager - How is your relation buildup with him?

I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. None? better opportunities available?
  • Q2. Many. Mostly Guld country

Interview Preparation Tips

Interview preparation tips for other job seekers - Avoid the firm. Poor management trying to salvage the company by treating employees like merchandise to be used until broken.

I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Civil work regarding
  • Q2. I am ready for civil and structural.

Interview Preparation Tips

Interview preparation tips for other job seekers - Presently I' m working in ahluwalia contract India limited. I am working there in dental now. When are u calling me for interview , I am ready for interview.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jan 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is the process of developing an erection plan?
  • Ans. 

    Developing an erection plan involves creating a detailed strategy for the construction process.

    • Identify project requirements and objectives

    • Create a timeline for completion

    • Allocate resources and manpower

    • Coordinate with subcontractors and suppliers

    • Ensure compliance with building codes and regulations

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm and focused towars your goal

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Salary negotiation
  • Q2. Job specific questions
  • Q3. Job specific questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and give to the point answers. Most of the questions will be from your expertise only.

I applied via Job Portal

Round 1 - One-on-one 

(1 Question)

  • Q1. Brief description on maintenance schedule.
  • Ans. 

    Maintenance schedule is a plan for regular upkeep of equipment or facilities to ensure their optimal performance.

    • Maintenance schedule includes regular inspections, cleaning, lubrication, and replacement of parts as needed.

    • It helps prevent breakdowns, prolongs equipment life, and reduces repair costs.

    • Examples of maintenance schedules include daily, weekly, monthly, and annual checklists.

    • Maintenance schedules should be t...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Technical specifications regarding excavator.

Interview Preparation Tips

Interview preparation tips for other job seekers - Best wishes for their future endeavours.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Tell me how to work your last company.
  • Q2. Pipe laying procedure.
  • Ans. 

    Pipe laying procedure involves planning, excavation, laying the pipe, backfilling, and testing for leaks.

    • Plan the layout of the pipes based on the project requirements and specifications.

    • Excavate the trench to the required depth and width to accommodate the pipe.

    • Lay the pipes carefully in the trench, ensuring proper alignment and slope for efficient flow.

    • Backfill the trench with suitable material to provide support and...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - HR 

(4 Questions)

  • Q1. Educational background
  • Q2. Previous organization with roles & responsibilities over there
  • Ans. 

    I worked at XYZ Construction as a Project Engineer, where I managed subcontractors, created project schedules, and ensured quality control.

    • Managed subcontractors to ensure timely completion of projects

    • Created and maintained project schedules to track progress

    • Ensured quality control measures were implemented throughout the construction process

  • Answered by AI
  • Q3. Pay scale
  • Q4. Expectation
Round 2 - Technical 

(3 Questions)

  • Q1. Present project details with respect of cost, time and specifications
  • Q2. Structural detailes, bridge elements and size & shape
  • Q3. Material specifications and requirement
  • Ans. 

    Material specifications and requirements are essential for ensuring quality and compliance in construction projects.

    • Material specifications outline the quality, type, and quantity of materials required for a project.

    • Requirements may include specific brands, sizes, grades, and certifications for materials.

    • Compliance with building codes and regulations is crucial when determining material specifications.

    • Examples of mater...

  • Answered by AI
Round 3 - Technical 

(3 Questions)

  • Q1. Planning, time cycles for various activities like shattering, reinforcement, inspection and concreting.
  • Q2. Details about steel reinforcement and specifications.
  • Q3. Manpower requirement and productivity.

Interview Preparation Tips

Interview preparation tips for other job seekers - Candidate should well know the project cost, completion timeline, project specifications, structural details, technical knowledge of construction materials and techniques.

Khansaheb Civil Engineering LLC Interview FAQs

How many rounds are there in Khansaheb Civil Engineering LLC Assistant Construction Manager interview?
Khansaheb Civil Engineering LLC interview process usually has 2 rounds. The most common rounds in the Khansaheb Civil Engineering LLC interview process are One-on-one Round and Resume Shortlist.
What are the top questions asked in Khansaheb Civil Engineering LLC Assistant Construction Manager interview?

Some of the top questions asked at the Khansaheb Civil Engineering LLC Assistant Construction Manager interview -

  1. How to execute the work at s...read more
  2. Experience and technical questi...read more
  3. Site management and saf...read more

Tell us how to improve this page.

Khansaheb Civil Engineering LLC Assistant Construction Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 757 Interviews
AECOM Interview Questions
4.2
 • 118 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 60 Interviews
View all
Document Controller
5 salaries
unlock blur

₹3.1 L/yr - ₹13.1 L/yr

Administrator
5 salaries
unlock blur

₹0.9 L/yr - ₹9.7 L/yr

Construction Management
4 salaries
unlock blur

₹18 L/yr - ₹45.8 L/yr

Electrician
4 salaries
unlock blur

₹3 L/yr - ₹5.3 L/yr

Electrical Technician
4 salaries
unlock blur

₹0.6 L/yr - ₹9.5 L/yr

Explore more salaries
Compare Khansaheb Civil Engineering LLC with

L&T Construction

4.0
Compare

AECOM

4.2
Compare

AtkinsRealis

3.9
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview