Kems Auto Components
Eli Lilly and Company Interview Questions and Answers
Q1. What is the difference between Control plan and Quality plan
Control plan specifies how to control a process, while Quality plan outlines the overall quality objectives and strategies.
Control plan focuses on process control methods and parameters
Quality plan outlines quality objectives, standards, and strategies
Control plan is more detailed and specific to the production process
Quality plan is more general and covers overall quality management
Both plans are essential for ensuring product quality and process control
Q2. What is the purpose MSA
MSA stands for Measurement System Analysis. It is used to assess the capability of a measurement system to provide accurate and reliable results.
MSA helps in identifying sources of variation in measurement systems.
It ensures that the measurement system is capable of producing accurate and reliable results.
MSA includes studies like Gage R&R (Repeatability and Reproducibility) to assess measurement system variation.
It helps in improving the quality of measurements and reducing ...read more
Q3. How to control rejection
Rejection can be controlled by implementing robust quality control measures and continuous improvement processes.
Implementing thorough quality control checks at every stage of production
Regularly reviewing and analyzing rejection data to identify root causes
Training employees on quality standards and best practices
Implementing corrective and preventive actions based on rejection trends
Collaborating with suppliers to improve incoming materials quality
Q4. What is the difference between Geometrical tolerance & therotical tolerance?
Geometrical tolerance refers to the allowable variation in dimensions and form of a part, while theoretical tolerance is the ideal or perfect value for a dimension.
Geometrical tolerance allows for deviations in dimensions and form to ensure proper fit and function of parts.
Theoretical tolerance represents the ideal or perfect value for a dimension, with no allowance for variation.
Geometrical tolerance is specified using symbols like concentricity, perpendicularity, and parall...read more
Q5. What are the root cause for ovality?
Ovality in production engineering can be caused by factors such as improper tooling, material inconsistencies, and machine misalignment.
Improper tooling can lead to uneven pressure on the material, causing it to deform into an oval shape.
Material inconsistencies, such as variations in thickness or hardness, can result in non-uniform stretching during the production process.
Machine misalignment, where the equipment is not properly calibrated or maintained, can cause the materi...read more
Q6. How to manage shop floor?
Shop floor can be managed effectively by implementing efficient production processes, ensuring proper communication, maintaining a clean and organized workspace, and prioritizing safety.
Implement efficient production processes to optimize workflow and minimize downtime.
Ensure proper communication among team members to avoid misunderstandings and delays.
Maintain a clean and organized workspace to improve efficiency and reduce safety hazards.
Prioritize safety by enforcing safet...read more
Interview Process at Eli Lilly and Company
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month