  • Q1. What is refinery job
  • Ans. 

    A refinery job involves operating and maintaining equipment in a refinery to process raw materials into usable products.

    • Refinery jobs require knowledge of various mechanical systems and processes.

    • Technicians are responsible for troubleshooting and repairing equipment.

    • They monitor and control the flow of materials and ensure safety protocols are followed.

    • Examples of refinery jobs include operating pumps, compressors, an...

  • Answered by AI
  • Q2. What is mechanical jobs
  • Ans. 

    Mechanical jobs involve designing, building, and maintaining mechanical systems and equipment.

    • Designing and testing mechanical systems

    • Installing and maintaining mechanical equipment

    • Troubleshooting and repairing mechanical issues

    • Working with tools and machinery

    • Collaborating with other technicians and engineers

    • Examples: HVAC technician, automotive mechanic, industrial machinery mechanic

  • Answered by AI

Mechanical Technician Interview Questions asked at other Companies

Q1. 1. During confined space job , what is the role of safety watch ? 2. Alignment method of pump and motor. 3. Different type of Gasket , valves using in plant. 4. Compressor type and trouble shooting of reciprocating compressor.
View answer (2)

Interview Questionnaire 

1 Question

  • Q1. What is column,procedure, safety related

Mechanical Supervisor Interview Questions asked at other Companies

Q1. What you will do if any person injured inside confine space?
View answer (2)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Operator 

(2 Questions)

  • Q1. RO REVERSE OSMOSIS.
  • Q2. Chemical use in R.O plant Chlorine • Sulphuric Acid • Sodium Meta Bi Sulphate • AntisCalant • Caustic Soda

Interview Preparation Tips

Interview preparation tips for other job seekers - Operate and maintain the Reverse Osmosis Plant to produce optimum quality,
potable water
Maintain the treatment plant systems
Maintain and operate the filtering and chemical treatment processe
Inspect, service and repair components of the water treatment plant including
water intakes, pipes, water storage vessels, chemical treatment equipment
controls, circulation pumps, boilers, heat exchangers and valves
Ensure an adequate supply of water for human consumption and fire fighting
activities
Prepare work orders for servicing and repairs the treatment plant systems on a
daily basis to ensure effective operations
Conduct regular inspections of the physical plant
Establish a preventative maintenance program
Maintain the general administration of the water system in order to ensure
effective operations
Establish preventative maintenance schedules
Administer water distribution contracts
Keep a daily log Book
Prepare activity and work order reports
Recommend the purchase of goods and equipment
Maintain inventories
Ensure records are maintained
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jul 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Logical Reasoning, English Comprehension

Round 2 - Assignment 

Accounting Assessment - Journal Entries, Golden rules

Round 3 - One-on-one 

(8 Questions)

  • Q1. Introduce yourself.
  • Ans. 

    I am a recent graduate with a degree in finance, eager to learn and grow in the field. I have completed internships in financial analysis and have strong analytical skills.

    • Recent graduate with a degree in finance

    • Completed internships in financial analysis

    • Strong analytical skills

    • Eager to learn and grow in the field

  • Answered by AI
  • Q2. Who is your role-model?
  • Ans. 

    My role-model is Warren Buffett, the legendary investor known for his value investing approach and long-term perspective.

    • Warren Buffett's disciplined approach to investing inspires me to focus on long-term value creation rather than short-term gains.

    • His emphasis on continuous learning and improvement motivates me to constantly seek knowledge and grow in my field.

    • Buffett's philanthropic efforts and commitment to giving ...

  • Answered by AI
  • Q3. Journal entries for Prepaid Expenses.
  • Q4. How can internal control be implemented in a company?
  • Ans. 

    Internal control can be implemented in a company through various measures such as segregation of duties, regular audits, and implementing policies and procedures.

    • Segregation of duties to prevent fraud and errors

    • Regular audits to ensure compliance with policies and procedures

    • Implementing policies and procedures to guide employees on proper conduct and processes

    • Establishing a system of checks and balances to monitor and ...

  • Answered by AI
  • Q5. Types of Financial Statements.
  • Ans. 

    Financial statements are documents that provide information about a company's financial performance and position.

    • Income Statement: Shows a company's revenues and expenses over a specific period of time.

    • Balance Sheet: Provides a snapshot of a company's assets, liabilities, and equity at a specific point in time.

    • Cash Flow Statement: Details the cash inflows and outflows of a company during a specific period.

    • Statement of ...

  • Answered by AI
  • Q6. How to calculate Cash flow from Operating Activities?
  • Ans. 

    Cash flow from operating activities is calculated by adjusting net income for non-cash items and changes in working capital.

    • Start with net income from the income statement

    • Add back non-cash expenses like depreciation and amortization

    • Adjust for changes in working capital items like accounts receivable, accounts payable, and inventory

    • Subtract any non-operating gains or losses

    • Example: Cash flow from operating activities = ...

  • Answered by AI
  • Q7. What would you do if you are responsible for your friend's mistakes?
  • Ans. 

    I would address the situation directly with my friend, take responsibility for any part I played, and work together to find a solution.

    • Have an open and honest conversation with my friend about the mistakes made

    • Take responsibility for any role I may have played in the mistakes

    • Collaborate with my friend to come up with a plan to rectify the situation

    • Support my friend in making amends and learning from the experience

  • Answered by AI
  • Q8. What would you do if you make an error in your work?
  • Ans. 

    I would immediately take responsibility for the error, analyze the root cause, and work towards finding a solution to rectify it.

    • Acknowledge the mistake and take responsibility for it

    • Communicate the error to the relevant stakeholders

    • Analyze the root cause of the error to prevent future occurrences

    • Work towards finding a solution to rectify the error

    • Seek guidance or assistance if needed

    • Learn from the mistake and implemen

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and give a straightforward answer. If you don't know the question try your best or admit that you are not aware.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Oct 2024. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Write unit testing for adding two nimbers
  • Ans. 

    Unit testing for adding two numbers

    • Create a test case with two numbers and expected sum

    • Call the function that adds two numbers

    • Assert that the result matches the expected sum

  • Answered by AI
Round 2 - Behavioral 

(1 Question)

  • Q1. Explain challenge you faced in your last project
Round 3 - HR 

(1 Question)

  • Q1. Salary expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare on fundamentals and previous projects

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. What was your previous experience
  • Ans. 

    I have over 5 years of experience in sales, with a focus on territory management and exceeding sales targets.

    • Managed a territory of 50+ accounts, consistently exceeding sales targets by 20%

    • Developed and implemented strategic sales plans to penetrate new markets and increase revenue

    • Built strong relationships with key decision-makers to drive business growth

    • Utilized CRM software to track sales activities and analyze perf...

  • Answered by AI
  • Q2. What do you know about the water industry
  • Ans. 

    The water industry encompasses various sectors including water treatment, distribution, and wastewater management.

    • The water industry is essential for providing clean and safe drinking water to communities.

    • It involves processes such as water treatment, distribution, and wastewater management.

    • Key players in the industry include water utilities, water treatment companies, and government agencies.

    • Technological advancements...

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. How many visits do you do per day
  • Ans. 

    I typically aim for 5-7 visits per day to ensure quality interactions with clients.

    • I prioritize quality over quantity in my visits

    • I schedule my visits strategically to maximize efficiency

    • I aim to build strong relationships with clients during each visit

  • Answered by AI
  • Q2. About B2B experience and how do you start your day
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Tell Me About work Experience
  • Q2. How to Arrest leakages?
  • Ans. 

    To arrest leakages, identify the source, implement preventive measures, monitor regularly, and take corrective actions.

    • Identify the source of leakages through regular audits and inspections.

    • Implement preventive measures such as installing leak detection systems or improving maintenance procedures.

    • Monitor regularly by analyzing data and conducting spot checks.

    • Take corrective actions promptly to fix leaks and prevent fut

  • Answered by AI
  • Q3. Types of grouting Method
  • Ans. 

    Grouting methods include cementitious grouting, chemical grouting, and pressure grouting.

    • Cementitious grouting involves mixing cement, water, and additives to create a flowable material for filling gaps.

    • Chemical grouting uses chemical compounds to fill voids and stabilize soil or rock formations.

    • Pressure grouting injects grout under pressure to fill cracks and voids in structures.

    • Examples: epoxy grouting, urethane grou

  • Answered by AI
  • Q4. How much Concrete Consumed in your last project!
  • Ans. 

    Approximately 500 cubic yards of concrete were consumed in the last project.

    • The amount of concrete consumed in a project can vary depending on the size and scope of the project.

    • Factors such as the type of structure being built, the design specifications, and the location can all impact the amount of concrete needed.

    • For example, a small residential project may only require a few cubic yards of concrete, while a large co...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Case Study 

All the questions asked about hydraulic design of water distribution network and hydraulic modeling software like ICM, info works, waterGEMS and SewerGEMS etc.

Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Tell me about yourself
  • Q2. Left join right join
  • Q3. Union and intersect
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(6 Questions)

  • Q1. What is the CPC CABLE
  • Ans. 

    CPC CABLE stands for Circuit Protective Conductor cable, which is used for earthing and providing protection against electric shock.

    • CPC CABLE is also known as the earth wire in electrical installations.

    • It is typically colored green and yellow to distinguish it from other cables.

    • The CPC CABLE is connected to metal parts of electrical equipment to prevent electric shock in case of a fault.

  • Answered by AI
  • Q2. How to work ATS
  • Q3. What is the High pot test done for?
  • Ans. 

    High pot test is done to check the insulation of electrical equipment.

    • High pot test is done to ensure the insulation in electrical equipment can withstand high voltage without breaking down.

    • It helps in identifying any weaknesses or defects in the insulation that could lead to electrical hazards.

    • The test involves applying a higher than normal voltage to the equipment to see if the insulation can handle it.

    • High pot testi...

  • Answered by AI
  • Q4. What is spacifficatin of the Ht cable?
  • Ans. 

    HT cables are high tension cables used for transmitting electricity at high voltages.

    • HT cables are designed to carry high voltage electricity, typically above 11kV.

    • They are insulated to prevent leakage of current and ensure safety.

    • HT cables are usually made of materials like cross-linked polyethylene (XLPE) or ethylene propylene rubber (EPR).

    • They are often armored to protect against physical damage and environmental fa...

  • Answered by AI
  • Q5. What is different in RCBO AND RCCB , ELCB ?
  • Ans. 

    RCBO combines the functions of an RCD and a miniature circuit breaker, while RCCB and ELCB are older versions of RCDs.

    • RCBO combines overcurrent protection (like a circuit breaker) with earth fault protection (like an RCD)

    • RCCB is an older version of RCD that only detects earth faults

    • ELCB is an even older version of RCD that detects earth faults by measuring the current imbalance between live and neutral wires

    • RCBO is com...

  • Answered by AI
  • Q6. What is the ten delta test and which equipment in used ten delta test ?
  • Ans. 

    The ten delta test is a diagnostic test used to assess the condition of power transformers.

    • The ten delta test measures the change in power factor between the initial and final stages of a transformer's life.

    • It is used to detect insulation deterioration and moisture content in the transformer oil.

    • Equipment used for the ten delta test includes a power factor test set, a transformer turns ratio tester, and a megohmmeter.

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What work in UPM in data centre
  • Ans. 

    UPM in data centre involves managing electrical systems, ensuring uptime, and implementing energy efficiency measures.

    • Managing electrical systems to ensure continuous power supply

    • Implementing energy efficiency measures to reduce costs

    • Monitoring and maintaining backup power systems

    • Troubleshooting electrical issues to minimize downtime

    • Coordinating with other departments for electrical maintenance schedules

  • Answered by AI
  • Q2. How to work issholation transformer
  • Ans. 

    Isolation transformers are used to isolate electrical devices from the power source for safety and protection.

    • Isolation transformers have primary and secondary windings that are electrically separated to prevent direct current flow between the input and output.

    • They are commonly used in medical equipment, data centers, and sensitive electronic devices to protect them from electrical noise and voltage spikes.

    • Isolation tr...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical supervisor in NPCIL project penal cable laying termination, mins in electrical supervisor
Data centre in project electrical supervisor

Skills evaluated in this interview

Kanooz Industrial Services Interview FAQs

How to prepare for Kanooz Industrial Services interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Kanooz Industrial Services. The most common topics and skills that interviewers at Kanooz Industrial Services expect are Troubleshooting.
What are the top questions asked in Kanooz Industrial Services interview?

Some of the top questions asked at the Kanooz Industrial Services interview -

  1. What is mechanical jo...read more
  2. What is refinery ...read more
  3. What is column,procedure, safety relate...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.1k Interviews
Infosys Interview Questions
3.7
 • 7.4k Interviews
Wipro Interview Questions
3.7
 • 5.5k Interviews
Tech Mahindra Interview Questions
3.6
 • 3.7k Interviews
HCLTech Interview Questions
3.5
 • 3.7k Interviews
LTIMindtree Interview Questions
3.9
 • 2.8k Interviews
Mphasis Interview Questions
3.4
 • 780 Interviews
View all

Kanooz Industrial Services Reviews and Ratings

based on 41 reviews

3.7/5

Rating in categories

3.6

Skill development

3.6

Work-Life balance

3.1

Salary & Benefits

3.4

Job Security

3.3

Company culture

3.0

Promotions/Appraisal

3.5

Work Satisfaction

Explore 41 Reviews and Ratings
Mechanical Supervisor
13 salaries
unlock blur

₹7 L/yr - ₹16 L/yr

Planning Engineer
13 salaries
unlock blur

₹9.4 L/yr - ₹24 L/yr

Mechanical Technician
11 salaries
unlock blur

₹4.5 L/yr - ₹7 L/yr

Project Engineer
11 salaries
unlock blur

₹10 L/yr - ₹18 L/yr

Safety Supervisor
8 salaries
unlock blur

₹11 L/yr - ₹14.7 L/yr

Explore more salaries
Compare Kanooz Industrial Services with

TCS

3.7
Compare

Infosys

3.7
Compare

Wipro

3.7
Compare

Tech Mahindra

3.6
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview