i
Jyoti Structures
Filter interviews by
Clear (1)
I applied via LinkedIn and was interviewed before Dec 2022. There were 2 interview rounds.
There are several types of surveys, and the first survey is typically a baseline survey.
There are various types of surveys such as customer satisfaction surveys, employee engagement surveys, market research surveys, etc.
The first survey is often a baseline survey, which establishes a starting point for future comparisons or measurements.
Baseline surveys are conducted to gather initial data or establish benchmarks befor...
The number of pegs required to mark for A-type foundation depends on the specific requirements of the project.
The number of pegs required may vary based on the size and shape of the foundation.
The complexity of the design and the presence of any additional features can also affect the number of pegs needed.
It is important to consult the project plans and specifications to determine the exact number of pegs required.
For...
The amount of cement required for a tower foundation RCC depends on various factors such as the size and height of the tower, soil conditions, and design specifications.
The quantity of cement is determined by the volume of concrete required for the foundation.
The volume of concrete is calculated by multiplying the length, width, and height of the foundation.
The cement content in concrete is typically expressed as a per...
The question is unclear and does not make sense.
The question seems to be incomplete or incorrectly phrased.
It is unclear what is meant by 'Tower foundation line up to see'.
There is not enough information provided to answer the question.
It is recommended to seek clarification or ask for more details.
The working point for foundation refers to the specific goals and objectives that the foundation aims to achieve.
The working point for foundation is determined by its mission and vision.
It includes the specific areas or issues the foundation focuses on.
For example, a foundation working on education may have a working point of improving literacy rates in underprivileged communities.
The working point may also include the...
The tools required for tower foundation include concrete mixers, rebar cutters, excavators, and leveling instruments.
Concrete mixers are used to mix the concrete for the foundation.
Rebar cutters are necessary to cut and shape the reinforcement bars.
Excavators are used to dig the foundation hole and remove excess soil.
Leveling instruments such as laser levels or spirit levels are used to ensure the foundation is level a
Top trending discussions
posted on 10 Sep 2017
I was interviewed before Sep 2016.
posted on 10 Sep 2015
I applied via PLACEMENT
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
posted on 12 May 2018
I was interviewed before Nov 2016.
Yes, I am willing to work at any location for the Senior Engineer position.
I am open to relocating for the right opportunity
I have experience working in different locations
I am flexible and adaptable to new environments
I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.
I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.
I am adaptable and can quickly assess a situation to determine the best course of action.
I have strong problem-solving skills and can think creatively to find solutions in ad
I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.
posted on 11 Jun 2022
I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.
Mathematics, English, Reasoning
An antenna is a device that converts electrical signals into electromagnetic waves and vice versa. Satcom is short for satellite communication.
Antennas are used for transmitting and receiving signals in various applications such as radio, television, and wireless communication.
Satcom refers to the use of satellites for communication purposes, including television broadcasting, internet access, and military communicatio...
Clean India
Corruption
posted on 14 Jul 2021
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Senior Executive
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Supervisor
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
KEC International
Kalpataru Projects International
Suzlon Group
BHEL