Upload Button Icon Add office photos

Filter interviews by

Karamtara Engineering Commercial Manager Interview Questions and Answers

Updated 16 Jul 2024

Karamtara Engineering Commercial Manager Interview Experiences

1 interview found

Commercial Manager Interview Questions & Answers

user image mahesh Shantilal Tikadiya

posted on 16 Jul 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Past experience
  • Q2. Knowledge of work for concern department

Interview questions from similar companies

I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Education and previous work details

Interview Preparation Tips

Interview preparation tips for other job seekers - Very friendly cooperation.

Interview Questionnaire 

4 Questions

  • Q1. What will you do when material is not received in time at site ?
  • Ans. 

    I will assess the situation and take necessary actions to minimize the impact on the project timeline.

    • Check with the supplier for the reason of delay and expected delivery date

    • Evaluate the impact on the project timeline and inform the project team

    • Explore alternative options such as sourcing from a different supplier or adjusting the project schedule

    • Communicate the revised plan to all stakeholders and ensure timely deli...

  • Answered by AI
  • Q2. How do you manage the team ?
  • Ans. Should maintain proper communication between team members. Good planning assists allocation of work responsibilities to team members, also it avoids irrational approach and duplication of works. As a best team player can complete the project within a specified time and budget.
  • Answered Anonymously
  • Q3. How do you calculate the cement and sand for 1 sqm cm 1:4?
  • Ans. 

    To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.

    • The ratio of cement to sand is 1:4

    • Calculate the total volume of the mixture, which is 1 sqm cm

    • Divide the total volume by the sum of the ratio (1+4=5)

    • Multiply the quotient by the individual ratio to get the volume of cement and sand

    • Convert the volume to weight using the de

  • Answered by AI
  • Q4. What is price escalation?
  • Ans. 

    Price escalation refers to the increase in the price of goods or services over time.

    • It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.

    • Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.

    • For example, the price of gasoline may escalate due to an increase in the cost of c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions are majorly from technical side as per your experience and civil Engineering subjects. Some of the questions related to IS Codes.

I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is my strength?
  • Ans. 

    My strength is my ability to lead and motivate a team towards achieving goals.

    • Effective communication skills

    • Strong decision-making abilities

    • Ability to delegate tasks efficiently

    • Positive attitude towards challenges

    • Experience in managing teams

    • Motivational skills

    • Goal-oriented mindset

  • Answered by AI
  • Q2. What is my weakness?

Interview Preparation Tips

Topics to prepare for Ramky Infrastructure Assistant Manager interview:
  • Technicals
Interview preparation tips for other job seekers - Give interview confidently and they do a much of bargaining in salary. So stay in your demand.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Nothing just basic information and then they are conducting technical round based on your profile or department

Interview Preparation Tips

Interview preparation tips for other job seekers - Good experience
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is your experience
  • Ans. 

    I have 5 years of experience in management roles, including 2 years as an Assistant Manager.

    • 5 years of management experience

    • 2 years as an Assistant Manager

    • Successfully led a team of 10 employees

    • Implemented new strategies to improve productivity and efficiency

    • Trained and mentored new employees

  • Answered by AI
  • Q2. What is the thickness of subgrade
  • Ans. 

    The thickness of subgrade varies depending on the type of construction and soil conditions.

    • The thickness of subgrade is determined based on the load-bearing capacity required for the structure.

    • It is typically measured in inches or centimeters.

    • For example, in road construction, the subgrade thickness can range from 6 to 12 inches.

    • In building construction, it may vary from a few inches to several feet depending on the bu

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Hhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhh
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Rate analysis for building Items
  • Ans. 

    Rate analysis for building items involves calculating the cost of materials, labor, and overhead for each item in a construction project.

    • Rate analysis helps in determining the cost of each building item based on material and labor costs.

    • It involves breaking down the total cost into components like material cost, labor cost, and overhead expenses.

    • Rate analysis helps in estimating the total project cost accurately.

    • For ex...

  • Answered by AI
  • Q2. Material Rates of building materials
  • Ans. 

    Material rates of building materials vary based on factors like location, quality, and demand.

    • Material rates can vary based on the location of the construction site.

    • The quality of the building materials can also impact the rates.

    • Demand for certain materials can cause fluctuations in prices.

    • For example, the rate of cement in urban areas may be higher compared to rural areas.

    • Higher quality bricks may cost more than lower...

  • Answered by AI

I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.

Interview Questionnaire 

10 Questions

  • Q1. We will give only salary, no facilities, no guest house , no HRA, they keep only container at site no office building, transport one car 9 people sitting, no timings, heavy politics
  • Q2. Why to use 24/7 watsapp so many groups messages ?
  • Ans. 

    24/7 WhatsApp groups messages are essential for effective communication and quick decision-making.

    • WhatsApp groups allow for instant communication and collaboration among team members

    • 24/7 availability ensures that urgent matters can be addressed promptly

    • Group messages allow for sharing of important information and updates

    • Reduces the need for lengthy email chains and phone calls

    • Increases efficiency and productivity

    • Exampl...

  • Answered by AI
  • Q3. When you conduct meating with , why you not share MOM and distribute checklist, decsion/ changes taken in meetings if you dont deliver to ground workers , what is pupose of meeting?
  • Q4. Organogram designations should be in this way ,(keypersons) TL, DTL, desiner, planner, contract administrator, surveyor , architect, (profeessional staff ) qs engineer, qc engineer but here TL , Construct...
  • Q5. When nught shifts food not available
  • Ans. 

    Alternative food options will be provided for night shifts.

    • We understand the importance of providing food for our employees, especially during night shifts.

    • We will ensure that alternative food options are available for our employees during night shifts.

    • This may include providing pre-packaged meals or snacks, or arranging for food delivery services.

    • We will work with our employees to ensure that their dietary needs and p...

  • Answered by AI
  • Q6. They will listen only toTL only and no feedback from lower staff
  • Q7. Officer managers, document controller ,office boy , sweepers are not there
  • Q8. No place to eat in the afternoon
  • Q9. No sharing technical codes/training from head office
  • Q10. Politics are heavy

Interview Preparation Tips

Interview preparation tips for other job seekers - be honest

Interview Questionnaire 

1 Question

  • Q1. How will you implement ISO systems, and how will you educate site engineers about quality improvements ..
  • Ans. 

    I will implement ISO systems by conducting a gap analysis, creating a plan, and providing training to site engineers.

    • Conduct a gap analysis to identify areas of improvement

    • Create a plan to implement ISO systems

    • Provide training to site engineers on ISO standards and quality improvements

    • Establish a system for monitoring and measuring quality performance

    • Encourage continuous improvement through regular audits and reviews

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is the minimum time of concrete getting strength
  • Ans. 

    The minimum time for concrete to gain strength is typically 28 days.

    • Concrete typically gains strength over time, with significant strength achieved after 28 days.

    • Factors such as mix design, curing conditions, and environmental factors can affect the rate of strength gain.

    • Testing is often done at various intervals to monitor the strength development of concrete.

    • Early strength concrete mixes are available for projects re

  • Answered by AI

Karamtara Engineering Interview FAQs

How many rounds are there in Karamtara Engineering Commercial Manager interview?
Karamtara Engineering interview process usually has 1 rounds. The most common rounds in the Karamtara Engineering interview process are One-on-one Round.

Tell us how to improve this page.

Karamtara Engineering Commercial Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tractebel Interview Questions
4.1
 • 42 Interviews
SYSTRA Interview Questions
4.0
 • 23 Interviews
View all
Karamtara Engineering Commercial Manager Salary
based on 5 salaries
₹15 L/yr - ₹16 L/yr
30% more than the average Commercial Manager Salary in India
View more details
Quality Engineer
67 salaries
unlock blur

₹1.5 L/yr - ₹4.1 L/yr

Production Engineer
53 salaries
unlock blur

₹1.2 L/yr - ₹4.8 L/yr

Assistant Manager
33 salaries
unlock blur

₹4.8 L/yr - ₹9 L/yr

Graduate Engineer Trainee (Get)
17 salaries
unlock blur

₹1.7 L/yr - ₹4 L/yr

Safety Officer
16 salaries
unlock blur

₹2.5 L/yr - ₹4 L/yr

Explore more salaries
Compare Karamtara Engineering with

Sterling & Wilson

4.1
Compare

Nasser S. Al Hajri Corporation

3.6
Compare

Ramky Infrastructure

4.2
Compare

L & W Constructions

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview