Filter interviews by
I applied via Approached by Company and was interviewed in Feb 2022. There were 3 interview rounds.
posted on 2 Feb 2023
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
Discussed about experience, discussed about technical and professional skills
Good attitude and best interview procedure
On subject matter related to legal compliance.
posted on 21 Jul 2024
Materials can be received through purchase orders, deliveries, or transfers. The basic procedure involves receiving, inspecting, documenting, and storing the materials.
Materials can be received through purchase orders placed with suppliers.
Deliveries can be made directly to the storage location or to a designated receiving area.
Materials can also be received through transfers from other departments or locations.
The bas...
Client material receipt/BOQ items procedure involves thorough inspection, documentation, and verification.
Upon receipt of client materials, conduct thorough inspection for damages or discrepancies.
Document all received items in a log or system for tracking purposes.
Verify received items against the Bill of Quantities (BOQ) to ensure accuracy.
Report any issues or discrepancies to the relevant stakeholders for resolution...
I applied via Campus Placement and was interviewed before Jul 2022. There were 4 interview rounds.
General questions like time speed distance, clocks, seating arrangement, probability etc.
Very generic topic as earlier it was for a site engineer post.
Types of road failures, types of contracts, FIDIC red book and silver book, critical path definition
Types of road failures include rutting, cracking, potholes, and edge cracking
Types of contracts in construction projects include lump sum contracts, cost plus contracts, and unit price contracts
FIDIC red book is a standard form of contract for construction, and FIDIC silver book is for turnkey projects
Critical path is th...
Workability of concrete refers to its ease of placement and compaction. Slump value of M30 concrete is measured using a slump cone. Bar bending schedule is a document detailing the reinforcement steel bars in a structure.
Workability of concrete refers to how easily it can be mixed, placed, and compacted.
Slump value of M30 concrete is measured using a slump cone test, where the concrete is placed in the cone and then th...
To remove voids between aggregates while concreting, proper compaction techniques should be used.
Use vibrating equipment to settle the concrete and remove air voids
Ensure proper grading and mix design to minimize voids
Use additives like superplasticizers to improve workability and reduce voids
Properly consolidate the concrete by using appropriate techniques such as rodding or tamping
I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
Cracks in PQC occur due to various reasons such as improper curing, poor quality of materials, and inadequate thickness. Tests and checks performed during PQC include slump test, compressive strength test, and surface hardness test. Pre-checks include ensuring proper subgrade preparation and post-checks include checking for cracks and surface defects. Cracks can be arrested by using epoxy injection or polyurethane grou...
I have experience in airfield marking using various types of markings such as runway centerline, taxiway edge, and hold line markings.
I have used paint and thermoplastic materials for marking.
I have followed FAA regulations and guidelines for marking dimensions and placement.
I have also assisted in the maintenance and repainting of existing markings.
Examples of markings I have done include runway threshold markings, to...
I applied via Walk-in and was interviewed before Oct 2022. There were 4 interview rounds.
Quantity surveying is the process of managing costs and budgets for construction projects.
Involves estimating and monitoring costs throughout the project
Includes preparing tender documents, negotiating contracts, and valuing completed work
Helps ensure projects are completed within budget and on time
Requires knowledge of construction methods, materials, and regulations
Quantity surveyors are responsible for managing costs and budgets for construction projects.
Preparing cost estimates and budgets for construction projects
Monitoring and controlling project costs
Advising on procurement strategies to obtain the best value for money
Assessing and valuing variations to the contract
Preparing and submitting final accounts
Mode of measurement refers to the method or tool used to collect data in order to quantify a particular variable.
Different modes of measurement include self-report surveys, observational methods, and physiological measurements.
For example, in a study on stress levels, self-report surveys may be used to measure perceived stress, while physiological measurements like heart rate or cortisol levels can provide objective da...
I applied via Naukri.com and was interviewed in Oct 2023. There were 3 interview rounds.
I worked at XYZ Company as a Deputy Manager.
Managed a team of 10 employees
Implemented new strategies to increase productivity
Achieved a 20% increase in sales within the first year
Streamlined processes to improve efficiency
based on 1 review
Rating in categories
Assistant Manager
11
salaries
| ₹5.7 L/yr - ₹11.5 L/yr |
Sales Officer
11
salaries
| ₹2.5 L/yr - ₹6 L/yr |
Mechanical Engineer
8
salaries
| ₹3.2 L/yr - ₹7.6 L/yr |
Senior Engineer
7
salaries
| ₹4.2 L/yr - ₹6.6 L/yr |
Engineer
5
salaries
| ₹3 L/yr - ₹4 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures