Filter interviews by
I applied via LinkedIn and was interviewed in Jan 2024. There were 2 interview rounds.
Good and well written
Isolated footing is a type of foundation that supports a single column or a group of columns.
Isolated footings are used when columns are spaced relatively far apart.
The design of isolated footings involves calculating the size and depth of the footing based on the load from the column and the soil bearing capacity.
Factors such as soil type, column loads, and building codes must be considered in the design process.
Reinf...
Pipe racks are structures designed to support pipes and provide access for maintenance and inspection.
Consider the layout and arrangement of pipes to optimize space and minimize interference.
Ensure proper support and bracing to withstand loads and prevent sagging or buckling.
Include access platforms, ladders, and stairs for maintenance personnel.
Select materials and coatings suitable for the environment and corrosive s...
I was interviewed in Mar 2024.
Basic relativity question in mathematics and logics
I applied via Referral and was interviewed in Oct 2022. There were 2 interview rounds.
Erection of structural and pipeline involves the process of assembling and installing the components of a structure or pipeline.
The process involves planning, preparation, and execution.
Structural erection involves assembling and installing steel or concrete components to form a building or structure.
Pipeline erection involves laying and connecting pipes to transport fluids or gases.
Safety measures must be taken to ens...
Kavin Engineering And Services interview questions for popular designations
AutoCAD tool test is essential for electrical designers
Familiarity with AutoCAD interface and commands
Ability to create and edit electrical drawings
Knowledge of electrical symbols and standards
Experience with AutoCAD add-ons like AutoCAD Electrical
Efficient use of keyboard shortcuts and tool palettes
I applied via Approached by Company and was interviewed in May 2022. There was 1 interview round.
FQP stands for Foundation Quality Plan which outlines the quality control measures for piling work.
FQP is a document that outlines the quality control measures for piling work
It includes details on the materials to be used, testing procedures, and inspection requirements
The FQP is typically prepared by the contractor and approved by the client or consultant
It is important to follow the FQP to ensure that the piling wor
I applied via Walk-in and was interviewed in Apr 2021. There was 1 interview round.
posted on 14 Oct 2022
I applied via Referral and was interviewed before Oct 2021. There were 2 interview rounds.
Top trending discussions
Interview experience
based on 55 reviews
Rating in categories
Process Engineer
23
salaries
| ₹2.2 L/yr - ₹7.5 L/yr |
Piping Designer
17
salaries
| ₹4.2 L/yr - ₹8.2 L/yr |
Piping Design Engineer
16
salaries
| ₹2.4 L/yr - ₹8.2 L/yr |
Instrument Engineer
10
salaries
| ₹3.6 L/yr - ₹9.4 L/yr |
Resident Construction Manager
9
salaries
| ₹7.8 L/yr - ₹13 L/yr |
L&T Technology Services
TCS
BHEL
Thermax Limited