I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, building erection, finishing, and inspection.
Planning: Develop project scope, schedule, and budget.
Designing: Create detailed plans and blueprints.
Obtaining permits: Obtain necessary approvals from local authorities.
Site preparation: Clearing, grading, and leveling the construction site.
Foundation construc...
Different activities in project execution involve planning, scheduling, monitoring, controlling, and closing.
Planning involves defining project scope, objectives, and deliverables.
Scheduling includes creating timelines, assigning resources, and setting milestones.
Monitoring involves tracking progress, identifying issues, and making adjustments.
Controlling focuses on ensuring project stays on track and within budget.
Clo...
I was interviewed in Jul 2024.
I applied via campus placement at Institute of Chartered Accountant of India (ICAI) and was interviewed in Sep 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Jul 2024. There were 2 interview rounds.
Kalpataru Projects International interview questions for popular designations
I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.
Hydrostatic testing is a common method used to test the integrity of DI and HDPE pipes by pressurizing them with water.
Hydrostatic testing involves filling the pipe with water and pressurizing it to a specified level to check for leaks or weaknesses.
DI (Ductile Iron) pipes are typically tested at 1.5 times their working pressure, while HDPE (High-Density Polyethylene) pipes are tested at 1.25 times their working pressu...
Get interview-ready with Top Kalpataru Projects International Interview Questions
I applied via Campus Placement and was interviewed in Mar 2024. There were 4 interview rounds.
Base of civil engineering
Basics of civil engineering
I applied via LinkedIn and was interviewed in Jan 2024. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jul 2020. There was 1 interview round.
Top trending discussions
Some of the top questions asked at the Kalpataru Projects International interview -
The duration of Kalpataru Projects International interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 240 interviews
Interview experience
based on 4k reviews
Rating in categories
12-15 Yrs
Not Disclosed
Deputy Manager
569
salaries
| ₹5.4 L/yr - ₹18 L/yr |
Assistant Manager
546
salaries
| ₹3.8 L/yr - ₹16 L/yr |
Senior Engineer
473
salaries
| ₹3.5 L/yr - ₹10.6 L/yr |
Manager
243
salaries
| ₹6.2 L/yr - ₹24 L/yr |
Civil Engineer
241
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power