I applied via Approached by Company and was interviewed in May 2024. There were 2 interview rounds.
The deduction criteria for shuttering include damaged or lost materials, excess materials, and improper installation.
Deductions are made for damaged or lost shuttering materials.
Excess materials beyond the required quantity may also lead to deductions.
Improper installation of shuttering can result in deductions as well.
Yes, I created an extra item to improve efficiency and accuracy in billing process.
Created a new template for billing reports to streamline the process
Developed a customized software tool to automate calculations and reduce errors
Introduced a new coding system to categorize items for easier tracking and invoicing
Yes, I have used DSR (Detailed Specified Rates) in my previous projects for accurate billing calculations.
Yes, I have used DSR to calculate the cost of materials, labor, and equipment for billing purposes.
DSR helps in providing a detailed breakdown of rates for different items used in construction projects.
Using DSR ensures transparency and accuracy in billing calculations.
For example, I used DSR to calculate the cost ...
Escalation in billing refers to the increase in costs due to various factors. Components include labor, materials, equipment, overhead, and profit.
Escalation refers to the increase in costs of a project over time.
Components of escalation include labor costs, material costs, equipment costs, overhead costs, and profit margins.
Labor costs can escalate due to increases in wages or labor shortages.
Material costs can escala...
One way slab is supported on two opposite sides while two way slab is supported on all four sides.
One way slab is designed to span in only one direction, supported on two opposite sides.
Two way slab is designed to span in both directions, supported on all four sides.
One way slab is commonly used in residential buildings, while two way slab is used in commercial buildings.
Examples of one way slab include balconies and v...
Short column is a column with a height less than 10 times its least lateral dimension, while long column is a column with a height more than 10 times its least lateral dimension.
Short column is prone to buckling due to its slenderness ratio.
Long column is less prone to buckling due to its higher slenderness ratio.
Short column is commonly used in residential buildings.
Long column is commonly used in high-rise buildings.
Yes, I have experience in finishing items in previous projects.
I have experience in coordinating with subcontractors to ensure timely completion of finishing work.
I have knowledge of different finishing materials and techniques such as painting, tiling, and flooring.
I have successfully managed finishing schedules to meet project deadlines.
I have experience in quality control to ensure finishing work meets project speci
Built-up area includes the carpet area plus the thickness of the walls, while super built-up area includes common spaces like lobby, staircase, etc.
Built-up area = Carpet area + thickness of walls
Super built-up area = Built-up area + common spaces like lobby, staircase, etc.
Built-up area is the area enclosed within the walls of a building, while super built-up area includes common areas shared by multiple units.
Super b...
Escalation rates are typically obtained from historical data, industry standards, and consultation with relevant stakeholders.
Escalation rates can be obtained from historical project data, analyzing past projects to determine trends in cost escalation.
Industry standards and benchmarks can also be used to determine escalation rates for different types of projects.
Consultation with relevant stakeholders such as suppliers...
The process for building works involves planning, design, construction, and maintenance.
Initial planning stage involves site selection, feasibility studies, and obtaining necessary permits.
Design phase includes creating blueprints, structural analysis, and ensuring compliance with building codes.
Construction phase involves site preparation, foundation laying, building erection, and finishing works.
Maintenance phase inc...
The process for building works involves planning, designing, obtaining permits, construction, and inspection.
Develop a detailed project plan outlining scope, budget, and timeline
Design the structure or infrastructure using engineering principles
Obtain necessary permits and approvals from local authorities
Construct the project according to the approved plans and specifications
Conduct regular inspections to ensure qualit
posted on 23 Oct 2021
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 10 Sep 2020
I applied via Company Website and was interviewed in Aug 2020. There were 3 interview rounds.
Connecting to a database has multiple options depending on the type of database and programming language used.
For SQL databases, options include using JDBC for Java, ODBC for C++, and ADO.NET for C#.
For NoSQL databases, options include using MongoDB's driver for Python or Node.js.
ORMs like Hibernate and Entity Framework can also be used to abstract away the database connection details.
Connection strings are used to spe...
posted on 25 Mar 2022
I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.
posted on 2 May 2021
posted on 10 May 2022
I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.
Piping code and welder qualifications test
Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.
Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.
Both piping code and welder qualifications test are important in ensu...
I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
Quant, verbal, lrdi
posted on 6 Oct 2021
I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.
posted on 18 Oct 2021
I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 10 reviews
Rating in categories
Senior MIS Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Billing Engineer
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group