Filter interviews by
MSA stands for Measurement System Analysis. It is used to assess the capability of a measurement system to provide accurate and reliable results.
MSA helps in identifying sources of variation in measurement systems.
It ensures that the measurement system is capable of producing accurate and reliable results.
MSA includes studies like Gage R&R (Repeatability and Reproducibility) to assess measurement system variat...
Rejection can be controlled by implementing robust quality control measures and continuous improvement processes.
Implementing thorough quality control checks at every stage of production
Regularly reviewing and analyzing rejection data to identify root causes
Training employees on quality standards and best practices
Implementing corrective and preventive actions based on rejection trends
Collaborating with suppliers ...
Control plan specifies how to control a process, while Quality plan outlines the overall quality objectives and strategies.
Control plan focuses on process control methods and parameters
Quality plan outlines quality objectives, standards, and strategies
Control plan is more detailed and specific to the production process
Quality plan is more general and covers overall quality management
Both plans are essential for en...
Ovality in production engineering can be caused by factors such as improper tooling, material inconsistencies, and machine misalignment.
Improper tooling can lead to uneven pressure on the material, causing it to deform into an oval shape.
Material inconsistencies, such as variations in thickness or hardness, can result in non-uniform stretching during the production process.
Machine misalignment, where the equipment...
Shop floor can be managed effectively by implementing efficient production processes, ensuring proper communication, maintaining a clean and organized workspace, and prioritizing safety.
Implement efficient production processes to optimize workflow and minimize downtime.
Ensure proper communication among team members to avoid misunderstandings and delays.
Maintain a clean and organized workspace to improve efficiency...
Geometrical tolerance refers to the allowable variation in dimensions and form of a part, while theoretical tolerance is the ideal or perfect value for a dimension.
Geometrical tolerance allows for deviations in dimensions and form to ensure proper fit and function of parts.
Theoretical tolerance represents the ideal or perfect value for a dimension, with no allowance for variation.
Geometrical tolerance is specified...
MSA stands for Measurement System Analysis. It is used to assess the capability of a measurement system to provide accurate and reliable results.
MSA helps in identifying sources of variation in measurement systems.
It ensures that the measurement system is capable of producing accurate and reliable results.
MSA includes studies like Gage R&R (Repeatability and Reproducibility) to assess measurement system variation.
I...
Control plan specifies how to control a process, while Quality plan outlines the overall quality objectives and strategies.
Control plan focuses on process control methods and parameters
Quality plan outlines quality objectives, standards, and strategies
Control plan is more detailed and specific to the production process
Quality plan is more general and covers overall quality management
Both plans are essential for ensurin...
Rejection can be controlled by implementing robust quality control measures and continuous improvement processes.
Implementing thorough quality control checks at every stage of production
Regularly reviewing and analyzing rejection data to identify root causes
Training employees on quality standards and best practices
Implementing corrective and preventive actions based on rejection trends
Collaborating with suppliers to im...
I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
Shop floor can be managed effectively by implementing efficient production processes, ensuring proper communication, maintaining a clean and organized workspace, and prioritizing safety.
Implement efficient production processes to optimize workflow and minimize downtime.
Ensure proper communication among team members to avoid misunderstandings and delays.
Maintain a clean and organized workspace to improve efficiency and ...
Geometrical tolerance refers to the allowable variation in dimensions and form of a part, while theoretical tolerance is the ideal or perfect value for a dimension.
Geometrical tolerance allows for deviations in dimensions and form to ensure proper fit and function of parts.
Theoretical tolerance represents the ideal or perfect value for a dimension, with no allowance for variation.
Geometrical tolerance is specified usin...
Ovality in production engineering can be caused by factors such as improper tooling, material inconsistencies, and machine misalignment.
Improper tooling can lead to uneven pressure on the material, causing it to deform into an oval shape.
Material inconsistencies, such as variations in thickness or hardness, can result in non-uniform stretching during the production process.
Machine misalignment, where the equipment is n...
I applied via Walk-in and was interviewed in Jun 2023. There were 5 interview rounds.
I applied via Company Website and was interviewed in Mar 2021. There were 3 interview rounds.
I resigned to seek new challenges and opportunities for growth in my career as a Senior Quality Engineer.
Desire for professional growth: I wanted to take on more responsibilities and lead projects.
Seeking new challenges: I felt that I had reached a plateau in my previous role and wanted to explore new technologies.
Company culture: I was looking for a work environment that aligns more closely with my values and work sty...
Top trending discussions
I applied via Recruitment Consultant and was interviewed before Jan 2021. There was 1 interview round.
There are 5 levels in PPAP (Production Part Approval Process).
PPAP has 5 levels: Level 1, Level 2, Level 3, Level 4, and Level 5.
Each level represents a different stage of the PPAP process.
Level 1 includes documentation submission, while Level 5 involves customer approval.
The higher the level, the more comprehensive the PPAP requirements become.
PPAP is used to ensure that suppliers meet the quality standards of their c...
Cp measures the capability of a process to meet specifications, while Cpk measures the capability of a process to meet specifications considering centering.
Cp is a short-term capability index, while Cpk is a long-term capability index.
Cp considers only the spread of the process, while Cpk considers both the spread and the centering of the process.
Cp is calculated using the formula Cp = (USL - LSL) / (6 * standard devia...
CAPA stands for Corrective and Preventive Action. It is a systematic approach to identify, investigate, and resolve quality issues.
CAPA is a key component of quality management systems.
It involves identifying the root cause of a problem, implementing corrective actions to address the immediate issue, and preventive actions to prevent recurrence.
CAPA processes typically include steps like problem identification, investi...
Corrective action is taken to address and resolve existing problems, while preventive action is taken to prevent potential problems from occurring.
Corrective action focuses on addressing and resolving existing problems or nonconformities.
Preventive action focuses on identifying and eliminating potential problems before they occur.
Corrective action is reactive, while preventive action is proactive.
Corrective action aims...
I am a detail-oriented Quality Engineer with a passion for continuous improvement and problem-solving.
Detail-oriented with a focus on quality standards
Passionate about continuous improvement
Skilled in problem-solving and root cause analysis
The steps for demin wheels involve cleaning, inspecting, repairing, and testing.
Clean the wheels thoroughly to remove any dirt or debris.
Inspect the wheels for any damage or defects.
Repair any issues found, such as replacing worn-out parts or fixing cracks.
Test the wheels to ensure they meet quality standards and perform as expected.
Hardness is the measure of a material's resistance to indentation or scratching.
Hardness is a property of materials that determines their ability to withstand deformation
It is often measured using tests like the Rockwell, Brinell, or Vickers hardness tests
Hardness can be influenced by factors such as the material's composition, heat treatment, and microstructure
Higher hardness generally indicates greater strength and d...
To upgrade suppliers, establish clear quality standards, conduct regular audits, provide feedback and support for improvement, and consider alternative suppliers.
Establish clear quality standards and communicate them to suppliers
Conduct regular audits to assess supplier performance and identify areas for improvement
Provide feedback and support to suppliers to help them meet quality standards
Consider alternative supplie...
Supplier selection criteria are the factors and considerations used to evaluate and choose suppliers for a company's procurement needs.
Quality and reliability of products or services
Supplier's financial stability and ability to meet demand
Supplier's track record and reputation
Cost and pricing
Supplier's location and proximity to the company
Supplier's compliance with industry standards and regulations
Supplier's capacity ...
I applied via Campus Placement and was interviewed before Oct 2020. There was 1 interview round.
based on 6 interview experiences
Difficulty level
Duration
based on 63 reviews
Rating in categories
Quality Engineer
34
salaries
| ₹2 L/yr - ₹4.5 L/yr |
CNC Machine Operator
8
salaries
| ₹2.1 L/yr - ₹3.2 L/yr |
Executive Accountant
8
salaries
| ₹1.9 L/yr - ₹4 L/yr |
Senior Quality Engineer
7
salaries
| ₹3.6 L/yr - ₹9.6 L/yr |
Engineer
7
salaries
| ₹3 L/yr - ₹4.3 L/yr |
JBM Group
Bosch
Subros
Samvardhana Motherson Group