Upload Button Icon Add office photos

Kaefer

Compare button icon Compare button icon Compare

Filter interviews by

Kaefer Senior HSE Supervisor Interview Questions and Answers

Updated 30 May 2022

Kaefer Senior HSE Supervisor Interview Experiences

1 interview found

I applied via Recruitment Consultant and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Why u want to join Our organization.
  • Ans. 

    I want to join your organization because of its strong reputation, commitment to excellence, and opportunities for growth.

    • Strong reputation: Your organization is known for its high-quality services and positive impact on the community.

    • Commitment to excellence: I appreciate your organization's dedication to providing the best possible care and support to patients.

    • Opportunities for growth: I believe that joining your org...

  • Answered by AI
  • Q2. What is insulation and how u managed the site as a HSE
  • Ans. 

    Insulation is a material used to prevent heat loss or gain in a building or equipment.

    • Insulation can be made of various materials such as fiberglass, foam, or cellulose.

    • As a Senior HSE Supervisor, I ensured that proper insulation was installed to prevent potential hazards such as fire or exposure to harmful substances.

    • I also conducted regular inspections to ensure that the insulation was in good condition and not damag...

  • Answered by AI
  • Q3. How u wil l coordinate and handle the client
  • Ans. 

    I will coordinate and handle the client by actively listening to their needs, providing clear communication, and ensuring prompt and effective resolution of any issues or concerns.

    • Actively listen to the client to understand their needs and expectations

    • Maintain clear and open communication channels with the client

    • Promptly address any issues or concerns raised by the client

    • Ensure effective resolution of client problems b...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm and understand the question first.
Maintain eye contact with clients.
Show confidance on face.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Questions will be asked on previous company roles and responsibilities.
  • Q2. Depends upon previous experience.
Round 2 - Technical 

(2 Questions)

  • Q1. Basics on structure and finishings
  • Q2. Questions on structure and finishings

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for what u wrote in resume.

Interview Questionnaire 

1 Question

  • Q1. What is lagging and leading indicator.
  • Ans. 

    Lagging indicators measure past performance while leading indicators predict future performance.

    • Lagging indicators are reactive and measure the results of past actions.

    • Leading indicators are proactive and predict future outcomes.

    • Examples of lagging indicators include injury rates, lost time incidents, and workers' compensation costs.

    • Examples of leading indicators include safety training, safety audits, and near-miss re...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Foundation installation process is oil and gas industry
  • Ans. Explain it as required as per industry requirement like Valid Permit, Valid lifting plan, Approved method statement, barrication,Sign boards, banks man, competent and certified equipment and operator, rigger, color coded and inspected lifting accessories, check wind speed limits, foggy or dusty weather conditions
  • Answered Anonymously
  • Q2. Excavation process for oil and gas industry
  • Ans. 

    Excavation process in the oil and gas industry involves several steps to ensure safe and efficient operations.

    • The first step in the excavation process is to conduct a thorough site survey to identify potential hazards and determine the best approach for excavation.

    • Before excavation begins, proper permits and approvals must be obtained from relevant authorities.

    • Excavation equipment such as excavators, bulldozers, and ba...

  • Answered by AI
  • Q3. Valid Permit, approved method statement, Excavation certificate, check GPR (Ground penetrating radar)report, CAT (Cable avoidance Tool) Scan, Drawing, route marker, Trial pit, hard barricade the area, cert...

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared as per your resume and for the post you apply for
If possible then Do some research about company and project that you apply for
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is bar bending schedule
  • Ans. 

    Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.

    • It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.

    • Helps in estimating the quantity of steel required for construction.

    • Ensures proper placement and bending of reinforcement bars as per design specifications.

    • Used by contractors, engineers, and construction workers for re...

  • Answered by AI
  • Q2. 28 days concrete strength
  • Ans. 

    28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.

    • 28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing

    • It is important for assessing the quality of concrete and its ability to support structural loads

    • The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing

  • Answered by AI
  • Q3. Difference between mivan and conventional
  • Ans. 

    Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.

    • Mivan is faster and more efficient than conventional construction methods.

    • Mivan requires skilled labor for installation of aluminum formwork.

    • Conventional construction is more labor-intensive and time-consuming.

    • Mivan provides better quality finishes compared to conventional...

  • Answered by AI
  • Q4. What is self leveling concrete
  • Ans. 

    Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.

    • Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.

    • It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.

    • Self leveling concrete can be applied in thicknesses ranging from a featheredg...

  • Answered by AI
  • Q5. How many days will take 1st Aluform mockup Concreting
  • Ans. 

    The 1st Aluform mockup concreting typically takes 1-2 days to complete.

    • 1-2 days is the usual timeframe for 1st Aluform mockup concreting

    • Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration

    • Proper planning and coordination can help expedite the process

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shimizu Senior Site Engineer interview:
  • Construction
  • Structural
  • Quality Control
  • Quality Assurance
  • Bar Bending Schedule
  • Project Execution
Interview preparation tips for other job seekers - Be active and action to learn every step and work hard and smart . Please ensure technical criticis and how it resolve it
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. What do you know about our company

Interview Preparation Tips

Interview preparation tips for other job seekers - they will ask about some finance knowledge and the rest is just a normal interview question
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. On core subject, logical questions
Round 2 - HR 

(1 Question)

  • Q1. About Bio, As per resume

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join in this company as intern.

Interview Questionnaire 

3 Questions

  • Q1. How many kinds of piping.
  • Ans. 

    There are several types of piping used in various industries, including process piping, utility piping, and plumbing piping.

    • Process piping is used to transport fluids or gases in industrial processes.

    • Utility piping is used for services such as water, steam, or compressed air.

    • Plumbing piping is used for water supply and drainage systems in buildings.

    • Other types of piping include fire protection piping, gas piping, and r

  • Answered by AI
  • Q2. If any body have experience of construction, how to,get shut down experience.
  • Ans. 

    Shut down experience can be gained by working on projects that involve plant shutdowns or turnarounds.

    • Look for job opportunities in industries that require shutdowns, such as oil and gas, petrochemicals, and power plants.

    • Volunteer to work on shutdown projects to gain experience.

    • Attend training courses and workshops on shutdown management.

    • Network with professionals in the industry to learn about upcoming shutdown projec...

  • Answered by AI
  • Q3. Where did used DSS Pope.
  • Ans. 

    I'm sorry, but I cannot answer this question as it does not make sense.

    • The question seems to be incomplete or incorrect.

    • There is no context or information provided to understand what is being asked.

    • Please provide more details or rephrase the question.

  • Answered by AI

I applied via Walk-in and was interviewed before Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Coding Test 

Mi boss questio how much Mili toli Roop I answer 6 plus 8 mm
How much host Roop 18+20+22 mm
Other question how much showing his degre
I am answer 3.60 degree sho wing
Other question LEBBIRR AND POTAIN AND AEC Crain Operator

Round 3 - Group Discussion 

Good working good speak good profession of course good telling no understand no talk me you understand you talk me you know understand work no understand working

Interview Preparation Tips

Interview preparation tips for other job seekers - You got travelling working understand 100% you tell me you working company

I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - HR 

(8 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why should we hire you?
  • Q5. Why are you looking for a change?
  • Q6. Where do you see yourself in 5 years?
  • Q7. What are your strengths and weaknesses?
  • Q8. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - I am very happy to work in previous company that amazing infra pvt ltd.

Tell us how to improve this page.

Interview Questions from Similar Companies

Eversendai Interview Questions
3.6
 • 28 Interviews
Archirodon Interview Questions
3.9
 • 16 Interviews
Arup Interview Questions
3.8
 • 12 Interviews
Shimizu Interview Questions
4.1
 • 11 Interviews
View all
Kaefer Senior HSE Supervisor Salary
based on 4 salaries
₹8.5 L/yr - ₹15 L/yr
13% more than the average Senior HSE Supervisor Salary in India
View more details

Kaefer Senior HSE Supervisor Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

4.0

Salary

4.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Planning Engineer
22 salaries
unlock blur

₹10 L/yr - ₹14 L/yr

HSE Officer
16 salaries
unlock blur

₹4 L/yr - ₹15 L/yr

Safety Officer
12 salaries
unlock blur

₹4 L/yr - ₹13.4 L/yr

Assistant Manager
6 salaries
unlock blur

₹18 L/yr - ₹27 L/yr

Project Manager
6 salaries
unlock blur

₹20 L/yr - ₹39 L/yr

Explore more salaries
Compare Kaefer with

Saudi Binladin Group

4.1
Compare

Eversendai

3.6
Compare

Descon Engineering

4.0
Compare

Amara Raja Infra

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview