Filter interviews by
Details about work responsibilities and Work experience improvement
I have achieved significant milestones in my career as a Project Engineer.
Successfully completed a complex construction project within the given timeline and budget.
Implemented innovative strategies to improve project efficiency and reduce costs.
Received recognition for outstanding problem-solving skills and ability to handle challenging situations.
Led a team of engineers and technicians to successfully deliver multipl...
Top trending discussions
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
The project lifecycle is the series of phases a project goes through from initiation to completion.
Initiation: Define project goals, scope, and stakeholders
Planning: Create a detailed project plan, schedule, and budget
Execution: Implement the project plan and deliver the project
Monitoring and Controlling: Track progress, manage changes, and ensure quality
Closing: Finalize all project activities and hand off deliverable
Model reviews typically include checking for accuracy, completeness, consistency, and compliance with standards.
Checking accuracy of dimensions and specifications
Ensuring completeness of all required components and features
Verifying consistency in design and documentation
Confirming compliance with industry standards and regulations
The typical deliverables of a project engineer include design drawings, technical specifications, project schedules, cost estimates, and progress reports.
Design drawings: detailed plans and schematics for construction or manufacturing
Technical specifications: detailed requirements for materials, equipment, and processes
Project schedules: timelines for completing tasks and milestones
Cost estimates: budget projections fo...
The density of cement is around 1440 kg/m³.
Density of cement is the mass per unit volume of cement.
It is measured in kg/m³ or g/cm³.
The density of cement varies depending on the type of cement used.
For example, the density of Portland cement is around 1440 kg/m³.
The density of lightweight cement is around 1000 kg/m³.
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.
Friction loss due to pipe roughness
Elevation change between inlet and outlet
Velocity head due to fluid velocity
Losses from fittings like elbows, tees, and valves
AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.
Filters - to remove dust and particles from the air
Coils - for heating or cooling the air
Fans - to circulate the air
Dampers - to control the flow of air
Humidifiers/dehumidifiers - to adjust the humidity levels
Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.
Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.
They are more energy efficient compared to other types of blowers.
Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.
Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.
Primary pump is the main pump in a system, while secondary pump is a backup pump.
Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.
Examples: In a heating system, the primary pump circulates hot water throug...
AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.
AHU valve connection is essential for regulating the flow of air in an air handling unit.
Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.
Properly connected valves ensure efficient operation of the AHU system.
Examples of AHU valves include damper val
Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.
Flow rate: Determine the required flow rate of chilled water in the system.
Pressure drop: Calculate the pressure drop to ensure efficient operation.
Material: Select appropriate pipe material based on temperature and pressure requirements.
Insulation: Insulate the pipes to prevent heat gain or loss.
System desi...
The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.
Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.
The connection may also include electrical wiring for power supply and control signals.
Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system
posted on 18 Jul 2024
posted on 7 May 2024
I applied via LinkedIn and was interviewed in Apr 2024. There were 3 interview rounds.
posted on 19 Nov 2022
I applied via Naukri.com and was interviewed in Oct 2022. There were 3 interview rounds.
I am changing jobs to seek new challenges and opportunities for growth.
Seeking new challenges and opportunities for growth
Looking for a more fulfilling role
Wanting to work in a different environment or industry
Desire for better work-life balance
Wishing to relocate to a different city or country
RCC grade M25 is a concrete mix design ratio used in construction.
RCC stands for Reinforced Cement Concrete.
M25 is the compressive strength of the concrete after 28 days of curing.
The mix design ratio for M25 is 1:1:2 (cement:sand:aggregate).
It is commonly used in the construction of buildings, bridges, and other structures.
M25 grade concrete is suitable for moderate exposure conditions.
Yes, I know bbs making.
BBS stands for Bar Bending Schedule, which is a document that provides details of reinforcement steel bars required for construction.
BBS making involves preparing the schedule by calculating the required length, weight, and number of bars for each structural element.
It is an important task for ensuring the strength and durability of the structure.
BBS making requires knowledge of engineering drawi...
Yes, estimation is a crucial aspect of project management civil.
Estimation involves predicting the cost, time, and resources required for a project.
It is important to have accurate estimations to ensure the project stays within budget and on schedule.
Estimation techniques include top-down, bottom-up, and parametric estimation.
Factors such as project scope, complexity, and risk must be considered when making estimations...
To cover delay of project, identify the cause, adjust timeline, allocate additional resources, and communicate with stakeholders.
Identify the cause of delay
Adjust timeline and prioritize tasks
Allocate additional resources if necessary
Communicate with stakeholders regularly
Reassess project plan and adjust as needed
Construction work can be managed by planning, organizing, and controlling resources and activities to achieve project goals.
Develop a detailed project plan and schedule
Assign tasks and responsibilities to team members
Monitor progress and adjust plans as necessary
Ensure safety and compliance with regulations
Communicate effectively with stakeholders
Manage budget and resources
Use technology and software to streamline proc
Scope of work can be controlled by defining clear objectives, creating a detailed project plan, and monitoring progress regularly.
Define clear objectives and deliverables
Create a detailed project plan with timelines and milestones
Identify potential risks and develop contingency plans
Regularly monitor progress and adjust the plan as needed
Communicate changes and updates to stakeholders
Quality Engineer
64
salaries
| ₹1.7 L/yr - ₹4.1 L/yr |
Production Engineer
48
salaries
| ₹1.2 L/yr - ₹4.5 L/yr |
Assistant Manager
34
salaries
| ₹4.2 L/yr - ₹9 L/yr |
Graduate Engineer Trainee (Get)
18
salaries
| ₹1.7 L/yr - ₹4 L/yr |
Safety Officer
17
salaries
| ₹2.5 L/yr - ₹4 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Thermax Limited