I applied via Recruitment Consulltant and was interviewed before Jul 2020. There was 1 interview round.
Top trending discussions
posted on 22 Dec 2024
posted on 20 Jan 2024
I applied via Naukri.com and was interviewed in Jul 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
BBS in construction stands for Bar Bending Schedule.
BBS is a document that provides details about the reinforcement steel bars used in a construction project.
It includes information about the size, shape, quantity, and placement of the bars.
BBS helps in estimating the required amount of steel, planning the cutting and bending of bars, and ensuring proper reinforcement in the structure.
Example: BBS for a column may spec...
Mix ratio M 25 is a concrete mix design that consists of 1 part cement, 1 part fine aggregate, and 2 parts coarse aggregate.
M 25 mix ratio is commonly used in construction for structural applications.
The mix ratio represents the proportions of different materials used in the concrete mix.
For M 25, the ratio is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone chips or g...
The number of zones in a u grider varies depending on the specific design and requirements.
The number of zones in a u grider can range from 1 to multiple zones.
Zones are typically created to divide the grider into sections for better load distribution and structural stability.
The number of zones may be determined by factors such as the length and span of the grider, the load it needs to support, and the design specific...
To calculate zone A, zone B, and zone C, you need to know the total area and the dimensions of each zone.
Determine the total area of the site
Calculate the area of zone A by subtracting the combined area of zones B and C from the total area
Calculate the area of zone B using the given dimension
Calculate the area of zone C by subtracting the area of zone B from the total area
Ensure the units of measurement are consistent
Working at heights requires proper safety measures and equipment.
Use appropriate safety harnesses and fall protection systems.
Ensure scaffolding and ladders are secure and stable.
Follow safety guidelines and regulations.
Provide proper training to workers on working at heights.
Regularly inspect and maintain equipment and tools.
Implement safety barriers and guardrails.
Use aerial lifts or platforms for safe access to elev...
I behave as a civil engineer by being professional, organized, and detail-oriented.
I maintain a professional demeanor at all times, treating colleagues and clients with respect.
I am organized in my work, keeping track of project timelines, budgets, and resources.
I pay attention to details, ensuring accuracy in calculations, measurements, and documentation.
I communicate effectively with team members, subcontractors, and...
I applied via Walk-in and was interviewed before Feb 2023. There were 6 interview rounds.
Any questions asking related civil construction
Behavior is must be staff & company
Safety related questions
posted on 28 Apr 2022
I was interviewed in Oct 2021.
posted on 11 Apr 2022
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
posted on 10 Mar 2024
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.
The pour sequence refers to the order in which concrete is poured into formwork during construction.
The pour sequence is determined based on the design requirements, structural considerations, and weather conditions.
It is important to follow the pour sequence to ensure proper curing and strength of the concrete.
For example, in a multi-story building construction, the pour sequence may start from the bottom floors and w...
U-girder is a type of precast concrete girder used in bridge construction.
U-girders are shaped like the letter 'U' and are commonly used in bridge projects.
They are precast off-site and transported to the construction site for installation.
U-girders provide structural support and are often used in combination with other bridge components.
They are designed to distribute the load of the bridge deck and traffic to the bri
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 2 interview rounds.
Deputy Manager
569
salaries
| ₹5.4 L/yr - ₹18 L/yr |
Assistant Manager
544
salaries
| ₹3.8 L/yr - ₹16 L/yr |
Senior Engineer
471
salaries
| ₹3.5 L/yr - ₹10.6 L/yr |
Manager
243
salaries
| ₹6.2 L/yr - ₹24 L/yr |
Civil Engineer
241
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power