Filter interviews by
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
G D & T symbols are geometric dimensioning and tolerancing symbols used to define the geometry of parts and assemblies.
G D & T symbols are used to specify the allowable variations in form, size, orientation, and location of features on a part.
Examples of G D & T symbols include concentricity, perpendicularity, flatness, and position.
These symbols help ensure clear communication between designers, engineers, and manufac...
SPC stands for Statistical Process Control. Cp and Cpk are indices used to measure process capability.
SPC is a method of quality control which uses statistical tools to monitor and control a process.
Cp is a measure of process capability that compares the spread of the process to the tolerance range. Cp = (USL - LSL) / (6 * standard deviation)
Cpk is a measure of process capability that accounts for process centering. Cp...
The instruments least count I use vary depending on the specific instrument, but typically range from 0.01mm to 0.001mm.
Least count refers to the smallest measurement that can be read on a particular instrument.
Common least counts include 0.01mm for vernier calipers, 0.001mm for micrometers, and 0.1g for weighing scales.
Choosing the appropriate instrument with the right least count is crucial for accurate measurements.
I appeared for an interview before Feb 2024.
I appeared for an interview before Jun 2016.
I applied via Walk-in
I applied via Walk-in
Yes, Heathrow airport should go ahead with adding a 5th terminal.
Heathrow is one of the busiest airports in the world and needs to expand to accommodate increasing demand.
A 5th terminal would provide more capacity for airlines and passengers, reducing congestion and improving the overall experience.
The construction of the terminal would also create jobs and boost the local economy.
However, careful planning and consider...
I applied via Walk-in
A new terminal at an airport is required to accommodate increasing passenger traffic and improve overall airport experience.
Current terminal may be overcrowded and unable to handle the volume of passengers
New terminal can provide additional gates, lounges, and amenities for passengers
Improved airport experience can attract more airlines and increase revenue
New terminal can also incorporate modern technology and sustain...
I applied via Referral
Profit decrease reasons for company X
Decrease in sales revenue
Increase in production costs
Economic downturn
Competition
Changes in consumer behavior
Poor management decisions
External factors such as natural disasters or political instability
Consulting offers diverse opportunities to work with different clients and industries, constantly learn and grow, and make a significant impact.
Consulting provides exposure to a variety of clients and industries, allowing for continuous learning and development.
Consultants have the opportunity to work on challenging projects and solve complex problems.
Consulting offers the chance to make a significant impact on clients...
based on 2 interviews
Interview experience
based on 21 reviews
Rating in categories
Engineer
6
salaries
| ₹3 L/yr - ₹3.9 L/yr |
Assistant Manager
5
salaries
| ₹4.2 L/yr - ₹6 L/yr |
Senior Engineer
5
salaries
| ₹2.4 L/yr - ₹4.5 L/yr |
Assistant Engineer
5
salaries
| ₹2 L/yr - ₹2.7 L/yr |
Quality Engineer
5
salaries
| ₹1.8 L/yr - ₹2.9 L/yr |
MagicBricks
State Street Syntel
Sterling & Wilson
AXA Business Services