Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Kent plc Team. If you also belong to the team, you can get access from here

Kent plc Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Kent plc Interview Questions and Answers

Updated 8 Jul 2025
Popular Designations

26 Interview questions

A Project Document Controller was asked 6d ago
Q. Which software have you used for document control at Saudi Aramco?
Ans. 

In Saudi Aramco, various software tools are utilized for effective document control, ensuring compliance and efficiency.

  • SAP Document Management System (DMS) for managing project documents.

  • SharePoint for collaboration and document sharing among teams.

  • Aconex for project management and document control in construction projects.

  • Oracle Primavera for scheduling and document tracking.

View all Project Document Controller interview questions
A Project Document Controller was asked 6d ago
Q. Do you have any knowledge about EDMS?
Ans. 

Yes, I have knowledge about EDMS, which is essential for managing project documents efficiently.

  • EDMS stands for Electronic Document Management System, used to store, manage, and track electronic documents.

  • It helps in version control, ensuring that the latest document is always accessible.

  • Examples of EDMS include SharePoint, Documentum, and OpenText.

  • EDMS facilitates collaboration among team members by allowing simu...

View all Project Document Controller interview questions
A Project Document Controller was asked 6d ago
Q. How do you control the revision of technical drawings?
Ans. 

I control revision of technical drawings through systematic tracking, version control, and clear communication with stakeholders.

  • Implement a version control system to track changes and revisions.

  • Use a standardized naming convention for files (e.g., DrawingName_v1.0).

  • Maintain a revision history log that details changes made, dates, and responsible personnel.

  • Ensure all stakeholders are notified of revisions and have...

View all Project Document Controller interview questions
A Piping Stress Engineer was asked 2mo ago
Q. What are the different types of supports and approximate support distances used in piping stress analysis?
Ans. 

Support types in piping systems include various configurations to manage stress and displacement, with distances varying by application.

  • Types of supports include: fixed supports, spring supports, and sliding supports.

  • Fixed supports restrict all movement and are typically placed every 10-15 feet.

  • Spring supports allow for vertical movement and are used in areas with thermal expansion.

  • Sliding supports permit horizont...

View all Piping Stress Engineer interview questions
An Instrumentation Technician was asked 3mo ago
Q. What is the procedure for filling a wet leg?
Ans. 

Wet leg filling involves filling a differential pressure transmitter's wet leg with liquid for accurate measurement.

  • Identify the wet leg location and ensure safety protocols are followed.

  • Use a suitable filling liquid, typically water or a specific process fluid.

  • Connect a filling line to the wet leg and open the valve to allow liquid flow.

  • Monitor the filling process to avoid overfilling and ensure proper liquid lev...

View all Instrumentation Technician interview questions
A Pipe Fitter and Fabricator was asked 5mo ago
Q. How do you perform fabrication according to ISO drawings?
Ans. 

Fabrication as per ISO drawing involves following the dimensions, tolerances, and specifications provided in the drawing.

  • Carefully study the ISO drawing to understand the dimensions and specifications required for fabrication.

  • Use appropriate tools and equipment to cut, shape, and assemble the materials according to the drawing.

  • Ensure that the final product meets the tolerances and quality standards specified in th...

View all Pipe Fitter and Fabricator interview questions
A Safety Officer was asked 9mo ago
Q. How do you solve problems?
Ans. 

I solve problems by analyzing the root cause, developing a plan of action, and implementing solutions effectively.

  • Identify the problem and gather relevant information

  • Analyze the root cause of the issue

  • Develop a plan of action to address the problem

  • Implement solutions effectively

  • Monitor and evaluate the effectiveness of the solutions

View all Safety Officer interview questions
Are these interview questions helpful?
A Safety Officer was asked 9mo ago
Q. Who approves and signs the Safety policy?
Ans. 

The Safety policy is approved and signed by top management.

  • Safety policy is approved and signed by top management or senior leadership.

  • Typically, the CEO, Managing Director, or equivalent high-ranking official signs the Safety policy.

  • The Safety Officer may be responsible for drafting the policy and ensuring it aligns with regulations and best practices.

View all Safety Officer interview questions
A Safety Officer was asked 9mo ago
Q. Who is responsible for safety?
Ans. 

Everyone in the workplace is responsible for safety, from management to employees.

  • Management is responsible for providing a safe work environment and enforcing safety policies.

  • Employees are responsible for following safety procedures and reporting any hazards or incidents.

  • Safety officers are responsible for conducting safety inspections, training employees, and ensuring compliance with regulations.

View all Safety Officer interview questions
A Senior Engineering Project Manager was asked 12mo ago
Q. What are the various interfaces in Engineering projects?
Ans. 

Interfaces in engineering projects refer to the points where different components or systems connect and interact with each other.

  • Interfaces between different engineering disciplines (e.g. mechanical, electrical, software)

  • Interfaces between different project stakeholders (e.g. clients, contractors, suppliers)

  • Interfaces between different project phases (e.g. design, procurement, construction)

  • Interfaces between diff...

View all Senior Engineering Project Manager interview questions

Kent plc Interview Experiences

24 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Walk-in

Round 1 - Assignment 

Prior to interview some

Round 2 - Assignment 

Prior to interview some assignment provided.

Round 3 - HR 

(4 Questions)

  • Q1. How much your salary expected?
  • Ans. 

    My salary expectation is based on my qualifications, experience, and the industry standard for Safety Officers.

    • Consider my qualifications and certifications in the field

    • Take into account my years of experience in safety management

    • Research the average salary range for Safety Officers in the industry

    • Negotiate based on the responsibilities and expectations of the role

  • Answered by AI
  • Q2. What you know about the company?
  • Ans. 

    The company is a leading construction firm specializing in infrastructure projects.

    • Specializes in infrastructure projects

    • Known for high safety standards

    • Has a strong track record of completing projects on time and within budget

  • Answered by AI
  • Q3. Who is Responsible for Safety?
  • Ans. 

    Everyone in the workplace is responsible for safety, from management to employees.

    • Management is responsible for providing a safe work environment and enforcing safety policies.

    • Employees are responsible for following safety procedures and reporting any hazards or incidents.

    • Safety officers are responsible for conducting safety inspections, training employees, and ensuring compliance with regulations.

  • Answered by AI
  • Q4. Who will approved and sign in Safety policy?
  • Ans. 

    The Safety policy is approved and signed by top management.

    • Safety policy is approved and signed by top management or senior leadership.

    • Typically, the CEO, Managing Director, or equivalent high-ranking official signs the Safety policy.

    • The Safety Officer may be responsible for drafting the policy and ensuring it aligns with regulations and best practices.

  • Answered by AI
Round 4 - Case Study 

Lesson learend event will be discussed

Round 5 - Group Discussion 

Once the interview completed group dicussion will be conducted for share the selection process.

Round 6 - One-on-one 

(2 Questions)

  • Q1. Did you have experience in safety training?
  • Ans. 

    Yes, I have extensive experience in safety training including conducting safety drills, developing safety protocols, and providing safety awareness training.

    • Conducted safety drills to prepare employees for emergencies

    • Developed safety protocols to ensure compliance with regulations

    • Provided safety awareness training to educate employees on potential hazards

    • Implemented safety measures to prevent accidents and injuries

  • Answered by AI
  • Q2. How you solve the problems?
  • Ans. 

    I solve problems by analyzing the root cause, developing a plan of action, and implementing solutions effectively.

    • Identify the problem and gather relevant information

    • Analyze the root cause of the issue

    • Develop a plan of action to address the problem

    • Implement solutions effectively

    • Monitor and evaluate the effectiveness of the solutions

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always answer shortly and meaningful

Interview Questions & Answers

user image Anonymous

posted on 3 Jan 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. For instruments fitter related
  • Q2. 5 and half years experience in kent plc
  • Q3. For instruments fitter
  • Q4. Instruments fitter
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Jul 2024, where I was asked the following questions.

  • Q1. What is the commissioning procedure and testing process?
  • Q2. What is the process for commissioning motor control centers (MCC) and circuit breakers?
  • Q3. What is the operation of High Tension (HT) breakers?

Project Document Controller Interview Questions & Answers

user image SHEKH SOINMAHMAD SAHBUDDIN

posted on 16 Jun 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jun 2024, where I was asked the following questions.

  • Q1. How u control revision of technical drawings?
  • Ans. 

    I control revision of technical drawings through systematic tracking, version control, and clear communication with stakeholders.

    • Implement a version control system to track changes and revisions.

    • Use a standardized naming convention for files (e.g., DrawingName_v1.0).

    • Maintain a revision history log that details changes made, dates, and responsible personnel.

    • Ensure all stakeholders are notified of revisions and have acce...

  • Answered by AI
  • Q2. Which software you are using for Document control in Saudi aramco?
  • Ans. 

    In Saudi Aramco, various software tools are utilized for effective document control, ensuring compliance and efficiency.

    • SAP Document Management System (DMS) for managing project documents.

    • SharePoint for collaboration and document sharing among teams.

    • Aconex for project management and document control in construction projects.

    • Oracle Primavera for scheduling and document tracking.

  • Answered by AI
  • Q3. Did you have any knowledge about EDMS?
  • Ans. 

    Yes, I have knowledge about EDMS, which is essential for managing project documents efficiently.

    • EDMS stands for Electronic Document Management System, used to store, manage, and track electronic documents.

    • It helps in version control, ensuring that the latest document is always accessible.

    • Examples of EDMS include SharePoint, Documentum, and OpenText.

    • EDMS facilitates collaboration among team members by allowing simultane...

  • Answered by AI
  • Q4. Which previous organization you work for?
  • Ans. 

    I previously worked at ABC Construction, where I managed project documentation and ensured compliance with industry standards.

    • Managed documentation for multiple large-scale construction projects, ensuring timely updates and accuracy.

    • Implemented a digital filing system that improved document retrieval time by 30%.

    • Collaborated with project managers and engineers to maintain compliance with regulatory requirements.

    • Conduct...

  • Answered by AI
  • Q5. In your previous organization how work flows?
  • Ans. 

    In my previous organization, workflows were structured to ensure efficient document management and collaboration across teams.

    • Document creation: Team members would draft documents using standardized templates to maintain consistency.

    • Review process: Documents were circulated for review among relevant stakeholders, ensuring feedback was incorporated.

    • Version control: We utilized a document management system to track revis...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is your job roles
  • Q2. How to manage your team
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11 KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV Switches gears,VCB,AC...
  • Ans. 

    Preventive and corrective maintenance of various electrical equipment including breakers, motors, transformers, and relays.

    • Perform regular maintenance on high and low voltage breakers, motors, and transformers.

    • Test and calibrate various protection relays for motors, transformers, and generators.

    • Conduct transformer oil BDV test, thermal scanning, and earth fault and prediction tests.

    • Terminate high voltage motors, instal...

  • Answered by AI
  • Q2. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11 KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV Switches gears,VCB,AC...
  • Ans. 

    Preventive and corrective maintenance of various electrical equipment including breakers, motors, transformers, and relays.

    • Perform regular maintenance tasks on high and low voltage breakers, motors, and transformers.

    • Test and calibrate protection relays for motors, transformers, and generators.

    • Conduct transformer oil BDV tests, thermal scanning, and earth fault and prediction tests.

    • Terminate high voltage motors, install...

  • Answered by AI
  • Q3. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11 KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV Switches gears,VCB,AC...
  • Ans. 

    Preventive and corrective maintenance of various electrical equipment including breakers, motors, transformers, switches, relays, and testing/calibration of protections.

    • Preventive maintenance of H.V & LV breakers, motors, transformers, switches, etc.

    • Corrective maintenance of HV/MV/LV switchgears, breakers, cubicles, etc.

    • Testing and calibration of various protection relays for motors, transformers, generators.

    • Transforme...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To 33 KV & 11
KV & 6.6.KV /2400 KW ,Transformer(15.75KV /230 KV ), Corrective Maintenance of HV/MV /LV
Switches gears,VCB,ACB,MOCB,SF6 Breakers, Breaker cubicle, earthling Switches ,Generator
earthling Switch ETC. Testing and calibration of all kinds of protections Relay of High Voltage and
low Voltage Motors, Transformers ,Generator like Under Voltage Relay , locked Rotor Relay
,Differential Relay , Negative Phase Sequence Relay , Over current/Thermal Over Current Relay ,
Bucholz Relay , DGPT Relay ETC. Transformer Oil BDV Test, Thermal Scanning , Earth fault and
Prediction Test of Equipment .Termination of high Voltage Motors , Cable Errection , Installation of
Motors, and Trial/Load Test. Transformer Oil Extracting ,Testing (BDV), Oil Filtration .
Equipments Of Oil & Gas Plant , Chlorine Plant, co2 plant
Maintenance of battery Banks , UPS for auxiliary Start UP and Control Voltage call safe supply.
EQUIPMENT UNDER RESPONSIBILITIES :
 MV MOTORS UPTO 2400 KW / 3 PHASE / 6600V / 60HZ
 LV MOTORS UPTO 125 KW / 3PHANSE / 380V / 60HZ
 RECTIFIER FOR CL2 PLANT CELL 3000 AMP / 380/60HZ / 120V DC
 TRANSFORMERS 15.75 KV / 230 KV – 150MVA
 TRANSFORMERS 15.75 KV / 6.6KV – 80 MVA
 TRANSFORMERS 6.6KV / 380V – 800KVA
 BATTERY BANKS 2000 AMP
 INVERTER / CHARGER 2000 AMP  SWITCH GEARS MV 6.6 KV / 3500 AMP SWITCH

Interview Questions & Answers

user image Anonymous

posted on 3 Jun 2023

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. 1.What is an inspection? 3.What are the responsibilities of the QC Inspector? 3.What is the various inspection requireds a quality control Inspector should be familiar with? 4.What should be th...
  • Q2. 1. What is the difference between inspection,witness,and hold point? 2. What are the different kinds of certification?
  • Q3. What are QCP, QMP and ITP?
  • Q4. What is the final RFI? when it shall be raised?
  • Q5. What is document marking? Brief it's color coding?

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. What are the various interfaces in Engineering projects?
  • Ans. 

    Interfaces in engineering projects refer to the points where different components or systems connect and interact with each other.

    • Interfaces between different engineering disciplines (e.g. mechanical, electrical, software)

    • Interfaces between different project stakeholders (e.g. clients, contractors, suppliers)

    • Interfaces between different project phases (e.g. design, procurement, construction)

    • Interfaces between different...

  • Answered by AI
  • Q2. Describe the projects that you have worked on.
  • Q3. What are the various standards used in the Oil & Gas Industry
  • Ans. 

    Various standards used in the Oil & Gas Industry include API, ASME, ISO, and NACE.

    • API (American Petroleum Institute) standards cover various aspects of the industry such as drilling, production, and transportation.

    • ASME (American Society of Mechanical Engineers) standards focus on equipment design and safety.

    • ISO (International Organization for Standardization) standards ensure quality and consistency in processes and pr...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Self Introduction
  • Q2. Current & Expected remuneration
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Behavioral and management related
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. E3D Draw Module

Top trending discussions

View All
Interview Tips & Stories
4d (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about Kent plc?
Ask anonymously on communities.

Kent plc Interview FAQs

How many rounds are there in Kent plc interview?
Kent plc interview process usually has 1-2 rounds. The most common rounds in the Kent plc interview process are Technical, Resume Shortlist and One-on-one Round.
How to prepare for Kent plc interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Kent plc. The most common topics and skills that interviewers at Kent plc expect are HTML, Recruitment, Refinery, Petrochemical and Consulting.
What are the top questions asked in Kent plc interview?

Some of the top questions asked at the Kent plc interview -

  1. Preventive Maintenance of All Kinds of H.V & LV Breakers, Motors, Voltage Up To...read more
  2. 1. During confined space job , what is the role of safety watch ? 2. Alignment ...read more
  3. When the 2 incomers is energized what is the status of bus ...read more
How long is the Kent plc interview process?

The duration of Kent plc interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.8/5

based on 17 interview experiences

Difficulty level

Easy 11%
Moderate 67%
Hard 22%

Duration

Less than 2 weeks 89%
2-4 weeks 11%
View more

Interview Questions from Similar Companies

Shell Interview Questions
4.0
 • 210 Interviews
Schlumberger Interview Questions
3.8
 • 145 Interviews
bp Interview Questions
3.8
 • 72 Interviews
ExxonMobil Interview Questions
3.8
 • 70 Interviews
Baker Hughes Interview Questions
4.0
 • 60 Interviews
Saudi Aramco Interview Questions
4.5
 • 56 Interviews
Torrent Gas Interview Questions
3.2
 • 54 Interviews
View all

Kent plc Reviews and Ratings

based on 286 reviews

4.2/5

Rating in categories

3.9

Skill development

4.1

Work-life balance

3.9

Salary

3.9

Job security

4.0

Company culture

3.6

Promotions

4.0

Work satisfaction

Explore 286 Reviews and Ratings
Instrument Engineer

Qatar

10-15 Yrs

Not Disclosed

Process/Mechanical Commissioning Engineer

Mumbai

3-8 Yrs

Not Disclosed

Systems Completions Database Administrator

Mumbai

7-12 Yrs

Not Disclosed

Explore more jobs
Process Engineer
20 salaries
unlock blur

₹5 L/yr - ₹12.5 L/yr

Electrical Engineer
13 salaries
unlock blur

₹10 L/yr - ₹20.9 L/yr

Instrumentation Technician
12 salaries
unlock blur

₹6.2 L/yr - ₹12 L/yr

Piping Engineer
9 salaries
unlock blur

₹6.8 L/yr - ₹13.5 L/yr

Principal Engineer
9 salaries
unlock blur

₹24 L/yr - ₹38.5 L/yr

Explore more salaries
Compare Kent plc with

Reliance Industries

4.0
Compare

Indian Oil Corporation

4.4
Compare

Shell

3.9
Compare

Oil And Natural Gas Corporation

4.3
Compare
write
Share an Interview