Filter interviews by
I was interviewed in Aug 2024.
Top trending discussions
I applied via Walk-in and was interviewed in Dec 2024. There were 3 interview rounds.
I was interviewed in Dec 2024.
I applied via Referral and was interviewed in Dec 2023. There were 4 interview rounds.
Spare parts are components used in boilers to replace damaged or worn-out parts and ensure their proper functioning.
Spare parts are essential for maintaining and repairing boilers.
They help in replacing faulty or damaged components to prevent breakdowns.
Examples of spare parts in boilers include valves, pumps, gaskets, and sensors.
Regular inspection and inventory management of spare parts are crucial for efficient boil...
Spare parts in a boiler are components that are kept on hand to replace any faulty or worn-out parts.
Spare parts ensure the smooth operation of a boiler by allowing for quick repairs and replacements.
Common spare parts in a boiler include valves, pumps, gaskets, pressure switches, and control boards.
Having spare parts readily available reduces downtime and increases the lifespan of the boiler.
Regular maintenance and in...
Boiler feed pump is used in power plants to supply water to the boiler at high pressure.
Boiler feed pump is a type of centrifugal pump.
It is used to deliver feedwater to the boiler at high pressure.
The pump increases the pressure of the water to overcome the boiler's pressure requirement.
It ensures a continuous supply of water to the boiler for steam generation.
The pump is typically driven by an electric motor or a ste...
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There was 1 interview round.
I applied via Referral and was interviewed in Jun 2023. There were 5 interview rounds.
P2P process refers to the Procure-to-Pay process, which involves the entire cycle of purchasing goods or services and making payments for them.
P2P process starts with identifying the need for a product or service and creating a purchase requisition.
The requisition is then approved and converted into a purchase order.
The purchase order is sent to the supplier, who delivers the goods or services.
Upon receipt, the goods a...
posted on 20 Jun 2023
The total amount of work undertaken is difficult to quantify as it varies depending on the specific tasks and projects being managed.
The total amount of work can be measured in terms of number of projects completed within a certain time frame.
It can also be measured in terms of the number of tasks or activities completed by the team.
The complexity and size of each project or task should also be taken into consideration...
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Merchandiser
6
salaries
| ₹4.1 L/yr - ₹5 L/yr |
Quality Assurance
4
salaries
| ₹1 L/yr - ₹5 L/yr |
Labour Welfare Officer
4
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Assistant Merchandiser
4
salaries
| ₹1.5 L/yr - ₹2.3 L/yr |
Deputy Manager Quality Assurance
4
salaries
| ₹5 L/yr - ₹7 L/yr |
Quess
L&T Construction
Udaan
Ekart Logistics