Upload Button Icon Add office photos

Filter interviews by

K. K. Gupta Constructions Billing and Planning Manager Interview Questions and Answers

Updated 21 Apr 2021

K. K. Gupta Constructions Billing and Planning Manager Interview Experiences

1 interview found

I applied via Walk-in and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. All questions regarding my previous experience
  • Q2. Reason for leaving previous company.

Interview Preparation Tips

Interview preparation tips for other job seekers - Kindly update your CVs , whatever you worked , no need to make your CV more attractive by using random work which you have not done. Questions always asked according to your CV and your qualification

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via LinkedIn and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Sir, At interview technical questions only asked about the following. Segregation Bleading WTP function process Stirups bend degree/d length RCC PCC weight Cement density Chlorine limit in water Ld length...
  • Q2. Reason for left of Previous company
  • Q3. Self Introduction
  • Q4. CTC present and expected
Interview experience
4
Good
Difficulty level
Hard
Process Duration
-
Result
-

I applied via Company Website and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Core Technical questions related to job profile
  • Q2. Billing process, some quantity Question
Round 2 - Aptitude Test 

Summary question and also some coding of alphabet

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Tax deduction in RA BILL
  • Ans. 

    Tax deduction in RA BILL

    • Tax deduction is applicable on certain items in a RA bill

    • The deduction amount varies based on the item and tax laws

    • Examples of items with tax deduction include TDS, GST, and service tax

  • Answered by AI
  • Q2. What is price Escalation
  • Ans. 

    Price escalation refers to the increase in the cost of goods or services over time.

    • It is a common phenomenon in the construction industry where the cost of materials and labor increases over time.

    • Price escalation can be caused by various factors such as inflation, changes in market demand and supply, and changes in government policies.

    • It is important for billing engineers to take price escalation into account when esti...

  • Answered by AI
  • Q3. Volume for trapezoidal shape
  • Ans. 

    The volume of a trapezoidal shape can be calculated using its height and the lengths of its parallel sides.

    • The formula for calculating the volume of a trapezoidal shape is (1/2) x height x (length of parallel side 1 + length of parallel side 2)

    • The height is the perpendicular distance between the parallel sides

    • For example, if the trapezoidal shape has a height of 5 units, a length of parallel side 1 of 8 units, and a le...

  • Answered by AI
  • Q4. Wastage for concrete,steel etc
  • Ans. 

    Wastage for concrete and steel depends on various factors such as site conditions, workmanship, and design.

    • Wastage for concrete can range from 2% to 10% depending on the quality of workmanship and site conditions.

    • Wastage for steel can range from 2% to 5% depending on the design and fabrication process.

    • Factors such as improper handling, cutting, and bending can also contribute to wastage.

    • Proper planning and management c...

  • Answered by AI
  • Q5. Variation for extra items
  • Ans. 

    Variation for extra items is a common occurrence in construction projects.

    • Extra items may include additional work, materials, or changes in design.

    • The variation may be initiated by the client or due to unforeseen circumstances.

    • The billing engineer must accurately document and price the extra items.

    • The variation may require approval from the client and/or consultant before proceeding.

    • Examples of extra items include addi...

  • Answered by AI
Round 3 - Technical 

(3 Questions)

  • Q1. About Variation
  • Q2. Difference between account and billing Engineer
  • Ans. 

    An account engineer manages financial accounts while a billing engineer handles billing and invoicing.

    • Account engineers manage financial accounts and ensure that all financial transactions are recorded accurately.

    • Billing engineers handle billing and invoicing processes, ensuring that customers are billed correctly and payments are received on time.

    • While both roles involve financial management, account engineers focus o...

  • Answered by AI
  • Q3. Management skills related

Interview Preparation Tips

Interview preparation tips for other job seekers - Confident and fearless be ready fr any kind of result in the end

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General Questions on yourself and previous organisation
Round 3 - Technical 

(2 Questions)

  • Q1. Question will be asked by you on your applied job profile, for eg if you are applying for billing engineer question will be on billing like what types of billing till you have done like milestone billing, ...
  • Q2. What is JMR. What is LD In terms of Billing. Software knowledge like excel MS word &. Power point
Round 4 - Document review 

(1 Question)

  • Q1. What is LD in billing, What is JMR, Mandatory document required for bill to be raised etc
  • Ans. 

    LD in billing stands for Liquidated Damages, JMR stands for Joint Measurement Report, Mandatory documents include BOQ, drawings, work order, etc.

    • LD in billing refers to Liquidated Damages, which are penalties imposed on contractors for delays in project completion.

    • JMR stands for Joint Measurement Report, which is a document used to record measurements taken jointly by the client and contractor to verify quantities of w...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions related to core subject and experience
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical Questions related to core subjects and experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Job insecurity in PMC B+P department .
If you are looking for long term job > i would suggest go for other PMC

I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Rates of sub-contractors . Billing process. Reconciliation means and how it is done. Rate Analysis. Key points of your last project. Type of structure that you had seen in your last company. And their deta...
  • Ans. 

    The interview covered topics such as rates of sub-contractors, billing process, reconciliation, rate analysis, previous project experience, and types of structures encountered.

    • Explained the process of obtaining rates from sub-contractors and how they are incorporated into the billing process

    • Discussed the importance of reconciliation in ensuring accurate billing and payment

    • Described the process of rate analysis and how ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident and never ever show that u r nervous even if u don't know the answer.
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Quantity surveyor
  • Q2. Planning & monitoring
  • Q3. Regarding to Billing and Planning

Interview Preparation Tips

Interview preparation tips for other job seekers - no
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Escalation, Contractor bill
  • Q2. Esclation, is code 1200 all part

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good company but salary late

Billing Engineer Interview Questions & Answers

TCE user image Er. Vyankatesh Gundu

posted on 30 Nov 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Tell me about your self
  • Q2. Qualification & Experience details
  • Q3. What is your Salary Expectation
Round 3 - Technical 

(3 Questions)

  • Q1. What is Pile Foundation?
  • Ans. 

    Pile foundation is a type of deep foundation used to transfer heavy loads of a structure to a deeper level of soil or rock.

    • Pile foundation is used when the soil at the surface is not strong enough to support the weight of the structure.

    • It consists of long, slender columns made of concrete, steel or timber that are driven into the ground.

    • The piles are driven deep enough to reach a layer of soil or rock that is strong en...

  • Answered by AI
  • Q2. Basics of civil engineering
  • Q3. Major Bridge, Viaduct
Round 4 - HR 

(3 Questions)

  • Q1. Salary Discussion & finalization
  • Q2. Posting Related Questions
  • Q3. General questions by employee and answers by HR

Interview Preparation Tips

Interview preparation tips for other job seekers - study basics of civil engineering, study related to job profile

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.6
 • 257 Interviews
TCE Interview Questions
3.8
 • 247 Interviews
Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 114 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
Worley Interview Questions
4.1
 • 109 Interviews
View all
Site Engineer
4 salaries
unlock blur

₹1.8 L/yr - ₹4.5 L/yr

Quality Engineer
4 salaries
unlock blur

₹3.5 L/yr - ₹3.6 L/yr

Accountant
3 salaries
unlock blur

₹3 L/yr - ₹4 L/yr

Purchase Manager
3 salaries
unlock blur

₹3.5 L/yr - ₹4.2 L/yr

Executive Accountant
3 salaries
unlock blur

₹1.8 L/yr - ₹2.8 L/yr

Explore more salaries
Compare K. K. Gupta Constructions with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare

Tata Technologies

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview