Material market rate varies depending on the type of material and market demand.
Material market rate is influenced by supply and demand
The type of material affects its market rate
Market rates can fluctuate over time
Factors such as production costs and availability can also impact market rates
Top trending discussions
Concrete pouring method involves the process of placing and compacting concrete into a formwork to create a solid structure.
Ensure formwork is properly prepared and secured before pouring concrete
Use appropriate equipment such as concrete pumps or buckets for pouring
Monitor concrete flow and consistency to avoid segregation or honeycombing
Properly compact the concrete to remove air voids and ensure strength
Allow suffic...
Shuttering of columns is the process of creating temporary formwork to support concrete until it sets.
Shuttering is usually made of plywood, timber, or steel.
It is important to ensure the shuttering is properly supported and aligned before pouring concrete.
The shuttering should be removed after the concrete has set to the required strength.
Properly designed and constructed shuttering helps in achieving a smooth and uni
Tiles can be placed using various methods such as grid layout, random pattern, or specific design layout.
Tiles can be placed in a grid layout for a uniform and organized look.
Random pattern placement can create a more eclectic and unique design.
Specific design layout involves placing tiles according to a pre-determined pattern or design.
Consider factors like tile size, shape, color, and grout spacing when deciding on t
The flooring method for stone work typically involves using mortar or adhesive to secure the stones in place.
Prepare the subfloor by ensuring it is clean, level, and dry
Apply mortar or adhesive to the back of each stone before placing it on the subfloor
Use spacers to maintain consistent spacing between stones
Allow the mortar or adhesive to dry completely before grouting the joints
Seal the finished stone floor to protec
Concrete pouring method involves the process of placing and compacting concrete into a formwork to create a solid structure.
Ensure formwork is properly prepared and secured before pouring concrete
Use appropriate equipment such as concrete pumps or buckets for pouring
Monitor concrete flow and consistency to avoid segregation or honeycombing
Properly compact the concrete to remove air voids and ensure strength
Allow suffic...
Shuttering of columns is the process of creating temporary formwork to support concrete until it sets.
Shuttering is usually made of plywood, timber, or steel.
It is important to ensure the shuttering is properly supported and aligned before pouring concrete.
The shuttering should be removed after the concrete has set to the required strength.
Properly designed and constructed shuttering helps in achieving a smooth and uni
Tiles can be placed using various methods such as grid layout, random pattern, or specific design layout.
Tiles can be placed in a grid layout for a uniform and organized look.
Random pattern placement can create a more eclectic and unique design.
Specific design layout involves placing tiles according to a pre-determined pattern or design.
Consider factors like tile size, shape, color, and grout spacing when deciding on t
The flooring method for stone work typically involves using mortar or adhesive to secure the stones in place.
Prepare the subfloor by ensuring it is clean, level, and dry
Apply mortar or adhesive to the back of each stone before placing it on the subfloor
Use spacers to maintain consistent spacing between stones
Allow the mortar or adhesive to dry completely before grouting the joints
Seal the finished stone floor to protec
posted on 16 May 2024
I applied via LinkedIn and was interviewed in Nov 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in May 2023. There were 2 interview rounds.
Hypothetical Project will given to find the project estimate and schedule
I applied via Naukri.com and was interviewed before Jul 2021. There were 4 interview rounds.
I applied via Referral and was interviewed in Apr 2021. There was 1 interview round.
Cycle time of rock classes varies based on their hardness and strength.
Rock classes can be categorized based on their geological properties.
Harder and stronger rocks take longer to drill and excavate.
Examples of rock classes include granite, limestone, and sandstone.
Cycle time can also be affected by the type of equipment used and the skill level of workers.
Account Assistant
5
salaries
| ₹1.8 L/yr - ₹2.1 L/yr |
CRM Executive
5
salaries
| ₹1.2 L/yr - ₹4 L/yr |
Senior Accounts Executive
5
salaries
| ₹3.6 L/yr - ₹4.1 L/yr |
Accounts Manager
5
salaries
| ₹7.8 L/yr - ₹14 L/yr |
Sales Manager
5
salaries
| ₹4.2 L/yr - ₹5.5 L/yr |
Prestige Group
Sobha
Godrej Properties
DLF